Original Manual. DK: Telthal S: Tälthall D: Zelthalle GB: Tent hall

Størrelse: px
Starte visningen fra side:

Download "Original Manual. DK: Telthal S: Tälthall D: Zelthalle GB: Tent hall"

Transkript

1 Original Manual DK: Telthal S: Tälthall D: Zelthalle GB: Tent hall DK S D GB

2

3 DK Original Brugsanvisning Varenr telthal Beskrivelse: Telthal opbygget med kraftig stålrørsramme. Benyttes som maskinhus eller lagerhal. Tilsigtet anvendelse: Telthallen må kun opstilles og anvendes som beskrevet i denne brugsanvisning. Al anden anvendelse betragtes som forkert. Bemærk. Telthallen er ikke anvendelig som partytelt! Indhold Specifikationer... 2 Sikkerhedsinstruktioner... 2 Oversigtstegning... 3 Komponentliste... 4 Opsætning... 5 A: Stolpefødder placering... 5 B: Rør-stel samling... 7 C: Teltdugen... 8 D: Gavlender... 9 Vejledende detaljefotos Efter montering EU Overensstemmelseserklæring MAN DK V8 P. Lindberg A/S Sdr. Ringvej 1 Tlf: DK-6600 Vejen salg@p-lindberg.dk

4 Specifikationer Længde: 9.15m Bredde: 7.9m Højde: 4.20m (Mål er udvendig målt ikke målfast) Portmål: Bredde: 3,6m Højde: 3,05m Sikkerhedsinstruktioner Læs denne sikkerhedsinstruktion grundigt før samlingen. 1. Sørg for at området hvor telthallen skal stå, er ryddet. 2. Sæt ikke telthallen op i blæsevejr. 3. Kom ikke for tæt på teltdugen med varmeapparater. Brug ikke varmeapparater med åben flamme. 4. Brug kun godkendt stillads eller lifte når der arbejdes i højden. Stiger, og andre ustabile indretninger, må ikke anvendes pga. nedstyrtningsfare. 5. Vær opmærksom på ikke at få fingrene i klemme ved samling af telthallen. Generelt 1. Sørg for, at der ikke ligger større mængder sne på taget af telthallen. 2. Regelmæssig efterspænding af forskellige barduner og gjorde. 3. Check regelmæssig at bolte er spændte og splitter er monteret. 2 MAN DK V8 P. Lindberg A/S Sdr. Ringvej 1 Tlf: DK-6600 Vejen salg@p-lindberg.dk

5 Oversigtstegning 3 MAN DK V8 P. Lindberg A/S Sdr. Ringvej 1 Tlf: DK-6600 Vejen salg@p-lindberg.dk

6 Komponentliste Fig No Varenavn Antal Kasse 1 Rygnings buer 5 B 2 Lige tagforlænger 6 A 2A Lige tagforlænger - ende 4 A 3 Lodrette ben 10 B 4 Vandrette tværstænger 28 A 5 Stolpefødder, hjørne 4 B 6 Ende stolpefødder 2 B 6A Ende stolpefødder 2 B 7 Side stolpefødder - midt 6 B 8 Lodrette stolperør portåbning nederste 4 A 9 Lodrette stolperør portåbning øverste 4 A 10 Støtterør øverst portåbning 4 A 11 Nederste forlænger rør 4 A 12 Hjørnevinkler 4 B 13 Bolte M12X100 (til position 4) 35 B 14 Bolte M10x30 (til position 2A) 12 B 15 Bolte M10X90 76 B 16 Nederste stammerør (teltdug) 5 stk. pr sæt 2 sæt A 17 Spænde spil 10 B 18 Tag dug 1 A 19A Endegavle dug m. åbning 1 A 19B Endegavle dug - lukket 1 A 20 Spændestropper 10 A 21 Reb til fastsurring af teltdug 1 bundt A 22 Nylonstropper (400 mm) til gavle Nylonstropper (600 mm) til tag Jord spyd 100 cm 28 B 24 Gevind spyd 60 cm 10 B 25 Håndtag til gevindspyd 1 B 26 Spænde wire 4 A 27 Plastik prop til forlængerrør 4 B 28A Øverste rør baggavl 2 A 28B Nederste rør baggavl 2 A 28C Rørholder nederst 28B 1 B A 4 MAN DK V8 P. Lindberg A/S Sdr. Ringvej 1 Tlf: DK-6600 Vejen salg@p-lindberg.dk

7 29 Clips til position 26 8 B 30 Bolt M10x100 til position 10 4 B Opsætning Nødvendige hjælpematerialer til opsætning: 1. Målebånd 2. Rettesnor 3. Pinde 4. Stiger 5. Forhammer 6. Bor/boremaskine 7. Skruenøgle A: Stolpefødder placering Se diagram til ca. placering af stolpefødder (Fig 2) Målene er ca. mål. Totalmål (915cm x 790cm) målt udvendig på rørene. Stolpefødderne placeres nøjagtig under samling af teltet. Start i det ene hjørne og saml videre fag for fag. Vær sikker på krydsmålene er 12,05 meter og at de er ens. Målet er målt mellem midt rør på endespær til midt rør på endespær. 5 MAN DK V8 P. Lindberg A/S Sdr. Ringvej 1 Tlf: DK-6600 Vejen salg@p-lindberg.dk

8 Montering af stolpefødder Der er 3 huller i monteringspladen, 1 hul til gevindjordspyddet og 2 huller til de lige jordspyd. Se Fig 3 hvordan de forskellige spyd skal monteres. Herunder vises hvor de forskellige spyd bør placeres i stolpefødderne. (Fig 3) Gevindspyd (No 24) Lige jordspyd 2stk (No 23) Opmærkning af huller 1. Placer stolpefoden ved udgangspunktet (det ene hjørne), tag jordspyddet og lav en markering med dette. Fjern stolpefoden og kontroller at markeringen er tydelig. 2. Brug håndtaget (No.25) til at skrue gevindspyddet ned i jorden. Lad en passende del af spyddet stikke over jorden. Placer nu stolpefoden over gevindspyddet, monter skive og møtrik løst. 3. Når rammen er færdigsamlet og rettet op, spændes møtrikkerne og de resterende jordspyd bankes i. OBS: Gevindspyddet og de lige spyd kan ikke anvendes. Hvis jorden er frossen. Hvis der er klippegrund. Hvis der er betongrund. 6 MAN DK V8 P. Lindberg A/S Sdr. Ringvej 1 Tlf: DK-6600 Vejen salg@p-lindberg.dk

9 B: Rør-stel samling Buerne samles først. Begynd med at samle rygningsbuerne (Del no 1) med de lige tagforlængere (Del No 2) og til sidst de lodrette ben (Del No 3). Monter derefter boltene M10x90 (Del No 15) Vær opmærksom på at bolthovederne er ude imod teltdugen og ikke møtrikkerne. Rejs nu buen op og monter den på den ene stolpefod. Når den er fixeret i den ene side, rettes det andet ben til. Buen sikres så den ikke kan vælte og spændes derefter fast til stolpefoden. Bemærk. Buerne vil være bredere end stolpeføddernes placering. Når man har rejst de første 2 buer, monteres de vandrette tværstænger (Del No 4) Disse spændes fast med boltene M12x100 ( Del No 13). Derefter kan den tredje bue rejses, spændes løst på stolpefødderne og derefter monteres tværstængerne. De følgende buer rejses på samme måde. Til slut monteres stiverne i enderne. Se på Fig 1 hvordan vinklerne (Del No 12) der forbinder sidestiverne (Del No 10) med gavlene monteres. Og gavlstiverne der holder tagstiverne (Del No 9) med boltene M 10x30 (Del No 14). Monter nu stabiliseringswirerne (Del No 26) imellem sidevæggenes lodrette stolper. Længden skal justeres. 7 MAN DK V8 P. Lindberg A/S Sdr. Ringvej 1 Tlf: DK-6600 Vejen salg@p-lindberg.dk

10 C: Teltdugen Monter ikke teltdugen i kraftig blæsevejr! Men en let brise kan være en fordel, især hvis vindretningen er optimal. Hvis det er muligt at trække teltdugen op over buerne, sådan at vinden kommer ind under teltdugen vil den være til hjælp. Evt. mærk midten af tagdugen på indvendig side, så dugen placeres nøjagtig midt på telthallen når den trækkes over spærene. Saml det rør som skal skubbes ind i teltdugen først. Se Fig 5. Rul teltdugen ud foran telthallen og ret dugen til, så den passer i bredden. Træk nu dugen lige over buerne. Vær opmærksom på ikke at trække for voldsomt i teltdugen, så denne rives itu. Det kan være nødvendigt at løfte teltdugen over den første bue, evt. med en kost eller lignende. Når teltdugen er trukket over rør-stellet og rettet til, stikkes rørene ind i lommen på teltdugen og spændes let til. Nu kontrolleres at teltdugen hænger rigtigt i hjørnerne. Derefter kan spænderne (Del No 20) strammes lige op. Vær opmærksom på at teltdugen stikker lige langt ud i begge ender. Med flapperne vippet over kan man nu komme til at snøre teltdugen fast til buerne, med det medleverede reb. Dette skal skæres af i passende længder. Det anbefales at man trækker rebet igennem alle huller fra bunden og op til toppen. Derefter strammer man fra toppen jævnt til i begge sider, indtil man når bunden igen. Sy begge ender inden der strammes op for at undgå af dugen trækkes til den ene ende. Til sidst strammer man op med den pågældende spændestrop. Bue for bue. 8 MAN DK V8 P. Lindberg A/S Sdr. Ringvej 1 Tlf: DK-6600 Vejen salg@p-lindberg.dk

11 D: Gavlender Monter befæstning i de tilhørende holdere. Brug de medfølgende nylonstropper til at fastgøre teltdugen til rørstiverne med. Det samme gælder de lodrette rørstivere i portgavlen. Fastgørelse af gavlender Nu snøres enderne sammen. Vær opmærksom på at folderne folder sig pænt sammen og sidder tæt til rammen. Snorenderne fæstnes til de clips som sidder ved stolpefødderne i hvert hjørne. Telthallen er nu opstillet 9 MAN DK V8 P. Lindberg A/S Sdr. Ringvej 1 Tlf: DK-6600 Vejen salg@p-lindberg.dk

12 Vejledende detaljefotos 4 5 Fig. 1 Spænde wirerne Fig. 2 Snøresamlingen i gavlende Fig. 3 Snøresamling i siderne Fig. 4 Portåbning ca. 3,1 X 3,6m Fig. 5 Portåbning lukket Efter montering Sørg for at holde teltdugen stram. Teltdugen kan blive slap og danne hængekøjer på taget. Det anbefales at spænde dugen op et par gange efter et par måneders brug. Dette er især vigtigt, hvis teltet stilles op ved kolde temperaturer (efterår / vinter) da dugen bliver lidt løsere jo varmere det bliver. Det kan derfor være en fordel at stramme taget inden vinteren. Det er ejerens ansvar at fjerne evt. sneen straks, hvis den ikke glider ned af sig selv. 10 MAN DK V8 P. Lindberg A/S Sdr. Ringvej 1 Tlf: DK-6600 Vejen salg@p-lindberg.dk

13 EU Overensstemmelseserklæring Vi forbeholder os ret til uden foregående varsel at ændre de tekniske parametre og specifikationer for dette produkt. 11 MAN DK V8 P. Lindberg A/S Sdr. Ringvej 1 Tlf: DK-6600 Vejen salg@p-lindberg.dk

14 S Original Bruksanvisning Art.: Tälthall Beskrivning: Tälthallen är uppbyggd med en kraftig stålrörsram. Kan användas som maskinhall eller lagerhall. Avsedd användning: Får bara användas som bruksanvisningen anger all annan användning anses som felaktig. Varning! Tälthallen ska inte användas som ett partytält! Innehåll Specifikationer... 2 Säkerhetsföreskrifter... 2 Sprängskiss... 3 Dellista... 4 Montering... 5 A: Stolp-fötternas placering... 5 B: Rörställning montering... 7 C: Tältduken... 8 D: Gavlarna... 9 Vägledande bilder av detaljer: Att tänka på efter montering EU Försäkran om överensstämmelse MAN SE V4 P. Lindberg Myrangatan 4 Tel: Enköping order@p-lindberg.se

15 Specifikationer Längd: 9.15m Bredd: 7.9m Höjd: 4.20m (Måttet är utvändigt mått) Säkerhetsföreskrifter 1. Håll arbetsplatsen ren. Montera inte upp tältet nära snödrivor, i blöta eller blåsiga områden. 2. Håll barn borta från arbetsområdet. 3. Montera inte tältet under påverkan av alkohol eller droger. 4. Var uppmärksam på eventuella blåsiga väderförhållande vid platsen där tältet ska monteras upp. Montera basen i betong om blåsiga väderförhållande är vanliga i området. 5. Montera inte tälthallen när det blåser. 6. Var försiktig med värmefläkt och el anordningar, håll avstånd till tältduken på grund av brandrisken. 7. Var noggrann med personlig säkerhet vid montering och användning, observera att det finns stor klämrisk! Generellt: 1. Se till att det inte finns större mängder snö på taket på tälthallen. 2. Regelmässig efterspänning av linor som är förseglade i marken. 3. Kontrollera kontinuerligt att alla skruvar och bultar är åtdragna. 2 MAN SE V4 P. Lindberg Myrangatan 4 Tel: Enköping order@p-lindberg.se

16 Sprängskiss 3 MAN SE V4 P. Lindberg Myrangatan 4 Tel: Enköping order@p-lindberg.se

17 Dellista Fig. Nr Varunamn Antal Låda 1 Ryggbåge 5 B 2 Takförlängare 6 A 2A Takförlängare ände 4 A 3 Lodräta ben 10 B 4 Övergripande tvärslag 28 A 5 Stolp-fötter hörn 4 B 6 Ände stolp-fötter 2 B 6A Ände stolp-fötter 2 B 7 Sida stolp-fötter - mitten 6 B 8 Lodräta stolprör portöppning nederst 4 A 9 Lodräta stolprör portöppning överst 4 A 10 Stödrör överst portöppning 4 A 11 Nedersta förlängningsrör 4 A 12 Hörnvinkel 4 B 13 Bult M12X100 (till position 4) 35 B 14 Bult M10X30 (till position 2 A) 12 B 15 Bult M10X90 76 B 16 Nedersta stam rör (tältduk) 5 st. per set 2 set A 17 Spänne 10 B 18 Takduk 1 A 19A Ändgavel duk med öppning 1 A 19B Ändgavel duk stängd 1 A 20 Spännstroppar 10 A 21 Rep till fastsurrning av tältduk 1 bunt A 22 Nylon stropp (400mm) till gavel 110 Nylon stropp (600ml) till tak 110 A 23 Jordspett 100 cm 28 B 24 Gängstång 60 cm 10 B 25 Handtag till gängstång 1 B 26 Wire 4 A 27 Plastplugg till förlängningsrör 4 B 28A Översta röret bakom gavel 2 A 28B Nedersta röret bakom gaveln 2 A 28C Rörhållare nederst 28B 1 B 29 Clips till position 26 8 B 4 MAN SE V4 P. Lindberg Myrangatan 4 Tel: Enköping order@p-lindberg.se

18 30 Bult M10 x 100 till position 10 4 B Montering Nödvändigt hjälpmaterial till uppsättning 1. Måttband 2. Rikt snöre 3. Spett 4. Stege 5. Slägga 6. Borrmaskin 7. Skruvnycklar A: Stolp-fötternas placering Se diagram till ca placering av stolp-fötter (Fig. 2) Måtten är ca utvändiga mått. Stolp-fötterna placeras noggrant under montering av tältet. Börja i ena hörnet och gå vidare fot för fot. Var säker på att kryssmåttet är korrekt och mäter 12,05 meter. Måttet är mätt på mitten av röret på änden till mitten av röret på änden. 5 MAN SE V4 P. Lindberg Myrangatan 4 Tel: Enköping order@p-lindberg.se

19 Montering av stolp-fötter Det är 3 hål i monteringsplattan, 1 hål till gängstångspjutet och 2 hål till de andra jordspetten. Se Fig. 3 hur dem olika spetten ska monteras. Var säker på att det är korrekt fastspänt. Här under visas hur de olika spetten bör placeras i stolp-fötterna. (Flig 3) Gängspett (No 24) och jordspett 2 st. (No 23) Uppmärkning av hål 1. Placera stolp-foten vid utgångspunkten (det ena hörnet), tag jordspettet och gör en markering med detta. Flytta stolp-foten och kontrollera att markeringen är tydlig. 2. Använd handtaget (No.25) till att skruva gängspettet ner i jorden. Låt en del av spettet sticka upp över jorden. Placera nu stolp-foten över gängspettet, montera bricka och muttern löst. 3. När ramen är monterad och upprätt spänn muttrarna och de resterande jordspetten slås ner. OBS: Gängspettet och de andra spetten kan inte användas: Om jorden är frusen Om det är berggrund Om det är betonggrund 6 MAN SE V4 P. Lindberg Myrangatan 4 Tel: Enköping order@p-lindberg.se

20 B: Rörställning montering Bågarna monteras först. Börja med att samla ihop ryggbågarna (Del no1) med takförlängarna (Del No 2) och till sist de lodräta benen (Del No 3). Montera därefter bultar M10x90 (Del No 15). Var uppmärksam på att bulthuvuden är ut mot duken och inte muttrarna. Res nu bågarna upp och montera den på den ena stolp-foten. När den är fixerad i den ena sidan rättas det andra benet till. Bågarna skall säkras så att den inte kan välta, spänn därefter fast stolp-foten. Varning: Bågarna kommer att vara bredare än stolp-fotens placering När man har rest dem två första bågarna, monteras de horisontella tvärstagen (Del No 4), de fästs med bultar M12x100 (Del No 13). Därefter kan den tredje bågen resas, spänns löst på stolp-fötterna och därefter monteras tvärstagen. Dem följande bågarna reses på samma sätt. Till slut monteras stagen i ändorna. Se på fig. 1 hur vinklarna (Del No 12) som håller ihop sidostagen (Del No 10) med gaveln monteras och gavelstagen som håller ihop takstagen (Del No 9) med bult M10x30 (Del No 14). Montera nu stabiliseringswiren (Del No 26) mellan sidoväggens lodräta stolpar. Längden skall justeras. 7 MAN SE V4 P. Lindberg Myrangatan 4 Tel: Enköping order@p-lindberg.se

21 C: Tältduken Montera inte tältduken i kraftigt blåsväder! Men en lätt vind kan vara en fördel ifall vindriktningen är optimal. Om det är möjligt att dra tältduken upp över bågarna med hjälp av vinden som kommer in under tältduken då kan det vara en stor hjälp. Ev. markera mitten av takduken på invändig sida, så duken placeras exakt noggrant i motten på tälthallen när den dras över takstolarna. Montera det rör som skall skjutas in i tältduken först Se Fig. 5. Rulla ut tältduken framför ställningen och rätta in duken så att den passar i bredden. Dra tältduken jämnt, försiktigt och långsamt rakt över bågarna. Var uppmärksam på att inte rycka för hårt i tältduken så den rivs sönder. Det kan vara nödvändigt att lyfta tältduken över den första bågen med en kvast eller liknade. När tältduken har dragits över rörställningen och rättats till sticks rören in i fickorna på tältduken och spänns lätt. Kontrollera att tältduken hänger riktigt i hörnen. Därefter kan spännena (Del No 20) dras åt. Var uppmärksam på att tältduken sticker lika långt ut i båda ändor. Med ändflikarna vända tillbaka och ur vägen kan man nu komma åt att snöra tältduken fast i bågarna, med det medföljande repet. Repet bör skäras av till passande längder. Det rekommenderade är att använda separata bitar av rep och börja snörningen genom hålen från botten och upp till toppen. Säkra repen längst upp i mitten och spänn på vägen ner på sidorna, tills man når botten igen. Fäst repet i nederkant. Man ska montera snören i båda ändor innan det dras åt för att undvika att duken dras till på ena sidan (då kan ena sidan bli för kort). Slutligen drar man åt med medföljande spännband. Båge för båge. 8 MAN SE V4 P. Lindberg Myrangatan 4 Tel: Enköping order@p-lindberg.se

22 D: Gavlarna Montera fäste till de tillhörande konsolerna. Använd nylon strop till att snöra kragarna i änden till rörstativen. Detsamma gäller dem lodräta rörstativen i portgaveln. Montering av gavlarna Nu snöras ändarna ihop. Var uppmärksam på att vecken blir fint tillsammans och sitter nära ramen. Snörändorna fästs i dem clips som sitter vid fotplattan i varje hörn. Nu är tältet uppställt! 9 MAN SE V4 P. Lindberg Myrangatan 4 Tel: Enköping order@p-lindberg.se

23 Vägledande bilder av detaljer: 1. Spänd wire 2. Rep i gavlarna 3. Rep i sidorna 4. Portöppning 3.3x3.6m 5. Portöppning stängd 4 5 Att tänka på efter montering Det är nödvändigt att dra åt tältduken för att undvika hängmattor på taket, och även dra åt en eller två gånger efter några månaders användning. Detta är viktigt när tältet monteras vid kalla temperaturer (vid höst/vinter). Eftersom tyget är hårt vid montering så kommer tyget bli alltmer slackt ju varmare det blir. Det kan därför vara en fördel att dra åt taket innan nästkommande vinter. Det är ägarens ansvar att ta bort snö omedelbart om det inte glider ned av sig själv. 10 MAN SE V4 P. Lindberg Myrangatan 4 Tel: Enköping order@p-lindberg.se

24 EU Försäkran om överensstämmelse Vi förbehåller oss rätten att ändra produktens tekniska parametrar och specifikationer utan föregående meddelande. 11 MAN SE V4 P. Lindberg Myrangatan 4 Tel: Enköping order@p-lindberg.se

25 D Original Bedienungsanleitung Artikelnr Zelthalle Beschreibung: Zelthalle zum Aufbau mit kräftigen Stahlrohrrahmen. Wird als Maschinenschuppen oder Lagerhalle genutzt. Zweckmäßige Verwendung: Die Zelthalle darf ausschließlich wie in dieser Gebrauchsanweisung beschrieben aufgestellt und verwendet werden. Jegliche andere Verwendung wird als nicht zweckmäßig angesehen. Hinweis: Die Zelthalle eignet sich nicht als Partyzelt! Inhalt Technische Daten... 2 Sicherheitsanweisungen... 2 Übersichtszeichnung... 3 Komponentenliste... 4 Aufstellen... 5 A: Platzierung der Stangenfüße... 5 B: Verbinden des Rohrgestells... 7 C: Zeltplane... 8 D: Giebelenden Beispielfotos Details Nach der Montage EU-Konformitätserklärung MAN DE V2 P. Lindberg GmbH Flensburger Str. 3 Tel / D Großenwiehe kontakt@p-lindberg.de

26 Technische Daten Länge: 9,15m Breite: 7,9m Höhe: 4,20m (Maße außen nicht maßstäblich) Torabmessungen: Breite: 3,6m Höhe: 3,05m Sicherheitsanweisungen Lesen Sie vor dem Zusammenbau diese Sicherheitsanweisungen gründlich. 1. Sorgen Sie dafür, dass der Bereich, in dem die Zelthalle stehen soll, geräumt ist. 2. Stellen Sie die Zelthalle nicht bei windigem Wetter auf. 3. Halten Sie mit der Zeltplane Abstand zu Heizgeräten. Verwenden Sie keine Heizgeräte mit offenen Flammen. 4. Verwenden Sie ausschließlich zertifizierte Gerüste und Lifte, wenn Sie in der Höhe arbeiten. Leitern und andere instabile Vorrichtungen dürfen aufgrund der Sturzgefahr nicht verwendet werden. 5. Bitte achten Sie darauf, dass die Finger beim Zusammenbau der Zelthalle nicht eingeklemmt werden. Allgemeines 1. Sorgen Sie dafür, dass auf der Zelthalle keine größeren Schneemengen liegen. 2. Ziehen Sie die verschiedenen Leinen und Gurte regelmäßig nach. 3. Kontrollieren Sie regelmäßig die Spannung der Schrauben und die Anbringung der Splinte. 2 MAN DE V2 P. Lindberg GmbH Flensburger Str. 3 Tel / D Großenwiehe kontakt@p-lindberg.de

27 Übersichtszeichnung 3 MAN DE V2 P. Lindberg GmbH Flensburger Str. 3 Tel / D Großenwiehe kontakt@p-lindberg.de

28 Komponentenliste Abb. Nr. Artikelbezeichnung Anzahl Box 1 Hauptbögen 5 B 2 Gerade Dachverlängerungen 6 A 2A Gerade Dachverlängerungen - Ende 4 A 3 Senkrechte Stützen 10 B 4 Waagrechte Querstreben 28 A 5 Stützenfüße, Ecken 4 B 6 Endstützenfüße 2 B 6A Endstützenfüße 6 B 7 Seitenstützenfüße - Mitte 2 B 8 Senkrechte Stützen Türöffnung unten 4 A 9 Senkrechte Stützen Toröffnung oben 4 A 10 Strebe oben Toröffnung 4 A 11 Unteres Verlängerungsrohr 4 A 12 Eckverbinder 4 B 13 Schrauben M12X100 (für Position 4) 35 B 14 Schrauben M10x30 (für Position 2A) 12 B 15 Schrauben M10X90 76 B 16 Unteres Hauptrohr (Zeltplane), 5 Stk. Pro Set 2 Sets A 17 Spannelement 10 B 18 Dachplane 1 A 19A Plane Endgiebel mit Öffnung 1 A 19B Plane Endgiebel - geschlossen 1 A 20 Spannschlaufen 10 A 21 Seil zum Befestigen der Zeltplane 1 A 22 Nylon Lasche (400 mm) für Giebel Nylon Lasche (600 mm) für Dach Erdspieß 100 cm 28 B 24 Gewindespieß 60 cm 10 B 25 Griff für Gewindespieß 1 B 26 Spannseil 4 A 27 Kunststoffstöpsel für Verlängerungsrohr 4 B 28A Oberes Rohr Giebelwand hinten 2 A 28B Unteres Rohr Giebelwand hinten 2 A 28C Rohrhalterung unten 28B 1 B A 4 MAN DE V2 P. Lindberg GmbH Flensburger Str. 3 Tel / D Großenwiehe kontakt@p-lindberg.de

29 29 Clips für Position 26 8 B 30 Schrauben M10x100 für Position 10 4 B Aufstellen Zum Aufstellen notwendige Werkzeuge: 1. Messband 2. Richtschnur 3. Stäbe 4. Leitern 5. Vorschlaghammer 6. Bohrer/Bohrmaschine 7. Schraubenschlüssel A: Platzierung der Stangenfüße Für ungefähre Platzierung der Stangenfüße siehe Diagramm (Abb. 2) Bei den Maßen handelt es sich um ungefähre Abmessungen. Die Gesamtmaße (915cm x 790cm) wurden außen an den Rohren gemessen. Die Stangenfüße werden genau unter der Zeltkonstruktion angebracht. Beginnen Sie in einer Ecke und montieren Sie Abschnitt für Abschnitt weiter. Vergewissern Sie sich, dass die Quermaße 12,05 Meter betragen und gleich sind. Das Maß wird in der Mitte des Rohres an einem Ende bis zur Mitte des Rohres am anderen Ende gemessen. 5 MAN DE V2 P. Lindberg GmbH Flensburger Str. 3 Tel / D Großenwiehe kontakt@p-lindberg.de

30 Montage der Stangenfüße In der Montageplatte sind 3 Löcher, 1 Loch für den Gewindeerdspieß, 2 Löcher für die geraden Erdspieße. Sehen Sie in der Abb. 3, wie die verschiedenen Spieße montiert werden müssen. Darunter sehen Sie, wie die verschiedenen Spieße in den Stangenfüßen angebracht werden müssen. (Abb. 3) Gewindespieß (Nr. 24) Gerader Erdspieß, 2 Stk. (Nr. 23) Anzeichnen der Löcher 1. Platzieren Sie den Stangenfuß am Ausgangspunkt (in einer Ecke) und machen Sie mit dem Erdspieß eine Markierung. Entfernen Sie den Stangenfuß und überprüfen Sie, ob die Markierung gut zu sehen ist. 2. Schrauben Sie den Gewindespieß mit dem Griff (Nr. 25) in die Erde. Lassen Sie einen angemessenen Teil des Spießes aus dem Erdreich herausragen. Geben Sie den Stangenfuß nun auf den Gewindespieß, montieren Sie Scheibe und Mutter lose. 3. Wenn der Rahmen fertig montiert und aufgestellt ist, werden die Muttern angezogen und die restlichen Erdspieße eingeschlagen. ACHTUNG: Der Gewindespieß und die geraden Spieße können in folgenden Situationen nicht verwendet werden: Wenn der Boden gefroren ist. Wenn der Untergrund steinig ist. Wenn der Untergrund aus Beton besteht. 6 MAN DE V2 P. Lindberg GmbH Flensburger Str. 3 Tel / D Großenwiehe kontakt@p-lindberg.de

31 B: Verbinden des Rohrgestells Montieren Sie zuerst die Bögen. Beginnen Sie mit dem Zusammenbau der Hauptbögen (Teil Nr. 1) mit den geraden Dachverlängerungen (Teil Nr. 2) und schließlich mit den senkrechten Stützen (Teil Nr. 3). Montieren Sie danach die Schrauben M10x90 (Teil Nr. 15). Bitte achten Sie darauf, dass die Köpfe der Schrauben zur Zeltplane zeigen, nicht die Muttern. Stellen Sie nun den Bogen auf und montieren Sie ihn auf einem Stangenfuß. Ist dieser an einer Seite fixiert, wird der andere Fuß angepasst. Der Bogen muss so gesichert werden, dass er nicht umfallen kann. Dann wird er auf dem Stangenfuß befestigt. Hinweis: Die Bögen sind breiter als die Platzierung der Stangenfüße. Nachdem die ersten 2 Bögen aufgestellt sind, werden die waagrechten Querstreben (Teil Nr. 4) montiert. Diese werden mit den Bolzen M12X100 (Teil Nr. 13) festgezogen. Danach kann der dritte Bogen aufgestellt und lose auf die Stangenfüße sowie anschließend auf die Querstreben montiert werden. Die nachfolgenden Bögen werden auf dieselbe Weise aufgestellt. Zum Schluss werden die Stangen an den Enden montiert. Sehen Sie in der Abb. 1 wie die Winkel (Teil Nr. 12), welche die Seitenstreben (Teil Nr. 10) mit den Giebelwänden verbinden, montiert werden. Sie sehen außerdem, wie die Giebelstreben, welche die Dachstreben (Teil Nr. 9) festhalten, mit den Schrauben M 10x30 (Teil Nr. 14) montiert werden. Bringen Sie nun die Stabilisierungsseile (Teil Nr. 26) zwischen den senkrechten Streben der Seitenwände an. Die Länge muss eingekürzt werden. 7 MAN DE V2 P. Lindberg GmbH Flensburger Str. 3 Tel / D Großenwiehe kontakt@p-lindberg.de

32 C: Zeltplane Montieren Sie die Zeltplane niemals bei starkem Wind! Eine leichte Brise ist allerdings ein Vorteil, besonders dann, wenn die Windrichtung stimmt. Es ist hilfreich, wenn man die Zeltplane so über die Bögen ziehen kann, dass der Wind unter die Zeltplane kommen kann. Markieren Sie evtl. die Mitte der Zeltplane innen, sodass die Plane genau in der Mitte der Zelthalle angebracht wird, wenn sie über die Streben gezogen wird. Bauen Sie zuerst das Rohr, das in die Zeltplane geschoben werden soll, zusammen. Siehe Abb. 5. Rollen Sie die Zeltplane vor der Zelthalle aus und richten Sie sie so, dass sie in der Breite passt. Ziehen Sie die Plane dann gerade über die Bögen. Bitte achten Sie darauf, nicht zu fest an der Plane zu ziehen, damit diese nicht kaputt wird. Es kann notwendig sein, die Zeltplane evtl. mit einem Besen oder Ähnlichem über den ersten Bogen zu heben. Wenn die Zeltplane über das Rohrgestell gezogen und ausgerichtet worden ist, werden die Rohre in die Taschen der Zeltplane gesteckt und leicht gespannt. Kontrollieren Sie nun, dass die Zeltplane an den Ecken richtig hängt. Danach können die Spannelemente (Teil Nr. 20) gerade gespannt werden. 8 MAN DE V2 P. Lindberg GmbH Flensburger Str. 3 Tel / D Großenwiehe kontakt@p-lindberg.de

33 Bitte achten Sie darauf, dass der Überhang der Zeltplane an beiden Enden gleich groß ist. Jetzt kann die Zeltplane mit dem mitgelieferten Seil und den übergeschlagenen Enden an den Bögen befestigt werden. Das Seil wird auf die passende Länge gekürzt. Es empfiehlt sich, dass das Seil von unten nach oben durch alle Löcher gezogen wird. Danach wird an beiden Enden von oben bis zum Boden straffgezogen. Nähen Sie beide Enden ein, bevor straffgezogen wird, um zu vermeiden, dass die Plane an einem Ende weggezogen wird. Schließlich wird das jeweilige Spannelement angezogen. Bogen für Bogen. 9 MAN DE V2 P. Lindberg GmbH Flensburger Str. 3 Tel / D Großenwiehe kontakt@p-lindberg.de

34 D: Giebelenden Montieren Sie die Befestigungselemente in den dazugehörigen Halterungen. Verwenden Sie die mitgelieferten Laschen für die Befestigung der Zeltplane an den Rohrstreben. Dasselbe gilt für die senkrechten Rohrstreben am Torgiebel. Befestigung der Giebelenden Die Enden werden zusammengeschnürt. Bitte achten Sie darauf, dass die Falten ordentlich und dicht am Rahmen sitzen. Die Schnurenden werden an den Clips der Stangenfüße an jedem Ende befestigt. Die Zelthalle steht. 10 MAN DE V2 P. Lindberg GmbH Flensburger Str. 3 Tel / D Großenwiehe kontakt@p-lindberg.de

35 Beispielfotos Details 4 5 Abb. 1 Seile spannen Abb. 2 Schnürverbindung am Giebelende Abb. 3 Schnürverbindung an den Seiten Abb. 4 Toröffnung ca. 3,1 X 3,6m Abb. 5 Toröffnung geschlossen Nach der Montage Die Zeltplane muss stets straff sein. Die Zeltplane kann erschlaffen und am Dach Hängematten bilden. Es wird empfohlen, nach einigen Monaten Verwendung die Plane mehrmals zu spannen. Dies ist besonders dann wichtig, wenn die Plane bei kaltem Wetter (Herbst/Winter) aufgestellt wird, da die Plane immer mehr erschlafft, je wärmer es wird. Es empfiehlt sich, das Dach vor dem Winter zu straffen. Es unterliegt der Verantwortung des Eigentümers, Schnee sofort zu entfernen, wenn er nicht von selbst nach unten rutscht. 11 MAN DE V2 P. Lindberg GmbH Flensburger Str. 3 Tel / D Großenwiehe kontakt@p-lindberg.de

36 EU-Konformitätserklärung Wir behalten uns das Recht vor, ohne vorherige Information technische Parameter oder Spezifikationen für dieses Produkt zu ändern. 12 MAN DE V2 P. Lindberg GmbH Flensburger Str. 3 Tel / D Großenwiehe kontakt@p-lindberg.de

37 GB Original User Manual Item no Tent Hall Description: Tent hall made from strong steel tubing. Used as a machine tent or storage tent. Intended use: The tent hall may only be used as described in this user manual. All other use is deemed incorrect. NB: The tent hall is not suitable for use as a party tent! Contents Specifications... 2 Safety instructions... 2 Overview drawing... 3 List of components... 4 Setting up... 5 A: Post supports positioning... 5 B: Tube frame - assembly... 7 C: Tent tarpaulin... 8 D: Gable ends... 9 Photographs for guidance After the tent hall is erected EU Declaration of Conformity MAN EN V2 P. Lindberg A/S Sdr. Ringvej 1 Tel.: Vejen, Denmark salg@p-lindberg.dk

38 Specifications Length: 9.15 m Width: 7.9 m Height: 4.20 m (Dimensions are exterior dimensions - not drawn to scale) Entrance dimension Width: 3.6 m Height: 3.05 m Safety instructions Read these safety instructions thoroughly before you start to assemble the tent hall. 1. Ensure that the area where the tent hall is to be erected is clean and tidy. 2. Do not erect the tent hall in windy weather. 3. Do not allow the tarpaulin to come too close to heaters. Do not use heaters with open flames. 4. Use only approved scaffolding or lifts when working at height. Unapproved ladders and other unstable devices may not be used due to falling hazards. 5. Exercise caution with fingers and avoid getting fingers trapped when assembling the tent hall. In general 1. Ensure that the roof of the tent hall does not have large amounts of snow lying on it. 2. Various guy ropes and rigging must be tightened regularly. 3. Bolts must be checked regularly to ensure that they are tight and pins checked regularly to ensure that they are fitted. 2 MAN EN V2 P. Lindberg A/S Sdr. Ringvej 1 Tel.: Vejen, Denmark salg@p-lindberg.dk

39 Overview drawing 3 MAN EN V2 P. Lindberg A/S Sdr. Ringvej 1 Tel.: Vejen, Denmark salg@p-lindberg.dk

40 List of components Fig. no. Item name Quantity Box 1 Ridge throw-over bow 5 B 2 Straight roof extension 6 A 2A Straight roof extension end 4 A 3 Vertical leg 10 B 4 Horizontal crossbar 28 A 5 Post support, corners 4 B 6 End post support 2 B 6A End post support 2 B 7 Side post support - middle 6 B 8 Vertical post tube tent entrance bottom 4 A 9 Vertical post tube tent entrance top 4 A 10 Support tube top of tent entrance 4 A 11 Bottom extension tube 4 A 12 Corner angle 4 B 13 Bolt M12 x 100 (for position 4) 35 B 14 Bolt M10 x 30 (for position 2A) 12 B 15 Bolt M10 x B 16 Bottom trunkline tube (tent tarpaulin), qty. 5 per set 2 sets A 17 Winch 10 B 18 Roof tarpaulin 1 A 19A End gable tarpaulin with opening 1 A 19B End gable tarpaulin - closed 1 A 20 Tensioning strap 10 A 21 Rope for lashing tent tarpaulin 1 bundle A 22 Nylon tie (400 mm) for ends Nylon tie (600 mm) for roof Ground spike 100 cm 28 B 24 Threaded spike 60 cm 10 B 25 Handle for threaded spike 1 B 26 Tensioning wire 4 A 27 Plastic plug for extension tube 4 B 28A Top tube rear gable end 2 A 28B Bottom tube rear gable end 2 A 28C Tube holder bottom 28B 1 B A 4 MAN EN V2 P. Lindberg A/S Sdr. Ringvej 1 Tel.: Vejen, Denmark salg@p-lindberg.dk

41 29 Clips for position 26 8 B 30 Bolt M10 x 100 for position 10 4 B Setting up Necessary auxiliary material for setting up: 1. Tape measure 2. Guide cord 3. Pin 4. Approved ladders 5. Sledge hammer 6. Drill 7. Spanner A: Post supports positioning See diagram for approx. positioning of post supports (Fig 2) Dimensions are approximate. Total dimension (915 x 790 cm) measured outside on the tubes. Post supports must be positioned precisely below the tent assembly. Start in one corner and continue to assemble span by span. Ensure that the diagonal dimensions are m and that they are the same. The dimension is measured between the middle of the tube on the end rafter to the middle of the tube on the end rafter. 5 MAN EN V2 P. Lindberg A/S Sdr. Ringvej 1 Tel.: Vejen, Denmark salg@p-lindberg.dk

42 Fitting the post supports There are three holes in the assembly plate, one hole for the threaded spike and two holes for the straight ground spike. See Fig 3 to see the different spikes that must be fitted. Below shows how the different spikes should be positioned in the post supports (Fig 3). Threaded spike (no. 24). Straight ground spike qty. 2 (no. 23). Marking of holes 1. Position the post support at the starting point (one corner), take the ground spike and make a mark with this. Remove the post support and check that the mark is clear. 2. Use the handle (No. 25) to screw the threaded spike into the ground. Allow a suitable part of the spike to remain above the ground. Now position the post support above the threaded spike, loosely fit the washer and nut. 3. When the frame is completely assembled and straightened, tighten the nuts and knock the remaining ground spikes in. Note: NB: The threaded spike and the straight spike cannot be used: If the ground is frozen. If the ground is rocky. If the ground is made from concrete. 6 MAN EN V2 P. Lindberg A/S Sdr. Ringvej 1 Tel.: Vejen, Denmark salg@p-lindberg.dk

43 B: Tube frame - assembly The arches are assembled first. Start with assembling the roof bent joints (part no. 1) with the straight roof extensions (part no. 2) and lastly, the vertical legs (part no. 3). Next, fit the bolts M10 x 90 (part no. 15). Make sure that the bolt heads are out against the tent tarpaulin and not the nuts. Now raise the arch up and fit it on one post support. Once it is fitted on one side, align the other leg. Secure the arch so that it cannot tip over and then securely tighten to the post support. NB: The arches will be wider than the post supports positioning. Once you have raised the first two arches, fit the horizontal crossbars (part no. 4). Securely tighten these using the M12 x 100 bolts (part no. 13). Next, raise the third arch and loosely tighten to the post supports and then fit the crossbars. The next arches are raised in the same way. Lastly, fit the braces in the ends. See Fig. 1 for how to fit the angles (part no. 12) that connect the side braces (part no. 10) with the gable ends, and the gable end braces that hold the roof braces (part no. 9) with the M10 x 30 bolts (part no. 14). Now fit the stabilising wires (part no. 26) between the sidewalls vertical posts. Adjust the lengths. 7 MAN EN V2 P. Lindberg A/S Sdr. Ringvej 1 Tel.: Vejen, Denmark salg@p-lindberg.dk

44 C: Tent tarpaulin Do not fit the tent tarpaulin in windy weather! However, a light breeze can be an advantage, especially if the wind direction is optimal. If possible, pull the tent tarpaulin up over the arches, so that the wind coming in under the tent tarpaulin will be helpful. If required, mark the middle of the roof tarpaulin on the interior side, so that the tarpaulin is positioned precisely in the middle of the tent hall when it is pulled over the rafters. Assemble the tubes that are to be pushed inside the tent tarpaulin first. See Fig 5. Roll the tent tarpaulin out in front of the tent hall and align the tarpaulin so that the width is correct. Now pull the tarpaulin straight over the arches. Ensure that the tarpaulin is not pulled too forcefully; otherwise it may tear and break. It may be necessary to lift the tent tarpaulin over the first arch, if required, use a brush or similar. Once the tent tarpaulin has been pulled over the tube frame and aligned properly, place the tubes in the pocket of the tent tarpaulin and lightly tighten. Now check that the tent tarpaulin hangs correctly in the corners. It can now be tightened (part no. 20). Make sure that the tent tarpaulin extends out by the same length at both ends. With the flaps flipped over, you can gain access to tie the tent tarpaulin securely to the arches using the supplied rope. This must be cut to suitable lengths. It is recommended that you pull the rope through all of the holes from the bottom and up to the top. Next, tighten from the top, evenly on both sides until you reach the bottom again. Lash both ends before tightening to avoid the tarpaulin being pulled off on one end. Lastly, tighten using the relevant tensioning strap. Arch for arch. 8 MAN EN V2 P. Lindberg A/S Sdr. Ringvej 1 Tel.: Vejen, Denmark salg@p-lindberg.dk

45 D: Gable ends Fit the bracket to the associated holders. Use the supplied ties to secure the tent tarpaulin to the tube braces. The same applies to the vertical tube braces in the entrance gable end. Securing of gable ends Now lash the ends together. Make sure that the folds fold nicely together and sit close to the frame. Fasten the lashing ends to the clips that sit by the post supports in each corner. The tent hall is now erected. 9 MAN EN V2 P. Lindberg A/S Sdr. Ringvej 1 Tel.: Vejen, Denmark salg@p-lindberg.dk

46 Photographs for guidance 4 5 Fig. 1 Fig. 2 Fig. 3 Fig. 4 Fig. 5 Tighten the wires Lashing in gable end Lashing in sides Entrance approx. 3.1 x 3.6 m Entrance closed After the tent hall is erected Make sure that the tent tarpaulin is kept taut. The tent tarpaulin can become slack and form hammocks on the roof. It is recommended that the tarpaulin is tightened a couple of times after a couple of months of use. This is especially important if the tent was erected in cold temperatures (autumn/winter) because the tarpaulin will become looser the warmer it becomes. It can therefore be beneficial to tighten the roof before winter. It is the responsibility of the owner to remove any snow immediately if the snow does not slide off on its own. 10 MAN EN V2 P. Lindberg A/S Sdr. Ringvej 1 Tel.: Vejen, Denmark salg@p-lindberg.dk

47 EU Declaration of Conformity We reserve the right to change the technical parameters and specifications for this product without giving advance notice. 11 MAN EN V2 P. Lindberg A/S Sdr. Ringvej 1 Tel.: Vejen, Denmark salg@p-lindberg.dk

Brugsanvisning. Telthal, 915 x 790 cm Varenr.: Sdr. Ringvej 1 I 6600 Vejen I Tlf I Fax I

Brugsanvisning. Telthal, 915 x 790 cm Varenr.: Sdr. Ringvej 1 I 6600 Vejen I Tlf I Fax I Brugsanvisning Telthal, 915 x 790 cm Varenr.: 90 35 942 Sdr. Ringvej 1 I 6600 Vejen I Tlf. 70 21 26 26 I Fax 70 21 26 30 I www.p-lindberg.dk Tillykke med dit produkt fra P. Lindberg! Inden installering

Læs mere

Original Manual 9053257 DK/N: Gårdrive til ATV S: Gårdsharv till ATV D: Rechen für ATV GB: Tine de-thatcher for ATV DK S www.p-lindberg.dk www.p-lindberg.no www.p-lindberg.se www.p-lindberg.de D GB DK

Læs mere

Original manual DK/SE/DE/EN

Original manual DK/SE/DE/EN Original manual DK/SE/DE/EN 90 36 232 Trailer www.p-lindberg.dk www.p-lindberg.no www.p-lindberg.se www.p-lindberg.de DK Original Brugsanvisning Varenr.: 9036232 Trailer med tip Sdr. Ringvej 1-6600 Vejen

Læs mere

Original Manual 9054676 DK/N: Løbegård til kalve S: Förgård till kalvar D: Auslauf für Kälber GB: Run for calves DK S www.p-lindberg.dk www.p-lindberg.no www.p-lindberg.se www.p-lindberg.de D GB DK Samlevejledning

Læs mere

Reservedelsoversigt Reservdelsöversikt Ersatzteilliste Spare parts overview

Reservedelsoversigt Reservdelsöversikt Ersatzteilliste Spare parts overview Reservedelsoversigt Reservdelsöversikt Ersatzteilliste Spare parts overview 9053582 DK: Plænelufter / vertikalskærer S: Gräsluftare / vertikalklippare D: Rasenlüfter / Vertikutierer GB: Lawn scarifier

Læs mere

FlexiManual Corner. Montagevejledning, Mounting Instructions, Montageanleitung, Tillæg til FlexiManual Manual. Supplement to FlexiManual User Manual

FlexiManual Corner. Montagevejledning, Mounting Instructions, Montageanleitung, Tillæg til FlexiManual Manual. Supplement to FlexiManual User Manual FlexiManual Corner Montagevejledning, Mounting Instructions, Montageanleitung, Tillæg til FlexiManual Manual Supplement to FlexiManual User Manual Nachtrag zum FlexiManual Benutzerhandbuch PDF 5999 / 01.07.2019

Læs mere

Læg lågen med fronten nedad på et blødt materiale for at beskytte lakken.

Læg lågen med fronten nedad på et blødt materiale for at beskytte lakken. Dansk Deutsch Francais - English Varenr. 51075 Udskiftning af pakning ved glas: Pakken indeholder: 1 stk. Pakning Vejledning: Aduro 4 Er pakningerne blevet hårde og utætte kan de skiftes på følgende måde:

Læs mere

6 x 12 M

6 x 12 M Original Manual 9033491 DK/N: Partytelt S: Partytält D: Partyzelt GB: Party Tent 6 x 12 M DK S www.p-lindberg.dk www.p-lindberg.no www.p-lindberg.se www.p-lindberg.de D GB DK Original Brugsanvisning Partytelt

Læs mere

Original manual DK/SE/DE/EN

Original manual DK/SE/DE/EN Original manual DK/SE/DE/EN 9054646 Arbejdsbord Arbetsbänk Arbeitstisch Work bench www.p-lindberg.dk www.p-lindberg.no www.p-lindberg.se www.p-lindberg.de DK Original Brugsanvisning Varenr.: 9054646 Arbejdsbord

Læs mere

DK: Transportbox til 3-punktsophæng S: Transportbox för trepunktsfäste D: Transportbox für 3-Punkt-Aufhängung GB: Transport box for 3-point hitch

DK: Transportbox til 3-punktsophæng S: Transportbox för trepunktsfäste D: Transportbox für 3-Punkt-Aufhängung GB: Transport box for 3-point hitch Original Manual 9058171 DK: Transportbox til 3-punktsophæng S: Transportbox för trepunktsfäste D: Transportbox für 3-Punkt-Aufhängung GB: Transport box for 3-point hitch DK S www.p-lindberg.dk www.p-lindberg.no

Læs mere

SAMLEVEJLEDNINGER / COLLECTION GUIDES

SAMLEVEJLEDNINGER / COLLECTION GUIDES SAMLEVEJLEDNINGER / COLLECTION GUIDES INDHOLDSFORTEGNELSE GENERELT 1 MONTERINGSHULLER 3 ANGLE BORDBEN 5 PIN BORDBEN 9 LINK U - BEN 11 CROSS BUKKE 13 INDEX GENERAL 2 MOUNTING SPOTS 4 ANGLE TABLE LEGS 6

Læs mere

Original Manual 9036662 DK: Svejsehjelm S: Svetshjälm D: Schweißhelm GB: Welding helmet DK S www.p-lindberg.dk www.p-lindberg.no www.p-lindberg.se www.p-lindberg.de D GB DK Original Brugsanvisning Varenr.:

Læs mere

Mit den Steinen vorsichtig umgehen, da vor allem die Ecken und Kanten der Specksteine sehr spröde sind.

Mit den Steinen vorsichtig umgehen, da vor allem die Ecken und Kanten der Specksteine sehr spröde sind. 15.09.2011 Montageanleitung zum Einbau der Speck und Speichersteine in Scan-line 820, 830 und 80. Heta empfiehlt, die Montage des Ofens von zwei Personen vorzunehmen. Mit den Steinen vorsichtig umgehen,

Læs mere

Power Supply 24V 2.1A

Power Supply 24V 2.1A Power Supply 24V 2.1A Strømforsyning 24 V 2,1 A Power Supply 24V 2.1A Stromversorgung 24 V 2,1 A Teknisk brugervejledning Technical User Guide Technische Bedienungsanleitung 2015.04.21 604159 Technical

Læs mere

Montage bjælkeklipper BM 5001R Art. No. 112870. Assembly scythe mower BM 5001R Art. No. 112870

Montage bjælkeklipper BM 5001R Art. No. 112870. Assembly scythe mower BM 5001R Art. No. 112870 Montage bjælkeklipper BM 5001R Art. No. 112870 Assembly scythe mower BM 5001R Art. No. 112870 Løsdele pose pakket, afdækninger, skaftkonsol, skaft højre og venstre. Lose parts plastic bag, covers, handle

Læs mere

frame bracket Ford & Dodge

frame bracket Ford & Dodge , Rev 3 02/19 frame bracket 8552005 Ford & Dodge ITEM PART # QTY DESCRIPTION 1 00083 8 NUT,.50NC HEX 2 00084 8 WASHER,.50 LOCK 3 14189-76 2 FRAME BRACKET 4 14194-76 1 411AL FRAME BRACKET PASSENGER SIDE

Læs mere

Original manual DK/SE/DE

Original manual DK/SE/DE Original manual DK/SE/DE 90 56 014 www.p-lindberg.dk www.p-lindberg.se www.p-lindberg.de Vejledning Varenr.: 9056014 Hønsenet Sdr. Ringvej 1-6600 Vejen - Tlf. 70 21 26 26 - Fax 70 21 26 30 www.p-lindberg.dk

Læs mere

highline med ramme with frame mit rahmen

highline med ramme with frame mit rahmen highline med ramme with frame mit rahmen Hvad er HighLine med ramme? HighLine med ramme er en produktserie bygget omkring det velkendte unidrain system. Udløbshuset og afløbsarmaturet er de samme produkter:

Læs mere

Original Manual & W / 50 W. DK/NO: LED gårdlamper SE: LED-gårdslampa DE: LED-Hoflampe GB: LED courtyard lamp

Original Manual & W / 50 W. DK/NO: LED gårdlamper SE: LED-gårdslampa DE: LED-Hoflampe GB: LED courtyard lamp Original Manual 90 51 573 & 90 57 506 DK/NO: LED gårdlamper SE: LED-gårdslampa DE: LED-Hoflampe GB: LED courtyard lamp 24 W / 50 W www.p-lindberg.dk www.p-lindberg.no www.p-lindberg.se www.p-lindberg.de

Læs mere

FUTURA. H x 6. Minst två personer krävs för att sätta upp det här staketet. Det skal være minst to personer ved montering av dette gjerdet.

FUTURA. H x 6. Minst två personer krävs för att sätta upp det här staketet. Det skal være minst to personer ved montering av dette gjerdet. FUTURA Der skal være min. 2 personer til opstilling af dette hegn. Minimum two people are needed to set up this fence. Es werden mindestens 2 Personen für das Aufstellen dieses Zauns benötigt. Compter

Læs mere

Original manual DK/SE/DE

Original manual DK/SE/DE Original manual DK/SE/DE 90 51 620 www.p-lindberg.dk www.p-lindberg.se www.p-lindberg.de Original brugsanvisning Varenr.: 9051620 Værkstedsbord Sdr. Ringvej 1-6600 Vejen - Tlf. 70 21 26 26 - Fax 70 21

Læs mere

SkyVision Linear Installation manual, comfort _0216, Comfort, Item no Version 02/16

SkyVision Linear Installation manual, comfort _0216, Comfort, Item no Version 02/16 SkyVision Linear Installation manual, comfort 5.6.07_06, Comfort, Item no. 0606 Version 0/6 Installation Manual VITRAL SkyVision Linear Comfort Trækarme skal altid opbevares tørt/ Wooden upstands must

Læs mere

Læs vejledningen godt igennem, før du begynder at samle vuggen. Please read the instruction carefully before you start.

Læs vejledningen godt igennem, før du begynder at samle vuggen. Please read the instruction carefully before you start. 00 Samlevejledning på Vugge ssembly instruction for the cradle Læs vejledningen godt igennem, før du begynder at samle vuggen. Please read the instruction carefully before you start. www.oliverfurniture.dk

Læs mere

DANSK INSTALLATIONSVEJLEDNING VLMT500 ADVARSEL!

DANSK INSTALLATIONSVEJLEDNING VLMT500 ADVARSEL! DANSK INSTALLATIONSVEJLEDNING VLMT500 Udpakningsinstruktioner Åben indpakningen forsigtigt og læg indholdet på et stykke pap eller en anden beskyttende overflade for at undgå beskadigelse. Kontroller at

Læs mere

SkyVision Comfort Installation manual _0517, Comfort, Item no Version 05/17

SkyVision Comfort Installation manual _0517, Comfort, Item no Version 05/17 SkyVision Comfort Installation manual 5.6.02_0517, Comfort, Item no. 2022 Version 05/17 Installation Manual VITRAL SkyVision Comfort Trækarme skal altid opbevares tørt/ Wooden upstands must always be kept

Læs mere

INSTALLATION INSTRUCTIONS STILLEN FRONT BRAKE COOLING DUCTS NISSAN 370Z P/N /308960!

INSTALLATION INSTRUCTIONS STILLEN FRONT BRAKE COOLING DUCTS NISSAN 370Z P/N /308960! Materials supplied: 1. (10) Zip Ties 2. (4) Hose Clamps 3. (2) Brake Duct Hose 4. (2) Brake Shields 5. (2) Front Brake Ducts ( Stock Fascia Only ) 6. (2) Washers 1 OD ( Stock Fascia Only ) 7. (8) Shims

Læs mere

Montage bjælkeklipper BM 870 III Art. No / BM 875 III Art. No

Montage bjælkeklipper BM 870 III Art. No / BM 875 III Art. No Montage bjælkeklipper BM 870 III Art. No. 112871 / BM 875 III Art. No. 112872 Assembly scythe mower BM 870 III Art. No. 112871 / BM 875 III Art. No. 112872 Motor og driv enhed. Engine and drive unit. Løsdele

Læs mere

Monteringsvejledning (DK) Montering af bord, armlæn til bord og legetøjsbøjle. Monteringsanvisning (SV) Montering av bord

Monteringsvejledning (DK) Montering af bord, armlæn til bord og legetøjsbøjle. Monteringsanvisning (SV) Montering av bord Monteringsvejledning (K) Montering af bord, armlæn til bord og legetøjsbøjle Monteringsanvisning (SV) Montering av bord Monteringsveiledning (N) Montering av bord, armlener til bord og leketøysbøyle Mounting

Læs mere

FlexiElectric Corner. Montagevejledning, Mounting Instructions, Montageanleitung, Tillæg til FlexiElectric Manual

FlexiElectric Corner. Montagevejledning, Mounting Instructions, Montageanleitung, Tillæg til FlexiElectric Manual FlexiElectric Corner Montagevejledning, Mounting Instructions, Montageanleitung, Tillæg til FlexiElectric Manual Supplement to FlexiElectric User Manual Nachtrag zum FlexiElectric Benutzerhandbuch PDF

Læs mere

Monteringsvejledning (DK) Borde til Panther. Monteringsanvisning (SV) Borde för Panther. Mounting instruction (GB) Trays for Panther

Monteringsvejledning (DK) Borde til Panther. Monteringsanvisning (SV) Borde för Panther. Mounting instruction (GB) Trays for Panther Monteringsvejledning (DK) Borde til Panther Monteringsanvisning (SV) Borde för Panther Mounting instruction (GB) Trays for Panther Montage-handleiding (NL) Werkblad voor de Panther rolstoel Montageanleitung

Læs mere

Podia samlevejledning

Podia samlevejledning Montering af Podia. Assembly of Podia. 1 af 12 Stykliste. Podia er bygget op omkring en Multireol (9 rums) og en Amfi trappe. Dertil består den af en bundplade, to balustre, to afskærmninger, tre madrasser

Læs mere

Fuego. Biopejs / Bio firelight / Bio Feuerstelle. Instruktion / Instructions / Instruktionen

Fuego. Biopejs / Bio firelight / Bio Feuerstelle. Instruktion / Instructions / Instruktionen Fuego Biopejs / Bio firelight / Bio Feuerstelle Instruktion / Instructions / Instruktionen Må kun fyldes hertil / Fill up to here only / Nur hier befüllen DK DK Læs hele instruktionen igennem inden brug

Læs mere

TELT. Oversigt over dele. Følg opstillingsanvisningerne for at opnå det bedste resultat.

TELT. Oversigt over dele. Følg opstillingsanvisningerne for at opnå det bedste resultat. TELT Følg opstillingsanvisningerne for at opnå det bedste resultat. Opstillingstid: ca. 25 min. Krævet antal personer til opstilling: 2 Oversigt over dele Kabine Pløkker (18 stk.) Yderdug Bæretaske Ekstra

Læs mere

Daglig huskeliste Daily checklist

Daglig huskeliste Daily checklist Daglig huskeliste Daily checklist Quick release er spændt Nakkestøtte korrekt højde Fodskåle korrekt højde Fodremme spændt Tjek jævnligt bolte og skruer for efterspænding Quick release locked Headrest

Læs mere

Daglig huskeliste Daily checklist

Daglig huskeliste Daily checklist Daglig huskeliste Daily checklist Quick release er spændt Nakkestøtte korrekt højde Selen er spændt og justeret korrekt Fodskåle korrekt højde Fodremme spændt Tjek jævnligt bolte og skruer for efterspænding

Læs mere

Manual Transmission Remove and Install (2,0 DOHC 8V Engine) ( ) Remove

Manual Transmission Remove and Install (2,0 DOHC 8V Engine) ( ) Remove Manual Transmission Remove and Install (,0 DOHC 8V Engine) (6 4 0) Workshop Equipment Transmission jack Materials Brake fluid (Super Dot 4) ESD-M6C57-A Remove. Standard preparatory measures: Make a note

Læs mere

Original manual DK/SE/DE/EN

Original manual DK/SE/DE/EN Original manual DK/SE/DE/EN 90 57 627 LED arbejdslampe LED-arbetslampa LED Arbeitsleuchte LED work light www.p-lindberg.dk www.p-lindberg.se www.p-lindberg.de DK Original Brugsanvisning Varenr.: 9057627

Læs mere

Samlevejledning til tremmeseng 70 x 140 Assembly instruction for cot 70 x 140

Samlevejledning til tremmeseng 70 x 140 Assembly instruction for cot 70 x 140 Samlevejledning til tremmeseng 70 x 140 Assembly instruction for cot 70 x 140 Læs vejledningen godt igennem før du begynder. Read the assembly instruction carefully before you start. OLIVER FURNITURE /

Læs mere

Monteringsvejledning (DK) Montering af centralbremse på Panther. Mounting instruction (GB) Mounting central braking system on the Panther

Monteringsvejledning (DK) Montering af centralbremse på Panther. Mounting instruction (GB) Mounting central braking system on the Panther Monteringsvejledning (K) Montering af centralbremse på Panther Mounting instruction (G) Mounting central braking system on the Panther Montageanleitung () Montage der Zentralbremsessystem für den Panther

Læs mere

Brugsanvisning. Installation Manual

Brugsanvisning. Installation Manual Manual size: 148 x 210 mm 175g copper paper(铜版纸印刷) UNIVERSAL BIL TAGBAGAGEBÆRER Brugsanvisning UNIVERSAL CAR ROOF RACK Installation Manual Model no. 10889 Tak fordi du valgte dette produkt, som vi håber

Læs mere

INDUSTRIA WHITE TORONTO STOCKHOLM. Montageanleitung Mounting instructions Montagevejledning

INDUSTRIA WHITE TORONTO STOCKHOLM. Montageanleitung Mounting instructions Montagevejledning INDUSTRIA WHITE TORONTO STOCKHOLM Montageanleitung Mounting instructions Montagevejledning R1 99850 / Rev. 16-04-2012 D Ergänzende Hinweise - zur Montageanleitung Vorbereitung (A) - Etagenhöhe ermitteln

Læs mere

Daglig huskeliste Daily checklist

Daglig huskeliste Daily checklist Daglig huskeliste Daily checklist Quick release er spændt Nakkestøtte korrekt højde Fodskåle korrekte højde Fodremme spændt Tjek jævnligt bolte og skruer for efterspænding Quick release locked Head rest

Læs mere

Telthal B7.90 x L9.15 x H4.2m Samlevejledning

Telthal B7.90 x L9.15 x H4.2m Samlevejledning Telthal - 9135901 B7.90 x L9.15 x H4.2m Samlevejledning Nødvendig værktøj Læs venligst vejledningen HELT før montering. Denne telthal skal være forsvarligt forankret. Læs samlevejledningen grundigt. Vær

Læs mere

- The knowledge to make a difference

- The knowledge to make a difference - The knowledge to make a difference TILLYKKE MED DIT NYE AKVARIUM Denne vejledning vil hjælpe dig let gennem opstilling og samling af dit nye MOVE akvarium. Vi anbefaler du læser vejledningen grundigt

Læs mere

Montageanvisning Assembly instructions. MultiDicer KMD 12, 18

Montageanvisning Assembly instructions. MultiDicer KMD 12, 18 Montageanvisning instructions MultiDicer KMD 12, 18 2 DK Kongskilde MultiDicer KMD 12 og KMD 18 samles som vist på efterfølgende tegninger. 1. Tegning 121117963 Kongskilde MultiDicer leveres fra fabrikken

Læs mere

Assembly Instructions. ROLZ-2 Portable AV/Conference Center

Assembly Instructions. ROLZ-2 Portable AV/Conference Center 1 Assembly Instructions ROLZ-2 Portable AV/Conference Center Rolz-2 Portable AV/Conference Center Part Drawing Description Qty Part Drawing Description Qty Hardware List A 1 ½ Flat Head Screw 2 EA P-1

Læs mere

ROTERENDE TABURET 360 GRADER MED HYL Brugsanvisning. ROTATING SHOWER STOOL WITH TRAY Installation Manual. Size: 148 x 210 mm 105g copper paper

ROTERENDE TABURET 360 GRADER MED HYL Brugsanvisning. ROTATING SHOWER STOOL WITH TRAY Installation Manual. Size: 148 x 210 mm 105g copper paper Size: 148 x 210 mm 105g copper paper ROTERENDE TABURET 360 GRADER MED HYL Brugsanvisning ROTATING SHOWER STOOL WITH TRAY Installation Manual Model. 10853 1. Fjern emballagen. 2. Taburettens ben samles

Læs mere

Sikkerhedsvejledning

Sikkerhedsvejledning 11-01-2018 2 Sikkerhedsvejledning VIGTIGT! Venligst læs disse instruktioner inden sengen samles og tages i brug Tjek at alle dele og komponenter er til stede som angivet i vejledningen Fjern alle beslagsdele

Læs mere

Original Manual 90 50 860 DK: Fugleskræmmer S: Fågelskrämmare D: Vogelscheuche GB: Bird scarer 7 M DK S www.p-lindberg.dk www.p-lindberg.no www.p-lindberg.se www.p-lindberg.de D GB DK Original Brugermanual

Læs mere

Monteringsvejledning / Mounting instructions. Chameleon betræk / Chameleon cover system

Monteringsvejledning / Mounting instructions. Chameleon betræk / Chameleon cover system Monteringsvejledning / Mounting instructions Chameleon betræk / Chameleon cover system Monteringsvejledning / Mounting instructions Bred presenningsbunden ud på gulvet. 1. Place the bottom of the tarpaulin

Læs mere

The art of heating. Hudevad Plan XV. Installation guide Monteringsvejledning Montageanleitung. EN ini.3s /0

The art of heating. Hudevad Plan XV. Installation guide Monteringsvejledning Montageanleitung. EN ini.3s /0 The art of heating Hudevad Plan XV Installation guide Monteringsvejledning Montageanleitung 1 Languages Sprog Sprache EN... 4 DK... 6 DE... 8 Tools Værktøj Werkzeug Tools needed for installation Nødvendigt

Læs mere

Montering af læsseudstyr Mounting of Loading Equipment. SupraVac 2000

Montering af læsseudstyr Mounting of Loading Equipment. SupraVac 2000 Montering af læsseudstyr Mounting of Loading Equipment SupraVac 2000 DK Montering af læsseudstyr på SupraVac 2000 Det er vigtigt, at læsseudstyret monteres og justeres som angivet nedenfor. Forkert justering

Læs mere

Murstenssyning. Sådan syr du basisrækkerne: Ind og udtagninger:

Murstenssyning. Sådan syr du basisrækkerne: Ind og udtagninger: Sådan syr du basisrækkerne: Murstenssyning. Sy først trin 1, derefter sy trin 2, Giv ikke slip på perlerne før du har fået startet rigtigt, ellers kan de sno sig, og så må du starte forfra igen. Gentag

Læs mere

Bjælkesko Type U. Beam shoes Type U. Balkenschuhe Typ U DK UK D

Bjælkesko Type U. Beam shoes Type U. Balkenschuhe Typ U DK UK D DK UK D Anvendelse: Bjælkesko anvendes til samling af bjælker og bjælkelag i samme plan, såvel træ mod træ, som træ mod beton eller murværk. Beslagene: Er udført i 2 mm varmforzinket stålplade og forsynet

Læs mere

Original Manual 9058517 DK: Arbejdslygte S: Arbetslampa D: Arbeitsleuchte GB: Work lamp LED DK S www.p-lindberg.dk www.p-lindberg.no www.p-lindberg.se www.p-lindberg.de D GB DK Original Brugsanvisning

Læs mere

Original Manual 9027285 DK/N: Palleløfter, terrængående S: Palldragare, terrängående D: Palettenheber, geländegängig GB: Pallet Lifter, rough terrain DK S www.p-lindberg.dk www.p-lindberg.no www.p-lindberg.se

Læs mere

Monteringsvejledning (DK) Montering af fixlock beslag. Monteringsanvisning (N) Montering av fixlock beslag

Monteringsvejledning (DK) Montering af fixlock beslag. Monteringsanvisning (N) Montering av fixlock beslag Monteringsvejledning (K) Montering af fixlock beslag Monteringsanvisning (N) Montering av fixlock beslag Monteringsanvisning (SV) Montering av fixlock Mounting instruction (G) Mounting the fixlock fittings

Læs mere

16748-1. A x 1 B x 2. C1 x 1 C3 x 1. E1 x 2. E2 x 4. D1 x 1. D2 x 1 F x 1 H2 X 90 II X 4 I2 X 12. H1 X 8 50 x 50. G x 14. C2 x 1.

16748-1. A x 1 B x 2. C1 x 1 C3 x 1. E1 x 2. E2 x 4. D1 x 1. D2 x 1 F x 1 H2 X 90 II X 4 I2 X 12. H1 X 8 50 x 50. G x 14. C2 x 1. 16748-1 AKKU xxv A x 1 B x 2 C2 x 1 C1 x 1 C3 x 1 E1 x 2 D1 x 1 E2 x 4 D2 x 1 F x 1 Senest revideret: Letzte Änderung: 10-2014 G x 14 Ø4 x 80 X 8 50 x 50 H2 X 90 II X 4 I2 X 12 Ø4 x 40 Ø125 Ø8 x 80 Læs

Læs mere

Assembly Guide Monteringsvejledning. 60/30 - wood end panels

Assembly Guide Monteringsvejledning. 60/30 - wood end panels Assembly Guide Monteringsvejledning 60/30 - wood end panels Wood end panels 1. When installing wood end panels, insert the top fittings into the upper crossbar slots and place the Z brackets over the foot

Læs mere

Oblique solutions, corner solutions and backing

Oblique solutions, corner solutions and backing DK Monteringsvejledning Skråløsninger, hjørneløsninger og bagklædning Denne vejledning anvendes sammen med monteringsvejledning til standardskabe Vores skydedørsgarderober er individuelle løsninger tilpasset

Læs mere

DANSK / ENGLISH DS PRO PROJEKTORBESLAG 180 CM MANUAL DS PRO PROJECTOR BRACKET 180 CM OWNERS MANUAL

DANSK / ENGLISH DS PRO PROJEKTORBESLAG 180 CM MANUAL DS PRO PROJECTOR BRACKET 180 CM OWNERS MANUAL DANSK / ENGLISH DANSK SIDE 1 DS Pro PRO projektorbeslag PROJEKTORBESLAG 180 cm 180 CM Tillykke med dit nye DS Pro projektorbeslag 180 cm. For at opnå det bedste resultat bedes du læse denne manual og udelukkende

Læs mere

DK: Foderhæk, 12 pladser S: Foderhäck, 12 ätplatser D: Futterraufe, 12 Plätze GB: Hay rack, 12 feeding places 200 x 200 cm

DK: Foderhæk, 12 pladser S: Foderhäck, 12 ätplatser D: Futterraufe, 12 Plätze GB: Hay rack, 12 feeding places 200 x 200 cm Original Manual 9041213 DK: Foderhæk, 12 pladser S: Foderhäck, 12 ätplatser D: Futterraufe, 12 Plätze GB: Hay rack, 12 feeding places 200 x 200 cm DK S www.p-lindberg.dk www.p-lindberg.no www.p-lindberg.se

Læs mere

Monteringsvejledning (DK) Montering af armlæn, gribebøjle og legetøjsbøjle. Monteringsveiledning (N) Montering av armlener, gripebøyle og lekebøyle

Monteringsvejledning (DK) Montering af armlæn, gribebøjle og legetøjsbøjle. Monteringsveiledning (N) Montering av armlener, gripebøyle og lekebøyle Monteringsvejledning (K) Montering af armlæn, gribebøjle og legetøjsbøjle Monteringsveiledning (N) Montering av armlener, gripebøyle og lekebøyle Monteringsanvisning (SV) Montering av armstöd, griphandtag

Læs mere

Original manual DK/SE/DE/EN

Original manual DK/SE/DE/EN Original manual DK/SE/DE/EN 9040020 Hundegård/brændely (DK) Hundgård/vedförråd (SE) Hundeauslauf/Brennholzablage (DE) Outdoor kennel (EN) www.p-lindberg.dk www.p-lindberg.no www.p-lindberg.se www.p-lindberg.de

Læs mere

Vejledning 1. Afmonter lågen a. Bauartfjederen afmonteres ved hjælp af en tang eller en skruetrækker ved enten at vride eller skubbe fjederen ud.

Vejledning 1. Afmonter lågen a. Bauartfjederen afmonteres ved hjælp af en tang eller en skruetrækker ved enten at vride eller skubbe fjederen ud. Dansk Deutsch Francais - English Varenr. 51096 Udskiftning af sekskantet håndtagsstang: Nedenfor er beskrevet hvorledes håndtagsstangen på din Aduro 7 udskiftes. Arbejdshandsker kan med fordel anvendes.

Læs mere

frame bracket Dodge Ram x2 & 4x4 (Includes Mega Cab) (6-1/2 & 8 Boxes)

frame bracket Dodge Ram x2 & 4x4 (Includes Mega Cab) (6-1/2 & 8 Boxes) , Rev 4 03/19 frame bracket 8551006 Dodge Ram 3500 4x2 & 4x4 (Includes Mega Cab) (6-1/2 & 8 Boxes) ITEM PART # QTY DESCRIPTION 1 00248 4 WASHER,.625 SPRING LOCK 2 00291 4 NUT,.625NC HEX 3 00477 4 WASHER,.625

Læs mere

Adapterramme for Puslebord Maxi 2. Brugermanual Montagevejledning. Denne manual skal altid ledsage produktet

Adapterramme for Puslebord Maxi 2. Brugermanual Montagevejledning. Denne manual skal altid ledsage produktet Adapterramme for Puslebord Maxi 2 Brugermanual Montagevejledning Denne manual skal altid ledsage produktet PDF 6106 / 19.12.2013 Indholdsfortegnelse Generelle oplysninger... 3 Montagevejledning... 5 Servicering...

Læs mere

MAKING MODERN LIVING POSSIBLE. Danfoss Air PC Tool. Installation guide. Danfoss Heating Solutions

MAKING MODERN LIVING POSSIBLE. Danfoss Air PC Tool. Installation guide. Danfoss Heating Solutions MAKING MODERN LIVING POSSIBLE Danfoss Air Tool Installation guide Danfoss Heating Solutions 1. How to connect your to the Installer: Connection by USB cable (standard mini USB cable) USB cable End user:

Læs mere

DK/N: Læskur til dyrehold S: Vindskydd för djur D: Unterstand für Tiere GB: Livestock Tent 6 x 6 x 3,7 m

DK/N: Læskur til dyrehold S: Vindskydd för djur D: Unterstand für Tiere GB: Livestock Tent 6 x 6 x 3,7 m Original Manual 9055914 DK/N: Læskur til dyrehold S: Vindskydd för djur D: Unterstand für Tiere GB: Livestock Tent 6 x 6 x 3,7 m DK S www.p-lindberg.dk www.p-lindberg.no www.p-lindberg.se www.p-lindberg.de

Læs mere

DK/N: Regnvandsbeholder, foldbar S: Regnvattenbehållare, hopfällbara D: Regentonnen, zusammenklappbar GB: Rainwater Tank, collapsible 250 & 750 L

DK/N: Regnvandsbeholder, foldbar S: Regnvattenbehållare, hopfällbara D: Regentonnen, zusammenklappbar GB: Rainwater Tank, collapsible 250 & 750 L Original Manual 9059916 & 9059917 DK/N: Regnvandsbeholder, foldbar S: Regnvattenbehållare, hopfällbara D: Regentonnen, zusammenklappbar GB: Rainwater Tank, collapsible 250 & 750 L DK S www.p-lindberg.dk

Læs mere

Original Manual 9043628 & 9043629 DK/N: Plænesweeper S: Uppsamlare D: Rasenkehrmaschine GB: Lawn Sweeper DK S www.p-lindberg.dk www.p-lindberg.no www.p-lindberg.se www.p-lindberg.de D GB DK Original Brugsanvisning

Læs mere

Project Step 7. Behavioral modeling of a dual ported register set. 1/8/ L11 Project Step 5 Copyright Joanne DeGroat, ECE, OSU 1

Project Step 7. Behavioral modeling of a dual ported register set. 1/8/ L11 Project Step 5 Copyright Joanne DeGroat, ECE, OSU 1 Project Step 7 Behavioral modeling of a dual ported register set. Copyright 2006 - Joanne DeGroat, ECE, OSU 1 The register set Register set specifications 16 dual ported registers each with 16- bit words

Læs mere

DK/N: Garagetelt S: Garage tält D: Garage Zelt GB: Portable garage 3,66 x 8 x 2,72 M

DK/N: Garagetelt S: Garage tält D: Garage Zelt GB: Portable garage 3,66 x 8 x 2,72 M Original Manual 9059597 DK/N: Garagetelt S: Garage tält D: Garage Zelt GB: Portable garage 3,66 x 8 x 2,72 M DK S www.p-lindberg.dk www.p-lindberg.no www.p-lindberg.se www.p-lindberg.de D GB DK Original

Læs mere

Vores mange brugere på musskema.dk er rigtig gode til at komme med kvalificerede ønsker og behov.

Vores mange brugere på musskema.dk er rigtig gode til at komme med kvalificerede ønsker og behov. På dansk/in Danish: Aarhus d. 10. januar 2013/ the 10 th of January 2013 Kære alle Chefer i MUS-regi! Vores mange brugere på musskema.dk er rigtig gode til at komme med kvalificerede ønsker og behov. Og

Læs mere

DK/N: Læskur til dyrehold S: Vindskydd för djur D: Unterstand für Tiere GB: Livestock Tent 6 x 6 x 3,7 m

DK/N: Læskur til dyrehold S: Vindskydd för djur D: Unterstand für Tiere GB: Livestock Tent 6 x 6 x 3,7 m Original Manual 9053672 DK/N: Læskur til dyrehold S: Vindskydd för djur D: Unterstand für Tiere GB: Livestock Tent 6 x 6 x 3,7 m DK S www.p-lindberg.dk www.p-lindberg.no www.p-lindberg.se www.p-lindberg.de

Læs mere

DK/N: Læskur til dyrehold S: Vindskydd för djur D: Unterstand für Tiere GB: Livestock Tent 6 x 6 x 3,7 m

DK/N: Læskur til dyrehold S: Vindskydd för djur D: Unterstand für Tiere GB: Livestock Tent 6 x 6 x 3,7 m Original Manual 9053672 DK/N: Læskur til dyrehold S: Vindskydd för djur D: Unterstand für Tiere GB: Livestock Tent 6 x 6 x 3,7 m DK S www.p-lindberg.dk www.p-lindberg.no www.p-lindberg.se www.p-lindberg.de

Læs mere

Bestplay fodboldmål 300x200 cm

Bestplay fodboldmål 300x200 cm Bestplay fodboldmål 300x200 cm ADVARSEL! Hvis du ikke følger alle instruktioner præcist, kan det medføre alvorlig personskade. Sikkerhedsadvarsel Læs alle instrukser og færdiggør samlingen før brug. Det

Læs mere

Monteringsvejledning (DK) Montering af Manatee på stel. Monteringsanvisning (SV) Montering av Manatee på ram

Monteringsvejledning (DK) Montering af Manatee på stel. Monteringsanvisning (SV) Montering av Manatee på ram Monteringsvejledning (K) Montering af Manatee på stel Monteringsanvisning (SV) Montering av Manatee på ram Monteringsvejledning (N) Montering av Manatee på understell Mounting instruction () Mounting Manatee

Læs mere

100W / 200W

100W / 200W Original Manual 9052979 & 9052980 DK/N: LED-lampe S: LED-lampa D: LED-Lampe GB: LED Lamp 100W / 200W DK S www.p-lindberg.dk www.p-lindberg.no www.p-lindberg.se www.p-lindberg.de D GB DK Original Brugsanvisning

Læs mere

F1 PALLEREOL MONTERINGSVEJLEDNING

F1 PALLEREOL MONTERINGSVEJLEDNING F1 PALLEREOL MONTERINGSVEJLEDNING (GB) INSTALLATION INSTRUCTIONS (D) MONTAGEANLEITUNG 2 1 Placer første stige op ad en væg. Place the first upright up against the wall. Setzen Sie den ersten Leiter gegen

Læs mere

GOKART. Brugsanvisning Bruksanvisning. Importeret af Harald Nyborg A/S. Model: CT008 Best.nr. 8197

GOKART. Brugsanvisning Bruksanvisning. Importeret af Harald Nyborg A/S. Model: CT008 Best.nr. 8197 GOKART Importeret af Harald Nyborg A/S Brugsanvisning Bruksanvisning Model: CT008 Best.nr. 8197 Tillykke med deres nye gokart! De bedes læse denne brugsanvisning grundigt, før De samler gokarten eller

Læs mere

Advarsel: Læs alle instrukser og færdiggør samlingen før brug. Det kan være en fordel at være to til at samle trampolinen.

Advarsel: Læs alle instrukser og færdiggør samlingen før brug. Det kan være en fordel at være to til at samle trampolinen. InGround trampolin Advarsel: - Indeholder små dele som kan forårsage kvælning. - Trampolinen må ikke bruges af børn under 3 år. - For at undgå at glide, bør trampolinen ikke bruges når den er våd. - Kun

Læs mere

Lobby - KYV Montagevejledning / Installation instructions Montageanleitung / Monteringsanvisning

Lobby - KYV Montagevejledning / Installation instructions Montageanleitung / Monteringsanvisning furniture Lobby - KYV Montagevejledning / Installation instructions Montageanleitung / Monteringsanvisning Products by VEKSØ 3000 Extension 3290 Start Opbygning og partlist / Drawing and parts list Aufbau

Læs mere

Original manual DK/SE/DE/EN

Original manual DK/SE/DE/EN Original manual DK/SE/DE/EN 9058174 SS-404 www.p-lindberg.dk www.p-lindberg.no www.p-lindberg.se www.p-lindberg.de DK Original Brugsanvisning Varenr.: 9058174 Læskur t. dyrehold 4x4x3,15 meter Sdr. Ringvej

Læs mere

9933 9933 UK: Comply with the European safety standard EN 747:2007 part 1 and part 2. Be aware of the danger of young children (under the age of 6), falling from upper bed. This bed has not been

Læs mere

DET KONGELIGE BIBLIOTEK NATIONALBIBLIOTEK OG KØBENHAVNS UNIVERSITETS- BIBLIOTEK. Index

DET KONGELIGE BIBLIOTEK NATIONALBIBLIOTEK OG KØBENHAVNS UNIVERSITETS- BIBLIOTEK. Index DET KONGELIGE Index Download driver... 2 Find the Windows 7 version.... 2 Download the Windows Vista driver.... 4 Extract driver... 5 Windows Vista installation of a printer.... 7 Side 1 af 12 DET KONGELIGE

Læs mere

LGVT Lesegeschwindigkeits und -verständnistest 10.Klasse

LGVT Lesegeschwindigkeits und -verständnistest 10.Klasse LGVT Lesegeschwindigkeits und -verständnistest 10.Klasse Der LGVT dient der Ermittlung des Leseverständnisses und der Lesegeschwindigkeit. Die Schüler lesen nach Bearbeiten des Übungsbeispiels einen Fließtext

Læs mere

Telthal Samlevejledning

Telthal Samlevejledning Telthal - 9135900 B4.3xL9.2xH4.3m Samlevejledning Nødvendigt værktøj Læs HELE denne samlevejledning grundigt før samlingen påbegyndes. Denne telthal SKAL være forsvarligt forankret. OBS Teltdugen skal

Læs mere

Original manual DK/SE/DE/EN

Original manual DK/SE/DE/EN Original manual DK/SE/DE/EN 90 52 979 & 90 52 980 LED 100 W / 200 W www.p-lindberg.dk www.p-lindberg.se www.p-lindberg.de Original brugsanvisning Varenr.: 9052979 & 9052980 LED-lampe 100 W eller 200 W

Læs mere

Loire straight 140,

Loire straight 140, Loire straight 140, 40-40130-9 Montageanvisning Mounting instruction Montageanleitung PDF 6048 / 01.01.2011 DS 3028 Alle mål i mm All measurements in mm Alle Abmessungen in mm * I henhold til DS 3028 **

Læs mere

RPW This app is optimized for: For a full list of compatible phones please visit radiation. result.

RPW This app is optimized for: For a full list of compatible phones please visit   radiation. result. TM TM RPW-1000 Laser Distance Measurer This app is optimized for: For a full list of compatible phones please visit www.ryobitools.eu/phoneworks IMPORTANT SAFETY S READ AND UNDERSTAND ALL INSTRUCTIONS.

Læs mere

DANSK INSTALLATIONSVEJLEDNING VLMW2355A ADVARSEL! VESA Standarder: 100x100, 200x100, 200x200, Op til 35 kg. 300x300, 400x200 og 400x400

DANSK INSTALLATIONSVEJLEDNING VLMW2355A ADVARSEL! VESA Standarder: 100x100, 200x100, 200x200, Op til 35 kg. 300x300, 400x200 og 400x400 DANSK INSTALLATIONSEJLEDNING LMW2355A ESA Standarder: ægt: 100x100, 200x100, 200x200, Op til 35 kg. 300x300, 400x200 og 400x400 Udpakningsinstruktioner Åben indpakningen forsigtigt og læg indholdet på

Læs mere

LUL s Flower Power Vest dansk version

LUL s Flower Power Vest dansk version LUL s Flower Power Vest dansk version Brug restgarn i bomuld, bomuld/acryl, uld etc. 170-220 m/50 g One size. Passer str S-M. Brug større hæklenål hvis der ønskes en større størrelse. Hæklenål 3½ mm. 12

Læs mere

FUTURA. ca. 200 cm. A x 6. B x 9 (B x 11) (B x 13)

FUTURA. ca. 200 cm. A x 6. B x 9 (B x 11) (B x 13) FUTURA Der skal være min. 2 personer til opstilling af dette hegn. Minimum two people are needed to set up this fence. Es werden mindestens 2 Personen für das Aufstellen dieses Zauns benötigt. Compter

Læs mere

O. Sternal, V. Hankele. 4. Magnetismus

O. Sternal, V. Hankele. 4. Magnetismus 4. Magnetismus 4. Magnetismus 4.1 Magnete und Magnetfelder Magnetfelder N S Rotationsachse Eigenschaften von Magneten und Magnetfeldern Ein Magnet hat Nord- und Südpol Ungleichnamige Pole ziehen sich an,

Læs mere

Original Manual & W / 200 W. DK/N: UFO lamper - LED S: UFO-lampor - LED D: UFO-Lampe - LED GB: UFO lamps - LED

Original Manual & W / 200 W. DK/N: UFO lamper - LED S: UFO-lampor - LED D: UFO-Lampe - LED GB: UFO lamps - LED Original Manual 90 54 420 & 90 54 421 DK/N: UFO lamper - LED S: UFO-lampor - LED D: UFO-Lampe - LED GB: UFO lamps - LED 100 W / 200 W www.p-lindberg.dk www.p-lindberg.no www.p-lindberg.se www.p-lindberg.de

Læs mere

Klipning af plæne De bedste klipperesultater får du ved at overlappe på den afklippede bane.

Klipning af plæne De bedste klipperesultater får du ved at overlappe på den afklippede bane. Cylinderplæneklipper SELEKTA 38 brugervejledning Læs denne manual omhyggelig før brug. Følg sikkerhedsinstruktionerne. Opbevar denne manual til senere brug/reference. Sikkerhed - Pas på klipperens skarpe

Læs mere

DAY HUNTER KIT ASSEMBLY INSTRUCTIONS

DAY HUNTER KIT ASSEMBLY INSTRUCTIONS DAY HUNTER KIT ASSEMBLY INSTRUCTIONS Attach the Shoulder Harness to the Frame 1. Pass the Upper Harness Attachment Straps (Diagram 1.) through the attachment points located inboard on the upper portion

Læs mere

DIVAR VIGTIGT! / IMPORTANT! MÅL / DIMENSIONS. The DIVAR wall lamp comes standard. with 2.4 m braided cord and a plug in power supply (EU or UK).

DIVAR VIGTIGT! / IMPORTANT! MÅL / DIMENSIONS. The DIVAR wall lamp comes standard. with 2.4 m braided cord and a plug in power supply (EU or UK). DIVAR VIGTIGT! / IMPORTANT! VIGTIGT læs vores anvisninger før du bruger produktet. Har du problemer med den elektriske installation, skal du kontakte en elektriker. Sørg for at altid slukke for strømmen

Læs mere

DEUTSCH. Electric

DEUTSCH. Electric DEUTSCH D Electric 8-00-0 S SVENSKA 5 8 6 9 5 5.. SVENSKA S = 0 mm = 0 mm = 0 mm = 50 mm 0 mm 60 mm A C B.. 5.. 6. S SVENSKA 8. 9. INFORMATION OM STRØMFORBRUG Flere og flere maskiner, som f.eks. plæneklippere,

Læs mere