MS-H280-Pro Magnetic Stirrer www..com Copyright: No part of this manual may be reproduced or transmitted without prior written permission of. VERSION201407
CONTENTS Chapter 1: Working Principle... 3 1 Introduction... 3 Chapter 2: Removal and Installation of Instrument... 5 2.1 Removal... 5 2.2 Circuit Connections... 6 2.3 Replace the heater... 6 2.4 Replacement of Photoelectric switch... 7 2.5 Replacement of main board and motor module... 8 2.6 Replacement of the control board... 8 Chapter 3: Trouble shooting... 9 1.No operation response... 9 2. Instrument not heating... 10 3. Instrument not stirring... 10 2
Chapter 1: Working Principle 1 Introduction Support Holder PT1000 Temperature Control Knob Power Switch Fig.2 LED Display Speed Control Knob Fig.1 PT1000 Interface Fig.3 Power Socket You can mix sample in stir bar. When, hotplate can hea to 280. Fig. 1-3 is the diagram of MS-H280-Pro Digital Hotplate Magnetic Stirrer. The LCD display, temperature control knob and speed control knob on instrument control panel; power switch on the side of instrument; PT1000 interface and power socket on the rear of the instrument. After connect the power cord and turn on power switch, users are able to set experimental conditions on the control panel temperature control knob and speed control knob, and the setting values and actual values are displa on LCD screen in real-time. Temperature sensor support holder ( No. 18900017) and the external temperature sensor ( No. 18900016) are optional which can be used to monitor and control the sample temperature in vessel. Power supply: AC220V (or AC110V) Power socket Motor Board transformer (to DC12V) power supply relay for system control power supply control of Work Plate 3
Stirring: motor drives the magnet rotate synchronously when turn the motor on, which forms a varying magnetic field; the varying magnetic field drives stir bar to rotate synchronously with motor. Speed feedback: The motor speed can be accurately measured by the shaft encoder fixed on the motor along with photoelectric switch. Heating: There are two built-in temperature sensors (thermistors) connected to Master Control Board. is for temperature control and the other is for temperature protection. LCD display: aster Control Board is connected to Motor Board and displays user s settings and current operating information. External temperature sensor & support holder: Sensor support holder is installed in mounting hole and external temperature sensor is the sensor support holder. PT1000 into the interface at the rear of instrument to monitor the temperature of target sample. 4
Chapter 2: Removal and Installation of Instrument failure occurs, first, you should conduct a failure analysis; if the failure is caused by the damage of instrument hardware, the related component must be repaired or replaced. Here are the relevant contents of the replacement and disassembly of instrument. 2.1 Removal Tool Cross screwdriver Step1 Turn the instrument upside down, remove the screws the red circle; Step 2 Open the bottom cover remove the screw at the red circle. Step 3: P main board nplug the connector in circle remove the main board. 5
2.2 Circuit Connections When, please carefully check the cable connected correctly.please note that A has positive and negative 2.3 Replac emove the screws(4pcs) remove the parts in order. 6
The yellow ground line installed as shown below. 2.4 Replacement of Photoelectric switch Unplug the cable marked with red circles, as shown in figure. Remove the screws (marked with yellow circle. When you replace a new photoelectric switch, the shaft encoder on the motor must match with photoelectric switch. When motor is turning, shaft encoder contact with photoelectric switch. You can try to fine tune shaft encoder position and then screw. After having plugged photoelectric cable, adjust the cable position so that moving parts. 7
2.5 Replacement of main board and motor module nplug the connector in the white circle remove the screws in the red circle, moto from main board; main board or motor. 2.6 Replacement of the control board Remove the screws the picture shown in the red circle and gaskets. Replace the control board. 8
Chapter 3: Trouble shooting 1.No operation response fault phenomenon check step Y-next step, N-the response 1.Check and make sure the power cord is firmly plugged; response plug again 3.check and make sure the switch is put on on the switch 4.cheak if the fuse is blown fuse No operation response (LCD off) 5. Che if tthe flat cable is connecteed re 6.Check if these connector are connected re 7.Check if the voltage in the red circle is 5VAC. main board 8.Check if the voltage the point in the red circle to GND is +5V or -5V. main board 9
2. Instrument does not heat fault phenomenon check step Y-next step, N-the response 1.make sure that you have rotated the left knob to set a target temperature, and the heat indicator is on.(y/n) response setting Instrument does not heating 2.Check if the voltage in the red circle is 5VAC. (Y/N) 3.Check if the voltage the point in the red circle to GND is +5V or -5V. (Y/N) main board main board 4.Check if the resistance of the two point in the red circle is about 130 (Y/N) component 3. Instrument does not stir fault phenomenon Instrument does not stir check step Y-next step, N-the response 1.Make sure that you have rotated the right knob to set a target speed, and the stirrer speed indicator is on. 2.Check if the voltage in the red circle is 5VAC. response speed main board 10
fault phenomenon check step Y-next step, N-the response response Instrument does not stir or speed doesn t control Check if the speed sensor lose its position or the connector is loose Adjust it or speed sensor 11