1 Dato 20. januar 2016 Sagsbehandler Stine Kirkeskov Mail Telefon Dokument 15/ Side 1/20 To the Bidders RETTELSESBLAD / SUPPLERENDE MEDDELELSER NR. 3 CORRECTION SHEET/ SUPPLEMENTARY NOTICE NO. 3 Fjordforbindelsen Frederikssund, Dual carriageway Marbækvej - Skibbyvej, inclusive of a High Bridge Udbud Vej- og broarbejder This correction sheet sets out the corrections and additions to all the tender material as defined in the Document List (Contractual documents, Tender documents and Information Room documents). Queries from bidders with the associated answers are attached as an appendix. Corrections are shown in bold italics and highlighted in grey. Corrections and additions: Bidders are hereby notified of the following corrections and additions to the tender documents for the above-mentioned contract: Vejdirektoratet Guldalderen Hedehusene Telefon vd@vd.dk vejdirektoratet.dk SE EAN
2 Særlige betingelser (SB) / Special Conditions to Contract: Rettelse af SB, Ad 2, stk. 3, 2. Deltidsfrister, Deltidsfrist 2a.: For at sikre arbejdets fremdrift under hensyntagen projektets kompleksitet og tidsplan, skal entreprenøren senest 8 måneder fra kontraktunderskrivelse have fremsendt, hvad der svarer til bygherrens beskrevne designpakker i SWS Design, Appendix 5 for hhv. fundamenter, piller og spunsvæggene, til bygherrens accept. Erstattes af: For at sikre arbejdets fremdrift under hensyntagen til projektets kompleksitet og tidsplan, skal entreprenøren senest 8 måneder fra kontraktunderskrivelse have fremsendt, hvad der svarer til bygherrens beskrevne designpakker i Kvalitets- og Miljøledelseskrav til totalentrepriser, bilag til SAB Styring og Samarbejde, afsnit 3.2 for hhv. fundamenter, piller og spunsvæggene, til bygherrens accept. Service translation - Særlige betingelser (SB) (Ruling language of the SB is Danish) Correction of SB, Re 2(3), 2. Interim deadlines, Interim deadline 2a: In order to ensure the progress of the work with due consideration of the complexity of the project and the time schedule, the contractor shall submit for the employer's approval, not later than 8 months from signature of the contract, what corresponds to the design packages described by the employer in SWS Management and Cooperation ("SAB Styring og Samarbejde") for, respectively, foundations, pillars and sheet piling. Is replaced with: In order to ensure the progress of the work with due consideration of the complexity of the project and the time schedule, the contractor shall submit for the employer's approval, not later than 8 months from signature of the contract, what corresponds to the design packages described by the employer in Quality and environment management requirements for turnkey contracts, appendix to SWS Management and Cooperation ( Kvalitets- og Miljøledelseskrav til totalentrepriser, bilag til SAB Styring og Samarbejde"), Section 3.2 for, respectively, foundations, pillars and sheet piling. Særlig arbejdsbeskrivelse/special Work Specification (SAB/SWS): Rettelse til SAB 03 Arbejdsplads, afsnit 1.5 (Forudgående, igangværende og kommende enterpriser): 2
3 1.5 Forudgående, igangværende og kommende entrepriser Entreprenøren skal være opmærksom på følgende entrepriser, der enten går forud for, finder sted samtidig med eller efter arbejdet: Fjordforbindelsen Frederikssund Motortrafikvejen Frederikssundsvej Marbækvej Beskrivelse af arbejdet - Etablering af midlertidige tilkørselsramper fra Frederikssundsvej og etablering af vejen mellem stationering og Start-/slutdato - marts 2016/ november Fjordforbindelsen Frederikssund Underføring og rundkørsler ved Frederikssundsvej Beskrivelse af arbejdet - Etablering af midlertidige tilkørselsramper fra Frederikssundsvej, og etablering af vejen mellem stationering og Start-/slutdato / Fjordforbindelsen Frederikssund Kompensationsbiotoper Beskrivelse af arbejdet Etablering og oprensning af vandhuller som led i de kompenserende tiltag i projektet. Start-/slutdato - efterår 2015/ efterår Fjordforbindelsen Frederikssund Faste tavler, herunder vejvisningstavler Beskrivelse af arbejdet - Etablering af skiltning for projektet. Start-/slutdato - efterår 2016 / vinter Fjordforbindelsen Frederikssund Beplantning Beskrivelse af arbejdet Beplantningsentreprisen for projektet Start-/slutdato 2019/ Fjordforbindelsen Frederikssund Trafikledelsessystemer, herunder variable tavler Beskrivelse af arbejdet Etablering af ITS-systemer for projektet. Start-/slutdato 2018/ Fjordforbindelsen Frederikssund Nedrivning af eksisterende bygninger Beskrivelse af arbejdet Nedrivning af eksisterende bygninger. Bygherre - Vejdirektoratet Start-/slutdato marts 2016/ december ETAB Fjordforbindelsen Frederikssund Betalingsanlæg Beskrivelse af arbejdet Etablering og idriftsættelse af betalingsinfrastruktur og -systemer for projektet. SWS MR 3
4 Start-/slutdato 2018 / 2019 Erstattes af: 1.5 Forudgående, igangværende og kommende entrepriser Entreprenøren skal være opmærksom på følgende entrepriser, der enten går forud for, finder sted samtidig med eller efter arbejdet: Fjordforbindelsen Frederikssund Motortrafikvejen Frederikssundsvej Marbækvej Beskrivelse af arbejdet - Etablering af midlertidige tilkørselsramper fra Frederikssundsvej og etablering af vejen mellem stationering og Start-/slutdato - marts 2016/ november Fjordforbindelsen Frederikssund Underføring og rundkørsler ved Frederikssundsvej Beskrivelse af arbejdet - Etablering af midlertidige tilkørselsramper fra Frederikssundsvej, og etablering af vejen mellem stationering og Start-/slutdato / Fjordforbindelsen Frederikssund Kompensationsbiotoper Beskrivelse af arbejdet Etablering og oprensning af vandhuller som led i de kompenserende tiltag i projektet. Start-/slutdato - efterår 2015/ efterår Fjordforbindelsen Frederikssund Faste tavler, herunder vejvisningstavler Beskrivelse af arbejdet - Etablering af skiltning for projektet. Start-/slutdato - efterår 2016 / vinter Fjordforbindelsen Frederikssund Beplantning Beskrivelse af arbejdet Beplantningsentreprisen for projektet Start-/slutdato 2019/ Fjordforbindelsen Frederikssund Trafikledelsessystemer, herunder variable tavler Beskrivelse af arbejdet Etablering af ITS-systemer for projektet. Start-/slutdato 2018/ Fjordforbindelsen Frederikssund Nedrivning af eksisterende bygninger SWS MR 4
5 Beskrivelse af arbejdet Nedrivning af eksisterende bygninger. Bygherre - Vejdirektoratet Start-/slutdato marts 2016/ december ETAB Fjordforbindelsen Frederikssund Betalingsanlæg Beskrivelse af arbejdet Etablering og idriftsættelse af betalingsinfrastruktur og -systemer for projektet. Start-/slutdato 2018 / 2019 Service translation SWS 03 Worksite (Ruling language of SAB 03 - Arbejdsplads is Danish) Correction to SWS 03 Worksite, section 1.5 (Preceding, Concurrent or Future Contracts): 1.5 Preceding, Concurrent or Future Contracts The Contractor shall be aware of the following contracts which shall either precede, be concurrent to or take place after the works: Fjordforbindelsen Frederikssund (Fjord Link Frederikssund) Expressway Frederikssundsvej Marbækvej Works description - Construction of the temporary access ramps from Frederikssundsvej, and construction of the road between chainage to Start/finish date March 2016/ vember Fjordforbindelsen Frederikssund (Fjord Link Frederikssund) Underpass and Roundabouts at Frederikssundsvej Works description - Construction of the temporary access ramps from Frederikssundsvej, and construction of the road between chainage to Start/finish date 2018 / Fjordforbindelsen Frederikssund (Fjord Link Frederikssund) Compensation biotopes Works description Construction and restoration of waterholes as part of the nature compensation for the project. Start/finish date Autumn 2015/ Autumn Fjordforbindelsen Frederikssund (Fjord Link Frederikssund) Permanent signs including directional signage Works description - Construction of the signage for the project. Start/finish date Autumn 2016 / Winter Fjordforbindelsen Frederikssund (Fjord Link Frederikssund) Planting Works description Planting contract for the project Start/finish date 2019/ 2020 SWS MR 5
6 Fjordforbindelsen Frederikssund (Fjord Link Frederikssund) Traffic Management Systems inclusive of Variable Message Signs Works description Installation of ITS systems for the project Start/finish date 2018/ Fjordforbindelsen Frederikssund (Fjord Link Frederikssund) Demolition of existing buildings Works description Demolition of existing buildings. Start/finish date March 2016/ December ETAB Fjordforbindelsen Frederikssund (Fjord Link Frederikssund) Tolling Facility Works description Installation and commissioning of tolling infrastructure and systems for the project. Start/finish date 2018 / 2019 Is replaced with: 1.5 Preceding, Concurrent or Future Contracts The Contractor shall be aware of the following contracts which shall either precede, be concurrent to or take place after the works: Fjordforbindelsen Frederikssund (Fjord Link Frederikssund) Expressway Frederikssundsvej Marbækvej Works description - Construction of the temporary access ramps from Frederikssundsvej, and construction of the road between chainage to Start/finish date March 2016/ vember Fjordforbindelsen Frederikssund (Fjord Link Frederikssund) Underpass and Roundabouts at Frederikssundsvej Works description - Construction of the temporary access ramps from Frederikssundsvej, and construction of the road between chainage to Start/finish date 2018 / Fjordforbindelsen Frederikssund (Fjord Link Frederikssund) Compensation biotopes Works description Construction and restoration of waterholes as part of the nature compensation for the project. Start/finish date Autumn 2015/ Autumn 2016 SWS MR 6
7 Fjordforbindelsen Frederikssund (Fjord Link Frederikssund) Permanent signs including directional signage Works description - Construction of the signage for the project. Start/finish date Autumn 2016 / Winter Fjordforbindelsen Frederikssund (Fjord Link Frederikssund) Planting Works description Planting contract for the project Start/finish date 2019/ Fjordforbindelsen Frederikssund (Fjord Link Frederikssund) Traffic Management Systems inclusive of Variable Message Signs Works description Installation of ITS systems for the project Start/finish date 2018/ Fjordforbindelsen Frederikssund (Fjord Link Frederikssund) Demolition of existing buildings Works description Demolition of existing buildings. Start/finish date March 2016/ December ETAB Fjordforbindelsen Frederikssund (Fjord Link Frederikssund) Tolling Facility Works description Installation and commissioning of tolling infrastructure and systems for the project. Start/finish date 2018 / 2019 Correction to SWS 01 Design, Section 4.5.1: Specific Requirements for Precast Elements The following elements may be constructed of precast concrete: SWS PMR Box girders, Square/circular elements, Approach slabs, Edge beams, fascia, ground beams and other beams, Foundations, Wingwalls, Access stairs, Platform elements, Road safety barriers for central reserve (applies to High Bridge only). Is replaced with: 7
8 Specific Requirements for Precast Elements The following elements may be constructed of precast concrete: SWS PMR Box girders, Square/circular elements, Approach slabs, Fascia, ground beams and other beams, Foundations, Wingwalls, Access stairs, Platform elements, Road safety barriers for central reserve (applies to High Bridge only). Correction to SWS 01 Design, Table 4-5 Structural form: visible construction joints shall be allowed at the edge beam face. SWS PMR Is replaced with: visible horizontal construction joints shall be allowed at the edge beam face. SWS PMR Addition to SWS 01 Design, Table 4-5 Structural form: After requirement ID SWS , the following is added: The dimensional requirements for any cross tie beams, as shown in the support sections on Definition Drawing , shall also apply for integral piers. SWS PMR Corrections to SWS 01 Design, Section (High Bridge): Ribbed corrosion resistant reinforcement (stainless steel) shall be provided within the tidal and splash zones of the piers. SWS PMR The tidal zone is defined as 1.5 m below DVR90 level. SWS PMR 8
9 The splash zone is defined as 2.2 m above DVR90 level, taking into account future sea level rise. SWS PMR Is replaced with: Ribbed corrosion resistant reinforcement (stainless steel) shall be provided from the top of the splash zone to the bottom of the tidal zone. SWS PMR The tidal zone is defined as the zone from DVR90 to 1.5m below DVR90. SWS PMR The splash zone is defined as the zone from DVR90 to 2.2m above DVR90, taking into account future sea level rise. SWS PMR Kvalitets- og Miljøledelseskrav til totalentrepriser, bilag til SAB Styring og Samarbejde Rettelse af 3.2, underafsnit 10.2: Gennemførelse af projekteringsfasen: Kontrol af projektering og kontrolcertifikater Projekteringscertifikater og kontrolcertifikater skal stilles til rådighed i overensstemmelse med SWS Design Bilag 6. Erstattes af: Kontrol af projektering og kontrolcertifikater Projekteringscertifikater og kontrolcertifikater skal stilles til rådighed i overensstemmelse med SWS Design Bilag 4. Tilbuds- og afregningsgrundlag (TAG): additions or corrections. Tilbudsliste (TBL): additions or corrections. Udbudsbetalingsplan: A new version of the Udbudsbetalingsplan will be made available on the Supplier Portal. IKT specifikation: additions or corrections. 9
10 Tegninger/Drawings: additions or corrections. Models: additions or corrections. Other data files: Inroads.alg,.ird and.itl files will be made available on the Supplier Portal. Disclaimer: The Inroads files form part of the Information Room and as such constitute noncontractual documents. ne of the information in a non-contractual document will constitute a contract or any part of a contract with Tenderers. The Employer reserves the right to supplement, withdraw and amend the non-contractual information room documents at any time during the tender period. The Employer, its respective advisors, consultants, contractors, servants and/or agents will be under no liability for any error, misstatement or omission in the information room documents. Standards: additions or corrections. Protocols: Annexes to the Vandsynsprotokol will be made available on the Supplier Portal. Document list: The document list has been updated to Rev. 3 and will be made available on the Supplier Portal. 10
11 , Fjordforbindelsen Frederikssund Bilag til rettelsesblad 3 Appendix to Correction Sheet 3 Tender Queries: Vejdirektoratet has received the following queries on the tender material for the above-mentioned tender. The queries and their accompanying answers appear below: RET = Rettelsesblad/ Correction Sheet. Nr. Query Answer Answer in Ret no. Tender Corrections 1. According to the Document list the following document should be available for download, but we cannot find it on the VD webpage. Please advice when these document will be available. This document and model will be made available on the Supplier Portal. RET 1 - dokument Principiel tilladelse til etablering af midlertidig arbejdshavn i forbindelse med etablering af ny motortrafikvej i Roskilde Fj - dokument Miljø 1
12 Nr. Query Answer Answer in Ret no. Tender Corrections 2. The following document does not seem to appear on the Document List. Please advice if or where this document is to be placed on the document list. Bidders are referred to item number on the Document List. RET 1 - Kvalitets-og miljøledelseskrav til totalentrepriser According to the document list, some of the document should also be available in English as a service translation. As far as we can see the following document does not appear to be translated as of yet. Please advice when we can expect the following documents to be available in English. Bidders are advised that the service translations for the following documents will be made available on the Supplier Portal. RET Special conditions (SB) Pricing document (TBL) Special Conditions (SB) Pricing document (TBL) Method of measurement (TAG) Method of measurement (TAG) Water protocol (Vandsynsportokol) There will be no service translations made available for the other documents ICT description (IKT beskrivelse) 4. In several documents a reference to a payment plan is mentioned, e.g. SB, ad 2, stk. 2, item F "Udkast til betalingsplan af 4. december 2015". Could VD please clarify where we can find this payment plan (udbudsbetalingsplan). Bidders are advised that this document will be made available on the Supplier Portal with this addendum. RET 1 5. Can you provide us with the Inroads/ vapoint road model files (DTM, ALG) for all roads within The relevant Inroads files will be made available to bidders on the Supplier Portal. In relation to the DTM files, bidders are RET 1 2
13 Nr. Query Answer Answer in Ret no. Tender Corrections the project? referred to the 3D road geometry model. 6. Can you provide us with the 3D alignment for the high bridge, it has been left out in the digital road alignment file (14210_0200_8200_f4.cl.dgn)? The pdf drawings showing the same are also missing but they are shown in the drawing list Bidders are referred to the previous response to Tender Query 005. The files made available will allow generation of the 3D alignment for all roads including the expressway. RET 1 7. Can you provide us with English service translations of the Danish national annexes if you have these available? Bidders can see new service translations in the updated Document list RET 1 8. Can you clarify the thickness of the boundary to apply stainless steel in the tidal and splash zone for the high bridge (see SWS )? The bidder is requested to clarify the exact nature of the query. Bidders are referred to SWS-24 Concrete in relation to requirements for cover to reinforcement. RET 1 9. Will all bridge specific annexes and guidelines be translated in to English? Bidders are referred to the previous response to Tender Query 007 and the updated Document List. These documents will be uploaded as they become available. RET 2 All documents that are currently available are on the Vejregler website: V1%2fNavigation%2fVejreglerEnglish%2fC onstruction+and+planning%2fbridges+and+highw ay+structures%2feurocodes%2f 3
14 Nr. Query Answer Answer in Ret no. Tender Corrections 10. We urge Vejdirektoratet to consider postponing the deadline for delivering material for the first dialogue meeting for 4 weeks (subsequently also the dialogue meetings). Can that be accomplished? Bidders are referred to the new programme provided as part of this correction sheet. RET 2 Yes see corrections in RET Regarding BUT, Theme 1 in the first dialogue meeting: Vejdirektoratet has, in accordance with our beliefs, stated that the tenders cost for tendering are to be minimized and that the tender process has been designed with that in mind. Hence, we urge Vejdirektoratet to make the quantities from the illustrative design available for the tenders (no liability). It will reduce the cost for all 5 tenders as neither will have to derive quantities form the same models with the sole purpose of verifying Vejdirektoratets price. We kindly ask Vejdirektoratet please, to make the quantities from the illustrative design available. Bidders are referred to the models and data made available as part of the Information Room in relation to the calculation of quantities. additional data will be made available by the Employer. RET When will DRD publicize changes to the tender material after the first dialogue round? The DRD expects to publicize an updated version of the Tender Material approximately 2 weeks after the last meeting in the first dialogue round. RET We ask Vejdirektoretet, please to supply XML files for all road alignments in order for the tenders to increase the quality of our assessment of quantities. Vejdirektoratet has previously made XML files available in amongst others the Herning - Holstebro tender. These files will be made available to bidders as soon as possible. RET 2 Yes see corrections in RET 2 4
15 Nr. Query Answer Answer in Ret no. Tender Corrections 14. All annex' (bilag) to the Vandsynsprotokol seems to be missing. Please forward these annex'. For the annex Godkendelse i henhold til Miljøbeskyttelsesloven 28, Frederikssund Kommune, bidders are referred to the Document List, items Yes see corrections in The remaining annexes will be made available on the Supplier Portal. 15. Under interim deadline 2a [of the SB] a reference to Appendix 5 in SWS - Design is mentioned, containing the Client's design packages. SWS01 - Design only contains up to Appendix 4 (see page 151 in SWS01 - Design). Could VD please provide us with Appendix 5. It is confirmed that there are only 4 appendices to SWS01 Design. Bidders are referred to section 3.2 of Quality and environment management requirements for turnkey contracts, appendix to SWS Management and Cooperation ( Kvalitets- og Miljøledelseskrav til totalentrepriser, bilag til SAB Styring og Samarbejde") in relation to the design packages. Yes see corrections in 16. According to interim deadline 2a [of the SB] the design packages for foundations and pillars have to be submitted 8 months after contract signing and according to interim deadline 2c the result of the geotechnical investigations for the high bridge have to be submitted after 12 months. In our interpretation there is conflict between these two interim deadlines as we need the result of the geotechnical investigations in order to complete the design for foundations and pillars, ie. 2c comes before 2a. Should the two interim deadlines have been switched timewise or is interim deadline 2a only dealing with design for foundations and pillars for land-based bridges. Please clarify. Bidders are advised that interim deadline 2c only applies in relation to deviating ground conditions, as further set out in clause 15(4) of the SB. 5
16 Nr. Query Answer Answer in Ret no. Tender Corrections 17. The partial sum of the percentages under HP1 "Projektering" only add up to 50%, whereas in all other HP-groups they add up to 100%. Please clarify. Bidders are advised that a new version of the Udbudsbetalingsplan will be made available on the Supplier Portal. It should be noted that further changes form part of this document. Yes see corrections in 18. Please confirm that we have understood the following correctly. Every single time we pass under the transmission lines at st. 2.2 with a vehicle taller than 3m we have to call the owner of the transmission line, even though we have established portals for protection of the transmission line? This might be many times a day and from 6am to 18pm. Bidders are referred to requirement IDs SWS and SWS in SWS03-Arbejdsplads, as well as section 9 of SWS 02 Styring og Samarbejde. The Employer and the utility owner have agreed the permanent situation, which is to be in accordance with the alignment requirements shown on Definition Design Drawing no What happens if we cannot get hold of the owner of the transmission line? How does the Client and/or the owner entend to handle semi-permanent works, like excavation and building up of the road, underneath the transmission linis? How does the Client and/or owner entend to handle the permanent situation with normal traffic taller than 3m passes under the transmission lines? 19. According to SAB (p.2) contract being the road for ch is complete v. 2017, however according to SAB (p.11) access to the same road is It is assumed for the purposes of this query that the bidder is referring to contract Bidders are referred to the updated version of requirement ID SWS Yes see correction in 6
17 Nr. Query Answer Answer in Ret no. Tender Corrections stated as being v (access to site), being one year before. Please clarify. In case this access road (ch ) is not ready before v. 2017, how do the Contractor get access to the site compound at Frederikssundsvej and the complete site area between Marbækvej and Roskilde Fjord already in v (which is necessary) when Marbækvej is not allowed for heavy traffic. Please clarify in Section 1.5 of SWS 03 - Arbejdsplads (SWS 03 Worksite) provided as part of this correction sheet. 20. In "SWS01 - Design" it is given in Clause that "The design shall allow for a sacrificial thickness for the designated design life of the structure. corrosion protection shall be provided". The Employer is kindly asked to inform which corrosion rates shall be used for sheet pile walls (design life 120 yrs) as these can not be found in the SWS's. For corrosion rates to be used in design, bidders are referred to Section 1.1 of General Work Specification (GWS) - Foundation (Almindelig Arbejdsbeskrivelse (AAB) Betonbro Fundering). 21. The SWS specifications and the definition drawings do not define the Highest Astronomical Tide, Mean Sea Level or the Lowest Astronomical Tide. The information is provided in the document ARP-TN-CM-XX Kindly confirm that these are the levels to be taken for the project. This tender query will be addressed in Correction Sheet no The SWS specifications and the definition drawings do not outline the sea level rise which is to be used in the project to account for climate change over the service life of the bridge. The document DHI-RP-CM outlines a study which was done but no definite value is given. This tender query will be addressed in Correction Sheet no. 4. 7
18 Nr. Query Answer Answer in Ret no. Tender Corrections Kindly confirm the maximum sea level rise which is to be accounted for during the 120 serivce life of the bridge. Currently the report gives values to year In Clause SWS it states that the navigation clearance is to be DRV90. Kindly confirm that this clearance takes allowance for the future sea level rise. This tender query will be addressed in Correction Sheet no Clarification of query no. 8 answered in RET1: In Clause SWS it is stated than stainless steel is to be provided between the tidal zone and splash zone of the piers. In clause SW it is stated that stainless steel shall be provided as skin friction. Kindly clarify further the boundary section thickness in which stainless steel is to be placed and what is intended by the term skin friction. Bidders are referred to the updated version of requirement IDs SWS , SWS and SWS in Section of SWS01 Design provided as part of this correction sheet. The term skin friction is not used anywhere in the tender documentation. It should be noted that the Contractor shall determine as part of his design the required cover and type of reinforcement within the requirements of section Yes- see corrections in 25. Kindly confirm that it is the aesthetic intention that the integral piers in the high bridge will not have a cross tie. Therefore some piers will have one and others will not as per definition drawing Bidders are advised that it is not a particular requirement to have a cross tie beam. Bidders are referred to the additional requirement ID SWS in Table 4-5 of SWS 01 Design, which forms part of this correction sheet. Yes see corrections in 26. Clause SWS of SWS01 Design states that the edge beams are permitted to be precast concrete. However clause SWS states that a longitudinal construction joints Bidders are referred to the updated versions of requirement IDs SWS and SWS in Section of SWS01 Design, and requirement Yes see correction in 8
19 Nr. Query Answer Answer in Ret no. Tender Corrections between the deck slab and edge beam for reinforced concrete construction is not permitted. Additionally in SWS it is stated that no visible construction joints shall be allowed at the edge beam face. Kindly confirm that all of these clauses are correct. ID SWS in section 4.3 of SWS01 Design provided as part of this correction sheet. 27. In the Geotechnical Factual Report we find CPT data included as printouts in the pdf. Can CPT raw data (recordings) be provided digitally? Bidders are referred to the AGS files made available on the Supplier Portal to access the digital version of the CPT and other geotechnical factual data in digital format. Document Report 1; Rev 1.0; Geotechnical Factual Report by GEO. Geo Project Enclosure 1D.01 (Borehole Logs) - Appendix 1D.I (Interpreted CPT Logs) 28. Yesterday [ ] we received the mail attached below regarding new documents on the DRD portal. When activating the imbedded link, no new documents do however appear. It is confirmed that no new or revised Tender Documents were uploaded on the 15 th January Please disregard this notification, which was due to some minor text updates on the webpage. 29. Topic 2 for the first dialogue meeting, regarding optimized design: It is our understanding that the optimized design for High Bridge and Other Structures are clearly linked to our status in the Compliance matrix with regard to the PMR s. Can you elaborate on your expectations to, what role the solving of status for the PMR s in the Bidders are referred to sections 4.2 and 4.3 of the Bestemmelser om Udbud og Tilbud (Instructions to Tenderers) (BUT/ITT) in relation to the status of minimum requirements, preliminary minimum requirements and requirements. 9
20 Nr. Query Answer Answer in Ret no. Tender Corrections Compliance Matrix is to have in the dialogue meeting? Bidders are referred to section 5.4 of the BUT/ITT in relation to the written submission requirements for themes 1 and 2 as well as the focus for themes 1 and 2 for the dialogue meetings. 10
ATEX direktivet. Vedligeholdelse af ATEX certifikater mv. Steen Christensen stec@teknologisk.dk www.atexdirektivet.
ATEX direktivet Vedligeholdelse af ATEX certifikater mv. Steen Christensen stec@teknologisk.dk www.atexdirektivet.dk tlf: 7220 2693 Vedligeholdelse af Certifikater / tekniske dossier / overensstemmelseserklæringen.
Læs mereRETTELSESBLAD / SUPPLERENDE MEDDELELSER NR. 13 CORRECTION SHEET/ SUPPLEMENTARY NOTICE NO. 13
Dato 22. juni 2016 Sagsbehandler Stine Kirkeskov Mail STKI@vd.dk Telefon Dokument 15/10041-86 Side 1/11 To the Bidders RETTELSESBLAD / SUPPLERENDE MEDDELELSER NR. 13 CORRECTION SHEET/ SUPPLEMENTARY NOTICE
Læs merePortal Registration. Check Junk Mail for activation . 1 Click the hyperlink to take you back to the portal to confirm your registration
Portal Registration Step 1 Provide the necessary information to create your user. Note: First Name, Last Name and Email have to match exactly to your profile in the Membership system. Step 2 Click on the
Læs mereVores mange brugere på musskema.dk er rigtig gode til at komme med kvalificerede ønsker og behov.
På dansk/in Danish: Aarhus d. 10. januar 2013/ the 10 th of January 2013 Kære alle Chefer i MUS-regi! Vores mange brugere på musskema.dk er rigtig gode til at komme med kvalificerede ønsker og behov. Og
Læs mereDen nye Eurocode EC Geotenikerdagen Morten S. Rasmussen
Den nye Eurocode EC1997-1 Geotenikerdagen Morten S. Rasmussen UDFORDRINGER VED EC 1997-1 HVAD SKAL VI RUNDE - OPBYGNINGEN AF DE NYE EUROCODES - DE STØRSTE UDFORDRINGER - ER DER NOGET POSITIVT? 2 OPBYGNING
Læs mereMandara. PebbleCreek. Tradition Series. 1,884 sq. ft robson.com. Exterior Design A. Exterior Design B.
Mandara 1,884 sq. ft. Tradition Series Exterior Design A Exterior Design B Exterior Design C Exterior Design D 623.935.6700 robson.com Tradition OPTIONS Series Exterior Design A w/opt. Golf Cart Garage
Læs merePrivat-, statslig- eller regional institution m.v. Andet Added Bekaempelsesudfoerende: string No Label: Bekæmpelsesudførende
Changes for Rottedatabasen Web Service The coming version of Rottedatabasen Web Service will have several changes some of them breaking for the exposed methods. These changes and the business logic behind
Læs mereSubject to terms and conditions. WEEK Type Price EUR WEEK Type Price EUR WEEK Type Price EUR WEEK Type Price EUR
ITSO SERVICE OFFICE Weeks for Sale 31/05/2015 m: +34 636 277 307 w: clublasanta-timeshare.com e: roger@clublasanta.com See colour key sheet news: rogercls.blogspot.com Subject to terms and conditions THURSDAY
Læs mereTrolling Master Bornholm 2015
Trolling Master Bornholm 2015 (English version further down) Panorama billede fra starten den første dag i 2014 Michael Koldtoft fra Trolling Centrum har brugt lidt tid på at arbejde med billederne fra
Læs mereRETTELSESBLAD NR. 04 / CORRECTION SHEET NO. 04
To the Bidders Date 5. oktober 2016 Contact Person Niels Gottlieb Mail ng@vd.dk Phone 7244 3623 Document 16/10501-10 RETTELSESBLAD NR. 04 / CORRECTION SHEET NO. 04 STORSTRØMSBROEN 93200.001 This correction
Læs mereTrolling Master Bornholm 2016 Nyhedsbrev nr. 8
Trolling Master Bornholm 2016 Nyhedsbrev nr. 8 English version further down Der bliver landet fisk men ikke mange Her er det Johnny Nielsen, Søløven, fra Tejn, som i denne uge fangede 13,0 kg nord for
Læs mereBILAG 8.1.B TIL VEDTÆGTER FOR EXHIBIT 8.1.B TO THE ARTICLES OF ASSOCIATION FOR
BILAG 8.1.B TIL VEDTÆGTER FOR ZEALAND PHARMA A/S EXHIBIT 8.1.B TO THE ARTICLES OF ASSOCIATION FOR ZEALAND PHARMA A/S INDHOLDSFORTEGNELSE/TABLE OF CONTENTS 1 FORMÅL... 3 1 PURPOSE... 3 2 TILDELING AF WARRANTS...
Læs mereUnited Nations Secretariat Procurement Division
United Nations Secretariat Procurement Division Vendor Registration Overview Higher Standards, Better Solutions The United Nations Global Marketplace (UNGM) Why Register? On-line registration Free of charge
Læs mereProject Step 7. Behavioral modeling of a dual ported register set. 1/8/ L11 Project Step 5 Copyright Joanne DeGroat, ECE, OSU 1
Project Step 7 Behavioral modeling of a dual ported register set. Copyright 2006 - Joanne DeGroat, ECE, OSU 1 The register set Register set specifications 16 dual ported registers each with 16- bit words
Læs mereUnitel EDI MT940 June 2010. Based on: SWIFT Standards - Category 9 MT940 Customer Statement Message (January 2004)
Unitel EDI MT940 June 2010 Based on: SWIFT Standards - Category 9 MT940 Customer Statement Message (January 2004) Contents 1. Introduction...3 2. General...3 3. Description of the MT940 message...3 3.1.
Læs mereTrolling Master Bornholm 2014
Trolling Master Bornholm 2014 (English version further down) Den ny havn i Tejn Havn Bornholms Regionskommune er gået i gang med at udvide Tejn Havn, og det er med til at gøre det muligt, at vi kan være
Læs mereSkriftlig Eksamen Kombinatorik, Sandsynlighed og Randomiserede Algoritmer (DM528)
Skriftlig Eksamen Kombinatorik, Sandsynlighed og Randomiserede Algoritmer (DM58) Institut for Matematik og Datalogi Syddansk Universitet, Odense Torsdag den 1. januar 01 kl. 9 13 Alle sædvanlige hjælpemidler
Læs mereMandara. PebbleCreek. Tradition Series. 1,884 sq. ft robson.com. Exterior Design A. Exterior Design B.
Mandara 1,884 sq. ft. Tradition Series Exterior Design A Exterior Design B Exterior Design C Exterior Design D 623.935.6700 robson.com Tradition Series Exterior Design A w/opt. Golf Cart Garage Exterior
Læs mereRemember the Ship, Additional Work
51 (104) Remember the Ship, Additional Work Remember the Ship Crosswords Across 3 A prejudiced person who is intolerant of any opinions differing from his own (5) 4 Another word for language (6) 6 The
Læs mere1 s01 - Jeg har generelt været tilfreds med praktikopholdet
Praktikevaluering Studerende (Internship evaluation Student) Husk at trykke "Send (Submit)" nederst (Remember to click "Send (Submit)" below - The questions are translated into English below each of the
Læs mereNyhedsmail, december 2013 (scroll down for English version)
Nyhedsmail, december 2013 (scroll down for English version) Kære Omdeler Julen venter rundt om hjørnet. Og netop julen er årsagen til, at NORDJYSKE Distributions mange omdelere har ekstra travlt med at
Læs mereEngelsk. Niveau C. De Merkantile Erhvervsuddannelser September 2005. Casebaseret eksamen. www.jysk.dk og www.jysk.com.
052430_EngelskC 08/09/05 13:29 Side 1 De Merkantile Erhvervsuddannelser September 2005 Side 1 af 4 sider Casebaseret eksamen Engelsk Niveau C www.jysk.dk og www.jysk.com Indhold: Opgave 1 Presentation
Læs mereEngelsk. Niveau D. De Merkantile Erhvervsuddannelser September Casebaseret eksamen. og
052431_EngelskD 08/09/05 13:29 Side 1 De Merkantile Erhvervsuddannelser September 2005 Side 1 af 4 sider Casebaseret eksamen Engelsk Niveau D www.jysk.dk og www.jysk.com Indhold: Opgave 1 Presentation
Læs mereTrolling Master Bornholm 2016 Nyhedsbrev nr. 3
Trolling Master Bornholm 2016 Nyhedsbrev nr. 3 English version further down Den første dag i Bornholmerlaks konkurrencen Formanden for Bornholms Trollingklub, Anders Schou Jensen (og meddomer i TMB) fik
Læs mereUser Manual for LTC IGNOU
User Manual for LTC IGNOU 1 LTC (Leave Travel Concession) Navigation: Portal Launch HCM Application Self Service LTC Self Service 1. LTC Advance/Intimation Navigation: Launch HCM Application Self Service
Læs mereTrolling Master Bornholm 2013
Trolling Master Bornholm 2013 (English version further down) Tilmeldingen åbner om to uger Mandag den 3. december kl. 8.00 åbner tilmeldingen til Trolling Master Bornholm 2013. Vi har flere tilmeldinger
Læs mereTo the reader: Information regarding this document
To the reader: Information regarding this document All text to be shown to respondents in this study is going to be in Danish. The Danish version of the text (the one, respondents are going to see) appears
Læs mereOn the complexity of drawing trees nicely: corrigendum
Acta Informatica 40, 603 607 (2004) Digital Object Identifier (DOI) 10.1007/s00236-004-0138-y On the complexity of drawing trees nicely: corrigendum Thorsten Akkerman, Christoph Buchheim, Michael Jünger,
Læs mereDanish Language Course for International University Students Copenhagen, 12 July 1 August Application form
Danish Language Course for International University Students Copenhagen, 12 July 1 August 2017 Application form Must be completed on the computer in Danish or English All fields are mandatory PERSONLIGE
Læs mereAktivering af Survey funktionalitet
Surveys i REDCap REDCap gør det muligt at eksponere ét eller flere instrumenter som et survey (spørgeskema) som derefter kan udfyldes direkte af patienten eller forsøgspersonen over internettet. Dette
Læs mereBILAG 8.1.F TIL VEDTÆGTER FOR EXHIBIT 8.1.F TO THE ARTICLES OF ASSOCIATION FOR
BILAG 8.1.F TIL VEDTÆGTER FOR ZEALAND PHARMA A/S EXHIBIT 8.1.F TO THE ARTICLES OF ASSOCIATION FOR ZEALAND PHARMA A/S INDHOLDSFORTEGNELSE/TABLE OF CONTENTS 1 FORMÅL... 3 1 PURPOSE... 3 2 TILDELING AF WARRANTS...
Læs mereSPØRGSMÅL TIL UDBUD AF SYSTEMUNDERSTØTTELSE AF GEODANMARK PRÆKVALIFIKATIONSFASEN
SPØRGSMÅL TIL UDBUD AF SYSTEMUNDERSTØTTELSE AF GEODANMARK PRÆKVALIFIKATIONSFASEN EU-UDBUD NR. 2016/S 089-156404 (Version 5 af 1. juni 2016) Page 1 of 6 1 ESPD, Teknisk og faglig formåen I ESPD punkt IV,
Læs mereDanish Language Course for Foreign University Students Copenhagen, 13 July 2 August 2016 Advanced, medium and beginner s level.
Danish Language Course for Foreign University Students Copenhagen, 13 July 2 August 2016 Advanced, medium and beginner s level Application form Must be completed on the computer in Danish or English All
Læs mereSide 1 af 9. SEPA Direct Debit Betalingsaftaler Vejledning
Side 1 af 9 SEPA Direct Debit Betalingsaftaler Vejledning 23.11.2015 1. Indledning Denne guide kan anvendes af kreditorer, som ønsker at gøre brug af SEPA Direct Debit til opkrævninger i euro. Guiden kan
Læs mereIBM Network Station Manager. esuite 1.5 / NSM Integration. IBM Network Computer Division. tdc - 02/08/99 lotusnsm.prz Page 1
IBM Network Station Manager esuite 1.5 / NSM Integration IBM Network Computer Division tdc - 02/08/99 lotusnsm.prz Page 1 New esuite Settings in NSM The Lotus esuite Workplace administration option is
Læs mereApplication form for access to data and biological samples Ref. no
Application form for access to data and biological samples Ref. 2016-02 Project title: Applicant: Other partners taking part in the project Names and work addresses: "Skilsmisse og selvvurderet mentalt
Læs merePlease report absence, also if you don t plan to participate in dinner to Birgit Møller Jensen Telephone: /
Annex 01.01 Board Meeting - Draft Agenda Wednesday, 24 th April 2013 at 15.00-20.00 in the Meetery, AADK, Fælledvej 12, 2200 Copenhagen N Agenda Status Time (proposed) Annex Comments 1. Welcome and approval
Læs mereInfo og krav til grupper med motorkøjetøjer
Info og krav til grupper med motorkøjetøjer (English version, see page 4) GENERELT - FOR ALLE TYPER KØRETØJER ØJER GODT MILJØ FOR ALLE Vi ønsker at paraden er en god oplevelse for alle deltagere og tilskuere,
Læs mereTrolling Master Bornholm 2015
Trolling Master Bornholm 2015 (English version further down) Sæsonen er ved at komme i omdrejninger. Her er det John Eriksen fra Nexø med 95 cm og en kontrolleret vægt på 11,8 kg fanget på østkysten af
Læs mereDK - Quick Text Translation. HEYYER Net Promoter System Magento extension
DK - Quick Text Translation HEYYER Net Promoter System Magento extension Version 1.0 15-11-2013 HEYYER / Email Templates Invitation Email Template Invitation Email English Dansk Title Invitation Email
Læs mereBookingmuligheder for professionelle brugere i Dansehallerne 2015-16
Bookingmuligheder for professionelle brugere i Dansehallerne 2015-16 Modtager man økonomisk støtte til et danseprojekt, har en premieredato og er professionel bruger af Dansehallerne har man mulighed for
Læs mereAppendix 1: Interview guide Maria og Kristian Lundgaard-Karlshøj, Ausumgaard
Appendix 1: Interview guide Maria og Kristian Lundgaard-Karlshøj, Ausumgaard Fortæl om Ausumgaard s historie Der er hele tiden snak om værdier, men hvad er det for nogle værdier? uddyb forklar definer
Læs mereBrug sømbrættet til at lave sjove figurer. Lav fx: Få de andre til at gætte, hvad du har lavet. Use the nail board to make funny shapes.
Brug sømbrættet til at lave sjove figurer. Lav f: Et dannebrogsflag Et hus med tag, vinduer og dør En fugl En bil En blomst Få de andre til at gætte, hvad du har lavet. Use the nail board to make funn
Læs mereYDEEVNEDEKLARATION. Nr DA
YDEEVNEDEKLARATION Nr. 0055 DA 1. Varetypens unikke identifikationskode: fischer Termoz CN 8 2. Tilsigtet anvendelse: Produkt Nylondübel til anvendelse i beton og murværk Anvendelsesområde/r Til anvendelse
Læs mereSEPA Direct Debit. Mandat Vejledning 2013.03.15. Nets Lautrupbjerg 10 DK-2750 Ballerup
SEPA Direct Debit Mandat Vejledning 2013.03.15 Nets Lautrupbjerg 10 DK-2750 Ballerup Indholdsfortegnelse 1. Indledning... 3 1.1 Tilknyttet dokumentation... 3 1.2 Kontakt til Nets... 3 2. Krav til SEPA
Læs mereLAW FIRM ASSOCIATION FOR
LAW FIRM BILAG 8.1.C TIL VEDTÆGTER FOR ZEALAND PHARMA A/S EXHIBIT 8.1.C TO THE ARTICLES OF ASSOCIATION FOR ZEALAND PHARMA A/S INDHOLDSFORTEGNELSE/TABLE OF CONTENTS INDHOLDSFORTEGNELSE/TABLE OF CONTENTS...
Læs mereVelkommen til IFF QA erfa møde d. 15. marts Erfaringer med miljømonitorering og tolkning af nyt anneks 1.
Velkommen til IFF QA erfa møde d. 15. marts 2018 Erfaringer med miljømonitorering og tolkning af nyt anneks 1. 1 Fast agenda kl.16.30-18.00 1. Nyt fra kurser, seminarer, myndighedsinspektioner, audit som
Læs mereYDEEVNEDEKLARATION. Nr DA
YDEEVNEDEKLARATION Nr. 0003 DA 1. Varetypens unikke identifikationskode: fischer slaganker EA II 2. Tilsigtet anvendelse: Produkt Metalanker til brug i beton (let befæstigelse) Anvendelsesområde/r Anvendes
Læs merePage 2: Danish. Page 4: English
Identifikationsdokumenter når du har adresse i udlandet / Identification documents when you live abroad Guide til dokumentation/ Documentation Guidelines Page 2: Danish Page 4: English 1 Adresse i udlandet
Læs mereStrategic Capital ApS has requested Danionics A/S to make the following announcement prior to the annual general meeting on 23 April 2013:
Copenhagen, 23 April 2013 Announcement No. 9/2013 Danionics A/S Dr. Tværgade 9, 1. DK 1302 Copenhagen K, Denmark Tel: +45 88 91 98 70 Fax: +45 88 91 98 01 E-mail: investor@danionics.dk Website: www.danionics.dk
Læs mereHelp / Hjælp
Home page Lisa & Petur www.lisapetur.dk Help / Hjælp Help / Hjælp General The purpose of our Homepage is to allow external access to pictures and videos taken/made by the Gunnarsson family. The Association
Læs mereSikkerhedsvejledning
11-01-2018 2 Sikkerhedsvejledning VIGTIGT! Venligst læs disse instruktioner inden sengen samles og tages i brug Tjek at alle dele og komponenter er til stede som angivet i vejledningen Fjern alle beslagsdele
Læs mereInternational Workshop on Language Proficiency Implementation
International Workshop on Language Proficiency Implementation Langen, Germany 6-7 September, 2007 By Captain Rick Valdes IFALPA representative to ICAO s PRICE SG PRESENTATION OUTLINE IFALPA S policy on
Læs mereMolio specifications, development and challenges. ICIS DA 2019 Portland, Kim Streuli, Molio,
Molio specifications, development and challenges ICIS DA 2019 Portland, Kim Streuli, Molio, 2019-06-04 Introduction The current structure is challenged by different factors. These are for example : Complex
Læs mereTrolling Master Bornholm 2016 Nyhedsbrev nr. 5
Trolling Master Bornholm 2016 Nyhedsbrev nr. 5 English version further down Kim Finne med 11 kg laks Laksen blev fanget i denne uge øst for Bornholm ud for Nexø. Et andet eksempel er her to laks taget
Læs mereNOTIFICATION. - An expression of care
NOTIFICATION - An expression of care Professionals who work with children and young people have a special responsibility to ensure that children who show signs of failure to thrive get the wright help.
Læs mereBoligsøgning / Search for accommodation!
Boligsøgning / Search for accommodation! For at guide dig frem til den rigtige vejledning, skal du lige svare på et par spørgsmål: To make sure you are using the correct guide for applying you must answer
Læs mereSpecial VFR. - ved flyvning til mindre flyveplads uden tårnkontrol som ligger indenfor en kontrolzone
Special VFR - ved flyvning til mindre flyveplads uden tårnkontrol som ligger indenfor en kontrolzone SERA.5005 Visual flight rules (a) Except when operating as a special VFR flight, VFR flights shall be
Læs mereElektriske apparater til husholdningsbrug o.l. Sikkerhed Del 1: Generelle krav
Dansk standard Tillæg DS/IEC 60335-1/A1:2013 + Corr 1:2014 1. udgave 2014-05-08 Elektriske apparater til husholdningsbrug o.l. Sikkerhed Del 1: Generelle krav Household and similar electrical appliances
Læs mereTrolling Master Bornholm 2016 Nyhedsbrev nr. 7
Trolling Master Bornholm 2016 Nyhedsbrev nr. 7 English version further down Så var det omsider fiskevejr En af dem, der kom på vandet i en af hullerne, mellem den hårde vestenvind var Lejf K. Pedersen,
Læs mereApplication form for offshore helideck in Danish territorial waters
Application form for offshore helideck in Danish territorial waters Application date (yyyy/mm/dd): Company name / Applicant name: Applicant postal address: CVR number (if applicable): Rig / Ship name:
Læs mereYDEEVNEDEKLARATION. Nr DA
YDEEVNEDEKLARATION Nr. 0072 DA 1. Varetypens unikke identifikationskode: Injektionssystem FIS V 2. Tilsigtet anvendelse: Produkt Limanker til brug i beton Anvendelsesområde/r Til fastgørelse og understøttelse
Læs mereKALK- OG TEGLVÆRKSFORENINGEN. CPR Sustainable Construction
CPR Sustainable Construction 1 Tommy Bisgaard - Direktør i Kalk- og Teglværksforeningen - Formand for DS 417 (CEN TC350 & 351) - Formand for miljøkomiteen i TBE & CU (keramiske industrier i Europa) - Medlem
Læs mereYDEEVNEDEKLARATION. Nr DA
YDEEVNEDEKLARATION Nr. 0088 DA 1. Varetypens unikke identifikationskode: fischer Injektionssystem FIS EM 2. Tilsigtet anvendelse: Produkt Limanker til anvendelse i beton Anvendelsesområde/r Post-installeret
Læs mereCentral Statistical Agency.
Central Statistical Agency www.csa.gov.et 1 Outline Introduction Characteristics of Construction Aim of the Survey Methodology Result Conclusion 2 Introduction Meaning of Construction Construction may
Læs mereShooting tethered med Canon EOS-D i Capture One Pro. Shooting tethered i Capture One Pro 6.4 & 7.0 på MAC OS-X 10.7.5 & 10.8
Shooting tethered med Canon EOS-D i Capture One Pro Shooting tethered i Capture One Pro 6.4 & 7.0 på MAC OS-X 10.7.5 & 10.8 For Canon EOS-D ejere der fotograferer Shooting tethered med EOS-Utility eller
Læs mereUdbud på engelsk i UCL. Skabelon til beskrivelse
Udbud på engelsk i UCL Skabelon til beskrivelse Indhold 1. Forord... 3 2. What to do... 3 3. Skabelon... 4 3.1 Course Overview... 4 3.2 Target Group... 4 3.3 Purpose of the module... 4 3.4 Content of the
Læs merePARALLELIZATION OF ATTILA SIMULATOR WITH OPENMP MIGUEL ÁNGEL MARTÍNEZ DEL AMOR MINIPROJECT OF TDT24 NTNU
PARALLELIZATION OF ATTILA SIMULATOR WITH OPENMP MIGUEL ÁNGEL MARTÍNEZ DEL AMOR MINIPROJECT OF TDT24 NTNU OUTLINE INEFFICIENCY OF ATTILA WAYS TO PARALLELIZE LOW COMPATIBILITY IN THE COMPILATION A SOLUTION
Læs mereLinear Programming ١ C H A P T E R 2
Linear Programming ١ C H A P T E R 2 Problem Formulation Problem formulation or modeling is the process of translating a verbal statement of a problem into a mathematical statement. The Guidelines of formulation
Læs mereYDEEVNEDEKLARATION. Nr DA
YDEEVNEDEKLARATION Nr. 0100 DA 1. Varetypens unikke identifikationskode: Injektionssystem fischer Powerbond 2. Tilsigtet anvendelse: Produkt Limanker til brug i beton Anvendelsesområde/r Til fastgørelse
Læs mereANNONCERING AF CYKELTAXAHOLDEPLADSER I RØD ZONE OG LANGELINIE
KØBENHAVNS KOMMUNE Teknik- og Miljøforvaltningen Byens Anvendelse CYKELTAXA I RØD ZONE 5. oktober 2018 ANNONCERING AF CYKELTAXAHOLDEPLADSER I RØD ZONE OG LANGELINIE English version Der er nu mulighed for
Læs mereMasters Thesis - registration form Kandidatafhandling registreringsformular
Masters Thesis - registration form Kandidatafhandling registreringsformular Godkendelse af emne for hovedopgave af vejleder og undervisningskoordinator. Læs venligst retningslinjerne sidst i dette dokument
Læs mereSmall Autonomous Devices in civil Engineering. Uses and requirements. By Peter H. Møller Rambøll
Small Autonomous Devices in civil Engineering Uses and requirements By Peter H. Møller Rambøll BACKGROUND My Background 20+ years within evaluation of condition and renovation of concrete structures Last
Læs mereYDEEVNEDEKLARATION. Nr DA
YDEEVNEDEKLARATION Nr. 0005 DA 1. Varetypens unikke identifikationskode: fischer slaganker EA II 2. Tilsigtet anvendelse: Produkt Metalanker til brug i beton (svær befæstigelse) Anvendelsesområde/r Til
Læs mereAn expression of care Notification. Engelsk
An expression of care Notification Engelsk Kolding Kommune Senior- og Socialforvaltningen, Familierådgivningen Professionals who work with children and young have a special responsibility to ensure that
Læs mereYDEEVNEDEKLARATION. DoP: 0084 til fischer Highbond-Anchor FHB II Inject (Limanker til anvendelse i beton) DA
YDEEVNEDEKLARATION DoP: 0084 til fischer Highbond-Anchor FHB II Inject (Limanker til anvendelse i beton) DA 1. Varetypens unikke identifikationskode: DoP: 0084 2. Tilsigtet anvendelse: Post-installeret
Læs mereSustainable investments an investment in the future Søren Larsen, Head of SRI. 28. september 2016
Sustainable investments an investment in the future Søren Larsen, Head of SRI 28. september 2016 Den gode investering Veldrevne selskaber, der tager ansvar for deres omgivelser og udfordringer, er bedre
Læs mereLæs venligst Beboer information om projekt vandskade - sikring i 2015/2016
Læs venligst Beboer information om projekt vandskade - sikring i 2015/2016 Vi er nødsaget til at få adgang til din lejlighed!! Hvis Kridahl (VVS firma) har bedt om adgang til din/jeres lejlighed og nøgler,
Læs mereId Dokumentnavn Sagsnummer Hændelse #0 Re: SV: SV: Your Conference Registration G #0
Indholdsfortegnelse Id Dokumentnavn Sagsnummer Hændelse 952892#0 Re: SV: SV: Your Conference Registration 81.00.00-G00-5-16 16-03-2016 952888#0 Betaling til Spanien tilmelding konference i Bilbao Tina
Læs mereTrolling Master Bornholm 2014
Trolling Master Bornholm 2014 (English version further down) Ny præmie Trolling Master Bornholm fylder 10 år næste gang. Det betyder, at vi har fundet på en ny og ganske anderledes præmie. Den fisker,
Læs mereUheldsmodeller på DTU Transport - nu og fremover
Downloaded from orbit.dtu.dk on: Jan 20, 2019 på DTU Transport - nu og fremover Hels, Tove Publication date: 2011 Document Version Også kaldet Forlagets PDF Link back to DTU Orbit Citation (APA): Hels,
Læs mereYDEEVNEDEKLARATION. Nr DA
YDEEVNEDEKLARATION Nr. 0081 DA 1. Varetypens unikke identifikationskode: fischer boltanker FAZ II 2. Tilsigtet anvendelse: Produkt Moment-kontrolleret ekspansionsanker Anvendelsesområde/r Post-installeret
Læs mereTrolling Master Bornholm 2014
Trolling Master Bornholm 2014 (English version further down) Populært med tidlig færgebooking Booking af færgebilletter til TMB 2014 er populært. Vi har fået en stribe mails fra teams, som har booket,
Læs mereYDEEVNEDEKLARATION. Nr DA
YDEEVNEDEKLARATION Nr. 0016 DA 1. Varetypens unikke identifikationskode: fischer betonskrue FBS 5 og FBS 6 2. Tilsigtet anvendelse: Produkt Metalanker til brug i beton (let befæstigelse) Anvendelsesområde/r
Læs mereE K S T R A O R D I N Æ R G E N E R A F O R S A M L I N G E X T R A O R D I N A R Y G E N E R A L M E E T I N G. Azanta A/S. J.nr.
J.nr. 210150001 E K S T R A O R D I N Æ R G E N E R A F O R S A M L I N G E X T R A O R D I N A R Y G E N E R A L M E E T I N G Azanta A/S Brinkmann Kronborg Henriksen Advokatpartnerselskab /// Amaliegade
Læs mereUserguide. NN Markedsdata. for. Microsoft Dynamics CRM 2011. v. 1.0
Userguide NN Markedsdata for Microsoft Dynamics CRM 2011 v. 1.0 NN Markedsdata www. Introduction Navne & Numre Web Services for Microsoft Dynamics CRM hereafter termed NN-DynCRM enable integration to Microsoft
Læs mereSkriftlig Eksamen Diskret matematik med anvendelser (DM72)
Skriftlig Eksamen Diskret matematik med anvendelser (DM72) Institut for Matematik & Datalogi Syddansk Universitet, Odense Onsdag den 18. januar 2006 Alle sædvanlige hjælpemidler (lærebøger, notater etc.),
Læs mereTrolling Master Bornholm 2014
Trolling Master Bornholm 2014 (English version further down) Så er ballet åbnet, 16,64 kg: Det er Kim Christiansen, som i mange år også har deltaget i TMB, der tirsdag landede denne laks. Den måler 120
Læs mereFinancial Literacy among 5-7 years old children
Financial Literacy among 5-7 years old children -based on a market research survey among the parents in Denmark, Sweden, Norway, Finland, Northern Ireland and Republic of Ireland Page 1 Purpose of the
Læs mereGUIDE TIL BREVSKRIVNING
GUIDE TIL BREVSKRIVNING APPELBREVE Formålet med at skrive et appelbrev er at få modtageren til at overholde menneskerettighederne. Det er en god idé at lægge vægt på modtagerens forpligtelser over for
Læs mereImproving data services by creating a question database. Nanna Floor Clausen Danish Data Archives
Improving data services by creating a question database Nanna Floor Clausen Danish Data Archives Background Pressure on the students Decrease in response rates The users want more Why a question database?
Læs mereTrolling Master Bornholm 2016 Nyhedsbrev nr. 6
Trolling Master Bornholm 2016 Nyhedsbrev nr. 6 English version further down Johnny Nielsen med 8,6 kg laks Laksen blev fanget seks sømil ud for Tejn. Det var faktisk dobbelthug, så et kig ned i køletasken
Læs mereYDEEVNEDEKLARATION. Nr DA. Anvendelsesområde/r Post-installeret befæstigelse i ikke-revnet beton, Se appendiks, specifikt appendiks B 1 - B 3
YDEEVNEDEKLARATION Nr. 0015 DA 1. Varetypens unikke identifikationskode: fischer ankerbolt FBN II, FBN II A4 2. Tilsigtet anvendelse: Produkt Moment-kontrolleret ekspansionsanker Anvendelsesområde/r Post-installeret
Læs mereYDEEVNEDEKLARATION. Nr DA
YDEEVNEDEKLARATION Nr. 0044 DA 1. Varetypens unikke identifikationskode: fischer slaganker EA II 2. Tilsigtet anvendelse: Produkt Metalanker til brug i beton (let befæstigelse) Anvendelsesområde/r Til
Læs mereImmigration Housing. Housing - Renting. Stating that you want to rent something. Type of accommodation. Type of accommodation. Type of accommodation
- Renting English I am looking for a to rent. Stating that you want to rent something room flat / apartment studio flat / studio apartment detached house semi-detached house terraced house How much is
Læs mereApplication form for access to data and biological samples Ref. no
Application form for access to data and biological samples Ref. 2016-16 Project title: Applicant: Other partners taking part in the project Names and work addresses: Investigation of preventable risk factors
Læs mere2, rue Mercier, 2985 Luxembourg, Luxembourg Fax: +352 29 29 42 670
European Union Publication of Supplement to the Official Journal of the European Union 2, rue Mercier, 2985 Luxembourg, Luxembourg Fax: +352 29 29 42 670 E-mail: ojs@publications.europa.eu Info & on-line
Læs mereDesign til digitale kommunikationsplatforme-f2013
E-travellbook Design til digitale kommunikationsplatforme-f2013 ITU 22.05.2013 Dreamers Lana Grunwald - svetlana.grunwald@gmail.com Iya Murash-Millo - iyam@itu.dk Hiwa Mansurbeg - hiwm@itu.dk Jørgen K.
Læs mereOur activities. Dry sales market. The assortment
First we like to start to introduce our activities. Kébol B.V., based in the heart of the bulb district since 1989, specialises in importing and exporting bulbs world-wide. Bulbs suitable for dry sale,
Læs mereDanish National Birth Cohort (DNBC)
Danish National Birth Cohort (DNBC) Application form for access to data and biological samples ref. 2011-32 Project title: Applicant: Betydning af feber under graviditeten for barnets motoriske udvikling
Læs mere