Trabecular Metal Humeral Stem

Størrelse: px
Starte visningen fra side:

Download "Trabecular Metal Humeral Stem"

Transkript

1 Zimmer Trabecular Metal Humeral Stem Surgical Technique Evolution Meets Revolution

2

3 Trabecular Metal Humeral Stem Surgical Technique Developed in conjunction with Louis Bigliani, M.D. New York Presbyterian Hospital Columbia-Presbyterian Center New York, New York Evan Flatow, M.D. Mount Sinai Medical Center New York, New York Ian Kelly, M.D. Glasgow Royal Infirmary Glasgow, Scotland George M. McCluskey III, M.D. McCluskey Orthopaedic Surgery Columbus, Georgia Anthony Miniaci, M.D. The Cleveland Clinic Foundation Cleveland, Ohio Gregory P. Nicholson, M.D. Rush University Medical Center Chicago, Illinois Michael Pearl, M.D. University of Southern California Los Angeles, California Ken Yamaguchi, M.D. Washington University St. Louis, Missouri Table of Contents Patient Positioning 2 Incision and Exposure 2 Humeral Preparation 3 Ream Humeral Canal 3 Resect Humeral Head 5 Assembling the Trabecular Metal Humeral Head Cutting Guide 5 Proximal Humeral Reaming 8 Stem Provisional Insertion 9 Humeral Head Selection 10 Final Humeral Preparation 12 Cemented & Press-fit Techniques Intraoperative Assembly 12 Humeral Head Removal 15 Intraoperative Stem Removal 15 Closure 15 Postoperative Management 15 Case Layouts 16

4 Patient Positioning Patient positioning is especially important in total shoulder surgery (Fig. 1). Place the patient in a semibeach-chair position. Use a head rest that allows for the superior part of the table to be removed. Place two towels under the spine and the medial border of the scapula to raise the affected side. Raise the head of the table approximately degrees to reduce venous pressure. Attach a short arm board to the table, or use another arm support method that will allow the arm to be raised or lowered as necessary throughout the procedure. Fig. 2 Fig. 3 Fig. 1 Incision and Exposure First, mark the coracoid process. Then mark the line of the incision, beginning at the clavicle just lateral to the coracoid process. Extend the line along the deltopectoral groove to the area of the mid-humerus (Fig. 2). Then make the incision following the line. Undermine the skin flaps to improve exposure. Dissect subcutaneous tissue from the deltoid fascia, and expose the deltoid and pectoralis major muscles. Retract the skin by placing Gelpi retractors about one-third of the way down, and one-third of the way up. Develop the deltopectoral interval, retracting the pectoralis major medially and the deltoid laterally. Identify and dissect the interval between the pectoralis major muscle and the cephalic vein. Retract the cephalic vein either medially or, preferably, laterally as this will minimize bleeding from the deltoid muscle or cephalic vein. Release the upper 1cm-2cm of the insertion of the pectoralis major tendon, being careful to avoid the long head of the biceps tendon. In very tight shoulders, the pectoralis may need to be completely released. Tag the pectoralis major muscle with a suture so it can be easily identified for later reattachment. Reposition the distal medial retractor under the pectoralis major muscle. Release any adhesions between the deltoid and strap muscles (coracobrachialis and short head of biceps) and develop a plane between the strap muscles and the humerus. Reposition the proximal medial retractor under the strap muscles (Fig. 3). Sweep the bursa off the humeral head and the greater tuberosity. Then expose the superior portion of the subacromial space by resecting the leading edge of the coracoacromial ligament. Identify the superior and inferior margins of the subscapularis tendon. Divide the tendon just medial to the bicipital groove and remove it from the lesser tuberosity. Being careful inferiorly to avoid the axillary nerve, retract the subscapularis medially, exposing the articular surface of the humeral head. It is very important to maintain as much length of the subscapularis muscle as possible. Remove the capsule and subscapularis tendon as a unit laterally from the humerus. Do this as close as possible to the humeral neck to avoid injury to the axillary nerve. External rotation of the humerus is helpful. In cases where there is a large inferior osteophyte on the humeral head, it is especially important to dissect the capsule off the neck of the humerus laterally as the axillary nerve is on the medial and inferior aspect of the osteophyte. Medially, at the glenoid rim, the capsule and labrum can be separated from the subscapularis tendon. This will facilitate lateral mobilization.

5 Humeral Preparation The goal in replacing the humeral head is to place a prosthetic articular surface precisely on the proximal humerus as it would have been before the destructive arthritic process began. The relationship among bony anatomy, rotator cuff insertions, and soft tissue tension must all be considered. Technique Tip: To facilitate access to the humeral canal, the shoulder should be off the table. To accomplish this, push the elbow back and externally rotate the arm. Note: Both Bigliani/Flatow Humeral General and Trabecular Metal Humeral instrument trays are needed for this procedure. Using the reamers from Bigliani/Flatow tray, attach a Short Intramedullary Reamer with a trocar point to the Ratchet T-handle (Fig. 4). There are three positions marked on the collar of the T-handle: FORWARD, LOCKED, and REVERSE. To ream the starter hole, use the FORWARD position (Fig. 5). Short Intramedullary Reamers are available in diameters of 6mm, 7mm, and 8mm, and the appropriate size should be chosen for the patient s humeral canal. Place the trocar tip of the reamer just posterior to the bicipital groove (Fig. 6) and ream a starter hole. A mallet may be used to start the hole in hard bone. Fig. 5 Ream Humeral Canal Dislocate the humeral head by externally rotating and extending the humerus. If necessary, place a metal finger inferiorly between the humerus and the glenoid. Removal of capsule from the inferior aspect of the humeral neck may be needed to achieve dislocation. Before reaming the canal, it is important to remove all anterior or inferior osteophytes so that the true anatomical neck (junction of the articular cartilage and cortical bone) can be determined. T-Handle Intramedullary Reamer Fig. 4 Fig. 6

6 Attach the T-handle to the longer, blunt-tipped Intramedullary Tapered Reamer of the same diameter and begin manually reaming the humeral canal. Use progressively larger reamers in 1mm increments until resistance is felt from cortical contact in the canal. Continue reaming to the appropriate depth as indicated on the reamer shaft (Fig. 7). These reamers have blunt tips to help guide them down the canal and prevent obtrusion into cortical bone. Remove the T-handle, but leave the last reamer in the canal to interface with the Humeral Head Cutting Guide. Note: This reamer will be used again after humeral head resection. Determining Humeral Resection Angle Choose the appropriate angle to make the first cut using pre- or intraoperative techniques. The Trabecular Metal Humeral Silhouettes can be used to aid this assessment (Fig. 8). Based upon this evaluation, choose the matching Trabecular Metal Humeral Cutting Guide. Note: If the angle hasn t been determined, use of the 48 Cutting Guide first would allow you to later change to a 42 cut without violating the rotator cuff insertion site. However, if you use a 42 Cutting Guide, converting to a 48 may violate the rotator cuff insertion site. Depth Indication Fig. 8 Note: The Trabecular Metal Humeral Cutting Guide 42 preparation instruments are color coded gold throughout the system. This is to distinguish them from the 48 preparation instruments. Fig. 7

7 Resect Humeral Head Assemble the Trabecular Metal Humeral Cutting Guide for either a right or left configuration. (See Assembling the Trabecular Metal Humeral Head Cutting Guide. Assembling the Trabecular Metal Humeral Head Cutting Guide Align the groove on the boom stem with the groove on the cutting block. Push the components together until they snap into place (Step A). With the thumb screw at the end of the boom pointed toward you, observe the various R or L etchings that indicate a right or left configuration. All the etchings that are facing you now should be the same, either R or L (Step B). To change the right/left orientation, remove the thumb screw at the end of the boom (Step C). Then loosen the second thumb screw on the box at the top of the boom stem. Slide the boom stem off the end of the boom. Rotate the sleeve, top to bottom, and reinsert into the opposite side of the box at the top of the boom stem (Step D). Retighten the thumb screw on the box at the top of the boom stem. Then reinsert and tighten the thumb screw at the end of the boom. Finally, verify that all the appropriate right or left etch marks are visible when the boom thumb screw is facing you (Step E). Step D Step A Step C Step B Step E

8 Slide the boom sleeve over the reamer shaft (Fig. 9). Adjust the depth of cut by moving the sleeve up or down on the reamer shaft. Rotate the sleeve on the reamer shaft until the point is approximately in line with the bicipital groove (Fig. 10). Typically, the tip of the boom sleeve should be touching articular cartilage/bone surface. Then tighten the first thumb screw, which Boom* is located on the end of the boom. Advance the boom stem and cutting block along the boom until the block contacts the bone (Fig. 11). Tighten the second thumb screw, which is located at the junction of the boom and boom stem. To gauge the retroversion of the cut, insert Threaded Alignment Rods into the holes marked 20 degrees and 40 degrees on the cutting block (Fig. 12a). Then line up the rods with the forearm to assess the retroversion (Fig. 12b). Retroversion can be adjusted by loosening both thumb screws and rotating the cutting guide about the axis of the Intramedullary Reamer. The forearm should be between the 20 degree and 40 degree rods (Fig. 12c). Then retighten the thumb screws, being sure that the cutting block is again touching the bone (Fig. 12d). Sleeve* Boom Stem* Fig. 12a Fig. 9 * Available in Bigliani/Flatow Tray Fig. 11 Boom Sleeve Trabecular Metal Humeral Cutting Guide Bicipital Groove Fig. 12b Fig. 10 Note: Threaded Alignment Rods must be used in the cutting block. Nonthreaded Alignment Rods from the Bigliani/Flatow Humeral General Instrument Set can be used in the boom assembly (Fig. 12b).

9 Threaded Alignment Rods Partially insert a Cutting Guide Pin or 3.2mm Threaded Pin from the Bigliani/ Flatow Fracture Instrument Kit with Pin Driver through one of the lateral/medial holes in the cutting block. Fully insert a second pin through one of the medial/ lateral holes (Fig. 14). If the cortex is very hard, predrill these holes using a drill with a diameter between 2.0mm and 2.7mm. Fig. 12c Loosen both thumb screws on the guide and remove the boom, leaving the cutting block in place. Set the T-handle to the REVERSE position. Attach the T-handle to the reamer and remove the reamer from the humeral canal. The Threaded Alignment Rods may be removed prior to making the cut. It is important to make the cut along the articular surface as this will help ensure the correct retroversion on the majority of cases. Care must be taken to avoid cutting into the rotator cuff posteriorly. Use an oscillating saw to resect the humeral head (Fig. 15). Then remove the cutting block. Fig. 14 Cutting Guide Pin Puller Cutting Guide Pin Fig. 12d Insert the Humeral Head Cutting Guide Fingers into the cutting slots to visualize the path of the saw blade through the bone and confirm the angle of inclination chosen (Fig. 13). Confirm that the cut will not violate the rotator cuff insertion but will still remove the articular cartilage on the humeral head. If necessary, loosen the thumb screw at the end of the boom, and move the sleeve up or down to adjust the depth of cut. In some cases, the shoulder capsule may be too tight to accommodate the fingers. After the humeral head has been resected, reinsert the final humeral reamer until the 130mm depth marking is even with the medial opening of the canal. Fig. 13 Humeral Head Cutting Guide Fingers Fig. 15

10 Proximal Humeral Reaming Proximal Reamer & Provisional Size Size 6/8 Size 9/10 Size 11/12 Size 13/14 Size 15/16 Size 17/18 Implant Size 6 x 130mm 8 x 130mm 8 x 170mm 9 x 130mm 10 x 130mm 10 x 170mm 11 x 130mm 12 x 130mm 12 x 170mm 13 x 130mm 14 x 130mm 14 x 170mm 15 x 130mm 16 x 130mm 17 x 130mm 18 x 130mm 6mm 8mm 9mm 10mm 11mm 12mm 13mm 14mm 15mm 16mm 17mm 18mm Distal Reamer Size* *Note: If cementing distally, a larger distal reamer may be used to create a cement mantle but the proximal reamer size should match the implant size to create a press fit of the Trabecular Metal section. Select the appropriate Tapered Trabecular Metal Proximal Humeral Reamer (see chart above). The Tapered Proximal Reamers are matched to the implant size. Note: Consecutive odd and even distal stem diameters use the same Tapered Proximal Reamer (e.g. the 9mm and 10mm stems use the 9/10mm Tapered Proximal Reamer). The 6mm and 8mm stems use the 6mm and 8mm Proximal Reamers, respectively. Attach the Distal Pilot matching the reamed humeral canal to the Tapered Trabecular Metal Proximal Reamer (Fig. 16). The Distal Pilot should spin freely. Note: 6mm Reamer does not use a Distal Pilot. Proximal Reamer Distal Pilot Attach the T-handle and manually ream the proximal humerus until the Reamer is flush with the proximal-lateral edge of the canal opening (Fig. 17). Fig. 16 Fig. 17

11 Stem Provisional Insertion Attach the appropriate Distal Pilot to the Trabecular Metal Humeral Stem Provisional (Fig. 18). Choose the Proximal Provisional that matches the Proximal Reamer that was used and the Distal Pilot that matches the Distal Reamer used. Consecutive odd and even distal stem diameters use the same Proximal Trabecular Metal Humeral Stem Provisional (e.g. the 9mm and 10mm stems use the 9/10mm Proximal Trabecular Metal Humeral Stem Provisional). Edges of Trabecular Metal Pad Suture Holes There are 20-degree and 40-degree holes on the Inserter/Extractor to allow for verification of the stem retroversion using the Threaded Alignment Rods (Fig. 19). Technique Tip: To facilitate access to the humeral canal, the shoulder should be off the table. To accomplish this, push the elbow back and externally rotate the arm. The Alignments Rods may be removed prior to impacting Humeral Stem Provisional. Insert and impact the Humeral Stem Provisional into the humeral canal until the collar is flush with the cut surface (Fig. 20). The fin on the Proximal Humeral Stem Provisional is self-cutting to prepare a path for the fin on the stem implant. This should place the humeral component in the correct degree of retroversion for that patient. Remove the Inserter/Extractor by opening the handle completely. Use a curette to remove any bone from the center hole of the Humeral Stem Provisional. This will allow for later placement of the Humeral Head Provisional (Fig. 21). Leave the Humeral Stem Provisional in place to help minimize bleeding and protect soft tissue during the glenoid preparation. Note: If a total shoulder is being performed, glenoid preparation would occur at this point. Refer to the Bigliani/Flatow Total Shoulder Arthroplasty Surgical Technique for additional information. Clamp Arm Clamp Fig. 18 Note: The 6mm stem uses the monoblock 6mm provisionals. Attach the Proximal Trabecular Metal Humeral Stem Provisional to the Humeral Stem Inserter/Extractor by the following steps: Handle Fig Open the Humeral Stem Inserter/ Extractor Handle completely. 2 Retract the Clamp Arm approximately half way. 3 4 Insert the Distal Tip into the Inserter/Extractor hole on the Trabecular Metal Humeral Stem Provisional Assembly. Advance the Clamp Arm into the hole located in the center of the collar until it is completely seated in the provisional. Fig. 19 Distal Tip Fig Close the Inserter Handle.

12 10 Humeral Head Selection Choose the Humeral Head Provisional from the Bigliani/Flatow Humeral General Instrument Tray that best covers the prepared surface of the proximal humerus and fills the rotator cuff circumferentially. Standard and offset heads are available. Insert a metallic Capture Pin into the Humeral Head Provisional (Fig. 22). The resected humeral head can be used as an initial reference for choosing the humeral head size (Figs. 23a & 23b). Note: If the humeral head height is matched to the resected head, the stem collar counterbore must be used to maintain this height. If the stem collar is not inset into the proximal canal, the effective head height will be increased by approximately 2-3mm. Offset Head Provisional Capture Pin Standard Head Provisional Place the Humeral Head Provisional on the Humeral Stem Provisional to the point where the head is at the level of the rotator cuff insertion. The humeral head must at least reach or slightly overhang the calcar medially (Fig. 24). If using an offset head, rotate the head into the proper anatomical position and mark the position on the bone at the etched line labeled MAX. Reduce the joint and check the fit on both the superficial and deep surfaces. Applied pressure to the appropriate humeral head will sublux the head about 50 percent of its diameter posteriorly and inferiorly, falling back into place when the pressure is released. A head that does not fill the capsule will dislocate over the glenoid rim, and one that overstuffs the joint will not allow this laxity assessment. Pull the subscapularis muscle over the joint. If the fit is too tight, release the tendon as necessary. Often, releasing the subscapularis from the anterior labrum and capsule will provide sufficient mobilization to the neck of the humerus. Remove the provisional components and perform any necessary soft tissue releases. If the humeral component is placed too low, the greater tuberosity will be relatively prominent and may impinge under the acromion. This condition can limit the range of motion. In addition, the resulting vector forces will drive the humeral head down against the inferior margin of the glenoid and can contribute to rocking and possible loosening. Therefore, it is important to always check that the superior aspect of the humeral head is above the superior aspect of the greater tuberosity. If the humeral component is placed too high, the supraspinatus muscle will be under too much tension around the prominent lateral margin of the humeral head. In addition, the uncovered calcar can abut under the inferior margin of the glenoid component and may lead to glenoid rocking and possible loosening. It is important to keep in mind the very precise relationship of the glenoid articular surface to the tuberosities and rotator cuff insertions so that contracture of the rotator cuff muscles and capsule do not eccentrically load the glenoid. The relationship of this entire complex to the acromion is also critical. The subacromial space should just accommodate the functional rotator cuff and tuberosities. Fig. 23a Fig. 22 D H Fig. 23b D = Diameter of the sphere created by extending the curvature of the head. H = Height between the bottom of the collar and the top of the head. Offset Head Provisional Fig. 24

13 11 Countersinking the Humeral Component If countersinking of the humeral component is desired, assemble the appropriate Stem Collar Counterbore (42 or 48 ) using the appropriate size Distal Pilot to match the stem diameter chosen (Fig. 25a). Attach the Straight Driver to the counterbore (Fig. 25b) and make sure the tabs on the Straight Driver and the slots on the counterbore line up. Insert the distal pilot of the counterbore assembly into the humeral canal (Fig. 25c). (Do not use the Angled Driver.) Using the Ratcheting T-handle, counterbore the resected surface of the proximal humerus. The counterbore depth of cut is limited, and the Stem Collar Counterbore will bottom out (Fig. 25d). When removing the counterbore, do not pull up in line with the shaft of the driver. Instead, pull up in line with the axis of the humeral shaft. Fig. 25b Straight Driver Insert Pin Wrench Fig. 25d Attach the Humeral Stem Provisional/ Distal Pilot to the Humeral Inserter/ Extractor and reinsert the provisional to ensure that the collar is completely countersunk (Fig. 26). Stem Collar Counterbore Fig. 25c Distal Pilot Provisional Stem Fig. 25a Fig. 26

14 12 Final Humeral Preparation Attach the Inserter/Extractor to the Humeral Stem Provisional. Apply the Slaphammer Weight to the Inserter/ Extractor, and repeatedly impact until the Humeral Stem Provisional is removed from the canal (Fig. 27). Cemented & Press-fit Techniques Intraoperative Assembly Cemented Technique If using a Cement Restrictor Plug, insert a plug one centimeter distal to the tip of the Humeral Stem. The final selection of stem size is a matter of surgeon judgment based on the preferred cementing technique. Thoroughly clean and dry the canal. Inject cement into the humeral canal. Use a finger to thoroughly pack the cement. Attach the humeral component to the Inserter/Extractor and insert the stem into the canal. Pull handle back to release inserter Fig. 27 Before inserting the final humeral component, drill four or five suture holes through the anterior neck of the proximal humerus. The drill holes should start superior, just anterior to the bicipital groove and proceed inferiorly to the inferior aspect of the neck just in front of the midline. Place heavy number 2 braided nylon sutures with swedged-on needles prior to cementing and/or inserting the implant. Each needle should progress from the outside cortex to the inside so that the same needle is used to place the sutures through the subscapularis tendon. By placing the subscapularis tendon more medially against the neck of the humerus, the tendon is effectively lengthened because it does not have to be placed lateral to the lesser tuberosity. Press-fit Technique The Humeral Stem can be press-fit by sizing to the reamed diameter. Attach the humeral component to the Humeral Stem Inserter/Extractor and insert the stem into the canal (Fig. 28). Stem Insertion Steps for Cemented & Press-fit Techniques Open the Humeral Stem Inserter/ Extractor handle completely. Retract the Clamp Arm approximately half way. Insert the Distal Tip of the Humeral Stem Inserter/Extractor into the proximal hole on the implant. Advance the Clamp Arm into the divot in the center of the taper until it is completely seated within the divot. Close the Inserter Handle. Fig. 28

15 13 Insert the two Alignment Rods into the 20-degree and 40-degree holes of the inserter/extractor and check retroversion (Fig. 29). When properly aligned, fully insert the stem into the canal. The Threaded Alignment Rods may be removed. Impact the component with a few light taps of the mallet. When the counterbore has been used, be sure that the collar of the component is seated flush with the cut surface of the humerus (Fig. 30). Fig. 29 Fig. 30 Humeral component seated flush with the cut surface of the humerus.

16 14 Note for Cemented Technique: The humeral head may be assembled to the implanted stem only after the cement has been allowed to fully cure. Remove the Capture Pin and place the Humeral Head Provisional on the humeral stem taper. Perform a trial reduction to check subscapularis tension. The subscapularis, when reinserted, should allow for 30 to 45 degrees of external rotation. However, sometimes with a chronically contracted rotator cuff, this is not possible. If the closure is too tight, a lower profile head may be used. Once the final head size has been selected, remove the Humeral Head Provisional. Thoroughly clean the humeral stem taper. If using an offset humeral head, attach the offset humeral head component to the Offset Humeral Head Inserter so the single prong is positioned at the MAX or previously marked indication (Fig. 31). Make sure protective sleeves are properly in place on the prongs of the Offset Humeral Head Inserter. Insert the final humeral head component so the single prong is at the mark made earlier (Fig. 32). If using a standard head. Assemble the taper by hand. Apply the Humeral Head Pusher to the head and impact it with a mallet (Fig. 33). Make sure that the head is firmly attached. Then reduce the joint and assess stability. Fig. 31 Fig. 32 Protective Sleeves Offset Humeral Head Inserter Fig. 33

17 15 Humeral Head Removal Should a humeral head ever have to be removed, slide the Head Distractor between the collar of the humeral stem and the undersurface of the humeral head (Fig. 34). Firmly tap the end of the instrument to loosen the head. This instrument can be used to remove either provisional heads or implants. Intraoperative Stem Removal Should the Trabecular Metal Humeral Stem ever need to be removed during initial implantation surgery, a Slaphammer can be used. Apply the Slaphammer Weight to the inserter/ extractor, and repeatedly impact until the Humeral Stem is removed from the canal (Fig. 35). Standard Slaphammers may be attached by threading into the proximal end of the humeral inserter/extractor. Closure After the definitive humeral head and stem prosthesis has been securely implanted, irrigate the wound and retrieve the previously prepared sutures from the anterior neck of the proximal humerus (page 12). Suture the subscapularis tendon inferiorly and repair it progressively to the superior sutures with the arm placed comfortably in 20 degrees to 30 degrees of external rotation. Insert a Hemovac Wound Drainage Device, being careful to avoid the axillary nerve. Close the deltoid and the subcutaneous layers. Then close the skin. Postoperative Management Fig. 34 Head Distractor Fig. 35 On the first postoperative day, the patient typically begins passive, assisted range of motion. This should include pendulum exercises, assisted forward elevation exercises in the standing and supine positions, and external rotation exercises with a stick in the supine position with the arm slightly abducted. The patient is typically discharged at two to four days postoperative, but should continue exercises as an outpatient with goals of 140-degrees forward elevation and 40-degrees external rotation within two to three weeks. Further range of motion is progressively achieved with stretching exercises. Active exercises are typically started after one to two weeks depending on the pathology. Active internal rotation should be avoided, however, as the subscapularis muscle has been repaired. After six weeks, more resistant strengthening exercises should be started. These exercises should emphasize stretching and balancing the range of motion. Strengthening is a secondary concern that need not be achieved until several months postoperatively.

18 16 Case Layouts Trabecular Metal Humeral Instrument Set ( ) Trabecular Metal Humeral Instrument Case ( ) Top Tray Threaded Alignment Rods ( ) 2 Proximal Reamers ( /18) 3 Wrench ( ) 4 130mm Distal Trials ( /018-13) 170mm Distal Trials ( /014-17) Bottom Tray 5 48 Counterbore ( ) 6 42 Counterbore ( ) 7 48 Cutting Guide ( ) 8 48 Silhouette ( ) 9 42 Cutting Guide ( ) Silhouette ( ) 11 Left Fracture Instruments ( ,18,21) 12 Humeral Inserter ( ) Proximal Trials ( /18) Proximal Trials ( /18) 15 Right Fracture Instruments ( ,18,21) Note: Both of the 6mm Stem Trials are monoblock.

19 17 Case Layouts Bigliani-Flatow Humeral Instrument Set ( ) Instruments listed below will be used for this Trabecular Metal Humeral Stem Surgical Technique Top Tray Short Intramedullary Reamers ( /008-01) 2 Intramedullary Reamers ( /016-00) 3 Cutting Guide Pins (4 each) ( ) 4 T-Handle (for Reamers and Drivers) ( ) 5 Humeral Head Cutting Guide ( ) 6 Humeral Head Cutting Guide Fingers (2 each) ( ) 7 Straight Driver ( ) 8 Wrench ( ) 9 Offset Head Provisional Set ( )* Middle Tray 10 Head Distractor ( ) 11 Slaphammer ( ) 12 Provisional Capture Pins ( ) 13 Humeral Head Pusher ( ) 14 Offset Humeral Head Inserter ( )* 15 Grooved Pin Inserter/Extractor ( ) Bigliani/Flatow 17/18mm Humeral Instrument Set ( ) (Not shown) Intramedullary Reamers ( /018-00) * Not included in the Bigliani/Flatow Humeral General Instrument Set.

20 18 Case Layouts Bigliani-Flatow Humeral Instrument Set ( ), cont. Instruments listed below will be used for this Trabecular Metal Humeral Stem Surgical Technique Bottom Tray Standard Head Provisional Set ( )* Optional Set, Expanded Humeral Head Provisionals Expanded Head Provisional Set ( ) The following sets are not included in Bigliani/Flatow Humeral General Instrument set but can be ordered separately using the following set numbers. Bigliani/Flatow 17/18 Humeral Instrument Set ( ) Offset Head Instrument Set ( ) Offset Head Provisional Set ( ) Standard Head Provisional Set ( ) Expanded Head Provisional Set ( ) * Not included in the Bigliani/Flatow Humeral General Instrument Set.

21 19

22 20

23 21

24 Contact your Zimmer representative or visit us at +H /$050830R1L06Z Rev.1 5ML Printed in USA 2005, 2006 Zimmer, Inc.

Zimmer Trabecular Metal Reverse Shoulder System

Zimmer Trabecular Metal Reverse Shoulder System Zimmer Trabecular Metal Reverse Shoulder System Surgical Technique Evolution Meets Revolution Trabecular Metal Reverse Shoulder System Surgical Technique Developed in conjunction with Louis Bigliani,

Læs mere

Zimmer Trabecular Metal Reverse Shoulder System

Zimmer Trabecular Metal Reverse Shoulder System Zimmer Trabecular Metal Reverse Shoulder System Surgical Technique Evolution Meets Revolution Trabecular Metal Reverse Shoulder System Surgical Technique Developed in conjunction with Louis Bigliani,

Læs mere

frame bracket Ford & Dodge

frame bracket Ford & Dodge , Rev 3 02/19 frame bracket 8552005 Ford & Dodge ITEM PART # QTY DESCRIPTION 1 00083 8 NUT,.50NC HEX 2 00084 8 WASHER,.50 LOCK 3 14189-76 2 FRAME BRACKET 4 14194-76 1 411AL FRAME BRACKET PASSENGER SIDE

Læs mere

Assembly Instructions. ROLZ-2 Portable AV/Conference Center

Assembly Instructions. ROLZ-2 Portable AV/Conference Center 1 Assembly Instructions ROLZ-2 Portable AV/Conference Center Rolz-2 Portable AV/Conference Center Part Drawing Description Qty Part Drawing Description Qty Hardware List A 1 ½ Flat Head Screw 2 EA P-1

Læs mere

INSTALLATION INSTRUCTIONS STILLEN FRONT BRAKE COOLING DUCTS NISSAN 370Z P/N /308960!

INSTALLATION INSTRUCTIONS STILLEN FRONT BRAKE COOLING DUCTS NISSAN 370Z P/N /308960! Materials supplied: 1. (10) Zip Ties 2. (4) Hose Clamps 3. (2) Brake Duct Hose 4. (2) Brake Shields 5. (2) Front Brake Ducts ( Stock Fascia Only ) 6. (2) Washers 1 OD ( Stock Fascia Only ) 7. (8) Shims

Læs mere

ROTERENDE TABURET 360 GRADER MED HYL Brugsanvisning. ROTATING SHOWER STOOL WITH TRAY Installation Manual. Size: 148 x 210 mm 105g copper paper

ROTERENDE TABURET 360 GRADER MED HYL Brugsanvisning. ROTATING SHOWER STOOL WITH TRAY Installation Manual. Size: 148 x 210 mm 105g copper paper Size: 148 x 210 mm 105g copper paper ROTERENDE TABURET 360 GRADER MED HYL Brugsanvisning ROTATING SHOWER STOOL WITH TRAY Installation Manual Model. 10853 1. Fjern emballagen. 2. Taburettens ben samles

Læs mere

DAY HUNTER KIT ASSEMBLY INSTRUCTIONS

DAY HUNTER KIT ASSEMBLY INSTRUCTIONS DAY HUNTER KIT ASSEMBLY INSTRUCTIONS Attach the Shoulder Harness to the Frame 1. Pass the Upper Harness Attachment Straps (Diagram 1.) through the attachment points located inboard on the upper portion

Læs mere

DANSK INSTALLATIONSVEJLEDNING VLMT500 ADVARSEL!

DANSK INSTALLATIONSVEJLEDNING VLMT500 ADVARSEL! DANSK INSTALLATIONSVEJLEDNING VLMT500 Udpakningsinstruktioner Åben indpakningen forsigtigt og læg indholdet på et stykke pap eller en anden beskyttende overflade for at undgå beskadigelse. Kontroller at

Læs mere

Læs vejledningen godt igennem, før du begynder at samle vuggen. Please read the instruction carefully before you start.

Læs vejledningen godt igennem, før du begynder at samle vuggen. Please read the instruction carefully before you start. 00 Samlevejledning på Vugge ssembly instruction for the cradle Læs vejledningen godt igennem, før du begynder at samle vuggen. Please read the instruction carefully before you start. www.oliverfurniture.dk

Læs mere

SAMLEVEJLEDNINGER / COLLECTION GUIDES

SAMLEVEJLEDNINGER / COLLECTION GUIDES SAMLEVEJLEDNINGER / COLLECTION GUIDES INDHOLDSFORTEGNELSE GENERELT 1 MONTERINGSHULLER 3 ANGLE BORDBEN 5 PIN BORDBEN 9 LINK U - BEN 11 CROSS BUKKE 13 INDEX GENERAL 2 MOUNTING SPOTS 4 ANGLE TABLE LEGS 6

Læs mere

Brug sømbrættet til at lave sjove figurer. Lav fx: Få de andre til at gætte, hvad du har lavet. Use the nail board to make funny shapes.

Brug sømbrættet til at lave sjove figurer. Lav fx: Få de andre til at gætte, hvad du har lavet. Use the nail board to make funny shapes. Brug sømbrættet til at lave sjove figurer. Lav f: Et dannebrogsflag Et hus med tag, vinduer og dør En fugl En bil En blomst Få de andre til at gætte, hvad du har lavet. Use the nail board to make funn

Læs mere

Brugsanvisning. Installation Manual

Brugsanvisning. Installation Manual Manual size: 148 x 210 mm 175g copper paper(铜版纸印刷) UNIVERSAL BIL TAGBAGAGEBÆRER Brugsanvisning UNIVERSAL CAR ROOF RACK Installation Manual Model no. 10889 Tak fordi du valgte dette produkt, som vi håber

Læs mere

Samlevejledning til tremmeseng 70 x 140 Assembly instruction for cot 70 x 140

Samlevejledning til tremmeseng 70 x 140 Assembly instruction for cot 70 x 140 Samlevejledning til tremmeseng 70 x 140 Assembly instruction for cot 70 x 140 Læs vejledningen godt igennem før du begynder. Read the assembly instruction carefully before you start. OLIVER FURNITURE /

Læs mere

Project Step 7. Behavioral modeling of a dual ported register set. 1/8/ L11 Project Step 5 Copyright Joanne DeGroat, ECE, OSU 1

Project Step 7. Behavioral modeling of a dual ported register set. 1/8/ L11 Project Step 5 Copyright Joanne DeGroat, ECE, OSU 1 Project Step 7 Behavioral modeling of a dual ported register set. Copyright 2006 - Joanne DeGroat, ECE, OSU 1 The register set Register set specifications 16 dual ported registers each with 16- bit words

Læs mere

VEDLIGEHOLDELSE AF SENGE

VEDLIGEHOLDELSE AF SENGE DK VEDLIGEHOLDELSE AF SENGE VEDLIGEHOLDELSE AF SENGE Sengen er typisk det møbel i hjemmet som bruges i flest timer gennem døgnet. Det betyder at sengen udsættes for et stort slid, og det er derfor vigtigt

Læs mere

Portal Registration. Check Junk Mail for activation . 1 Click the hyperlink to take you back to the portal to confirm your registration

Portal Registration. Check Junk Mail for activation  . 1 Click the hyperlink to take you back to the portal to confirm your registration Portal Registration Step 1 Provide the necessary information to create your user. Note: First Name, Last Name and Email have to match exactly to your profile in the Membership system. Step 2 Click on the

Læs mere

Montage bjælkeklipper BM 5001R Art. No. 112870. Assembly scythe mower BM 5001R Art. No. 112870

Montage bjælkeklipper BM 5001R Art. No. 112870. Assembly scythe mower BM 5001R Art. No. 112870 Montage bjælkeklipper BM 5001R Art. No. 112870 Assembly scythe mower BM 5001R Art. No. 112870 Løsdele pose pakket, afdækninger, skaftkonsol, skaft højre og venstre. Lose parts plastic bag, covers, handle

Læs mere

Daglig huskeliste Daily checklist

Daglig huskeliste Daily checklist Daglig huskeliste Daily checklist Quick release er spændt Nakkestøtte korrekt højde Fodskåle korrekt højde Fodremme spændt Tjek jævnligt bolte og skruer for efterspænding Quick release locked Headrest

Læs mere

Daglig huskeliste Daily checklist

Daglig huskeliste Daily checklist Daglig huskeliste Daily checklist Quick release er spændt Nakkestøtte korrekt højde Selen er spændt og justeret korrekt Fodskåle korrekt højde Fodremme spændt Tjek jævnligt bolte og skruer for efterspænding

Læs mere

Podia samlevejledning

Podia samlevejledning Montering af Podia. Assembly of Podia. 1 af 12 Stykliste. Podia er bygget op omkring en Multireol (9 rums) og en Amfi trappe. Dertil består den af en bundplade, to balustre, to afskærmninger, tre madrasser

Læs mere

Black Jack --- Review. Spring 2012

Black Jack --- Review. Spring 2012 Black Jack --- Review Spring 2012 Simulation Simulation can solve real-world problems by modeling realworld processes to provide otherwise unobtainable information. Computer simulation is used to predict

Læs mere

Help / Hjælp

Help / Hjælp Home page Lisa & Petur www.lisapetur.dk Help / Hjælp Help / Hjælp General The purpose of our Homepage is to allow external access to pictures and videos taken/made by the Gunnarsson family. The Association

Læs mere

frame bracket Dodge Ram x2 & 4x4 (Includes Mega Cab) (6-1/2 & 8 Boxes)

frame bracket Dodge Ram x2 & 4x4 (Includes Mega Cab) (6-1/2 & 8 Boxes) , Rev 4 03/19 frame bracket 8551006 Dodge Ram 3500 4x2 & 4x4 (Includes Mega Cab) (6-1/2 & 8 Boxes) ITEM PART # QTY DESCRIPTION 1 00248 4 WASHER,.625 SPRING LOCK 2 00291 4 NUT,.625NC HEX 3 00477 4 WASHER,.625

Læs mere

how to save excel as pdf

how to save excel as pdf 1 how to save excel as pdf This guide will show you how to save your Excel workbook as PDF files. Before you do so, you may want to copy several sheets from several documents into one document. To do so,

Læs mere

Sikkerhedsvejledning

Sikkerhedsvejledning 11-01-2018 2 Sikkerhedsvejledning VIGTIGT! Venligst læs disse instruktioner inden sengen samles og tages i brug Tjek at alle dele og komponenter er til stede som angivet i vejledningen Fjern alle beslagsdele

Læs mere

Locked plates use and abuse

Locked plates use and abuse Locked plates use and abuse Anders Jordy Traumesektoren, Kolding Sygehus AO advanced principles Middelfart, april 2016 Learning outcomes Compare indications for using locked and nonlocked plates. Identify

Læs mere

User Manual for LTC IGNOU

User Manual for LTC IGNOU User Manual for LTC IGNOU 1 LTC (Leave Travel Concession) Navigation: Portal Launch HCM Application Self Service LTC Self Service 1. LTC Advance/Intimation Navigation: Launch HCM Application Self Service

Læs mere

DET KONGELIGE BIBLIOTEK NATIONALBIBLIOTEK OG KØBENHAVNS UNIVERSITETS- BIBLIOTEK. Index

DET KONGELIGE BIBLIOTEK NATIONALBIBLIOTEK OG KØBENHAVNS UNIVERSITETS- BIBLIOTEK. Index DET KONGELIGE Index Download driver... 2 Find the Windows 7 version.... 2 Download the Windows Vista driver.... 4 Extract driver... 5 Windows Vista installation of a printer.... 7 Side 1 af 12 DET KONGELIGE

Læs mere

Assembly Guide Monteringsvejledning. 60/30 - wood end panels

Assembly Guide Monteringsvejledning. 60/30 - wood end panels Assembly Guide Monteringsvejledning 60/30 - wood end panels Wood end panels 1. When installing wood end panels, insert the top fittings into the upper crossbar slots and place the Z brackets over the foot

Læs mere

Privat-, statslig- eller regional institution m.v. Andet Added Bekaempelsesudfoerende: string No Label: Bekæmpelsesudførende

Privat-, statslig- eller regional institution m.v. Andet Added Bekaempelsesudfoerende: string No Label: Bekæmpelsesudførende Changes for Rottedatabasen Web Service The coming version of Rottedatabasen Web Service will have several changes some of them breaking for the exposed methods. These changes and the business logic behind

Læs mere

Daglig huskeliste Daily checklist

Daglig huskeliste Daily checklist Daglig huskeliste Daily checklist Quick release er spændt Nakkestøtte korrekt højde Fodskåle korrekte højde Fodremme spændt Tjek jævnligt bolte og skruer for efterspænding Quick release locked Head rest

Læs mere

Resource types R 1 1, R 2 2,..., R m CPU cycles, memory space, files, I/O devices Each resource type R i has W i instances.

Resource types R 1 1, R 2 2,..., R m CPU cycles, memory space, files, I/O devices Each resource type R i has W i instances. System Model Resource types R 1 1, R 2 2,..., R m CPU cycles, memory space, files, I/O devices Each resource type R i has W i instances. Each process utilizes a resource as follows: request use e.g., request

Læs mere

- The knowledge to make a difference

- The knowledge to make a difference - The knowledge to make a difference TILLYKKE MED DIT NYE AKVARIUM Denne vejledning vil hjælpe dig let gennem opstilling og samling af dit nye MOVE akvarium. Vi anbefaler du læser vejledningen grundigt

Læs mere

LUL s Flower Power Vest dansk version

LUL s Flower Power Vest dansk version LUL s Flower Power Vest dansk version Brug restgarn i bomuld, bomuld/acryl, uld etc. 170-220 m/50 g One size. Passer str S-M. Brug større hæklenål hvis der ønskes en større størrelse. Hæklenål 3½ mm. 12

Læs mere

Frame System Part Numbers

Frame System Part Numbers 52 FRAMES Frame System Part Numbers Square Corner Part Numbers Round Corner Part Numbers White Black Almond Gray Brown Navy Taupe Black Almond Gray Brown Sizes Insert (not included) 2 x 4 1 59 / 64 x 3

Læs mere

Freefly B-Række Regler

Freefly B-Række Regler Freefly B-Række Regler Freefly B-Rækken er skabt til at imødekomme både nye og erfarende freeflyere, og præsentere dem for konkurrence elementet. Der konkurreres efter FAI regler, men der forekommer dog

Læs mere

Vores mange brugere på musskema.dk er rigtig gode til at komme med kvalificerede ønsker og behov.

Vores mange brugere på musskema.dk er rigtig gode til at komme med kvalificerede ønsker og behov. På dansk/in Danish: Aarhus d. 10. januar 2013/ the 10 th of January 2013 Kære alle Chefer i MUS-regi! Vores mange brugere på musskema.dk er rigtig gode til at komme med kvalificerede ønsker og behov. Og

Læs mere

Montering af læsseudstyr Mounting of Loading Equipment. SupraVac 2000

Montering af læsseudstyr Mounting of Loading Equipment. SupraVac 2000 Montering af læsseudstyr Mounting of Loading Equipment SupraVac 2000 DK Montering af læsseudstyr på SupraVac 2000 Det er vigtigt, at læsseudstyret monteres og justeres som angivet nedenfor. Forkert justering

Læs mere

Before you begin...2. Part 1: Document Setup...3. Part 2: Master Pages Part 3: Page Numbering...5. Part 4: Texts and Frames...

Before you begin...2. Part 1: Document Setup...3. Part 2: Master Pages Part 3: Page Numbering...5. Part 4: Texts and Frames... InDesign Basics Before you begin...................2 Part 1: Document Setup................3 Part 2: Master Pages................ 4 Part 3: Page Numbering...............5 Part 4: Texts and Frames...............6

Læs mere

Boligsøgning / Search for accommodation!

Boligsøgning / Search for accommodation! Boligsøgning / Search for accommodation! For at guide dig frem til den rigtige vejledning, skal du lige svare på et par spørgsmål: To make sure you are using the correct guide for applying you must answer

Læs mere

Hahn KT-EV / KT-EN For entrance and side entrance doors

Hahn KT-EV / KT-EN For entrance and side entrance doors Hahn KT-EV / KT-EN For entrance and side entrance doors n For all common upstand dimensions from 5 to mm Hahn KT-EN Universal hinge with upstand fastening for entrance and side entrance doors Properties

Læs mere

IBM Network Station Manager. esuite 1.5 / NSM Integration. IBM Network Computer Division. tdc - 02/08/99 lotusnsm.prz Page 1

IBM Network Station Manager. esuite 1.5 / NSM Integration. IBM Network Computer Division. tdc - 02/08/99 lotusnsm.prz Page 1 IBM Network Station Manager esuite 1.5 / NSM Integration IBM Network Computer Division tdc - 02/08/99 lotusnsm.prz Page 1 New esuite Settings in NSM The Lotus esuite Workplace administration option is

Læs mere

Grundindstilling C D. du derimod er kraftigt bygget skal dynamikken strammes. B - Højden på stolen skal være så begge fødder kan hvile fladt på gulvet

Grundindstilling C D. du derimod er kraftigt bygget skal dynamikken strammes. B - Højden på stolen skal være så begge fødder kan hvile fladt på gulvet Grundinlling Når du sætter dig på kontorstn første gang inlles højde, sædedybde, siddevinkel, vægtdynamik og ryghøjde, så stn passer l din højde og vægt. A - Vægtdynamikken styrer den kraft du skal bruge

Læs mere

Info og krav til grupper med motorkøjetøjer

Info og krav til grupper med motorkøjetøjer Info og krav til grupper med motorkøjetøjer (English version, see page 4) GENERELT - FOR ALLE TYPER KØRETØJER ØJER GODT MILJØ FOR ALLE Vi ønsker at paraden er en god oplevelse for alle deltagere og tilskuere,

Læs mere

SAF Brake Cylinders for disc brakes. Installation and Service Guide

SAF Brake Cylinders for disc brakes. Installation and Service Guide SAF Brake Cylinders for disc brakes Contents Contents... 1 Safety Information... 2 Installation of the SAF Brake Cylinders... 3 Installation of the Single Diaphragm Cylinder... 3 Installation of the Double

Læs mere

Montage bjælkeklipper BM 870 III Art. No / BM 875 III Art. No

Montage bjælkeklipper BM 870 III Art. No / BM 875 III Art. No Montage bjælkeklipper BM 870 III Art. No. 112871 / BM 875 III Art. No. 112872 Assembly scythe mower BM 870 III Art. No. 112871 / BM 875 III Art. No. 112872 Motor og driv enhed. Engine and drive unit. Løsdele

Læs mere

TM4 Central Station. User Manual / brugervejledning K2070-EU. Tel Fax

TM4 Central Station. User Manual / brugervejledning K2070-EU. Tel Fax TM4 Central Station User Manual / brugervejledning K2070-EU STT Condigi A/S Niels Bohrs Vej 42, Stilling 8660 Skanderborg Denmark Tel. +45 87 93 50 00 Fax. +45 87 93 50 10 info@sttcondigi.com www.sttcondigi.com

Læs mere

Bilag. Resume. Side 1 af 12

Bilag. Resume. Side 1 af 12 Bilag Resume I denne opgave, lægges der fokus på unge og ensomhed gennem sociale medier. Vi har i denne opgave valgt at benytte Facebook som det sociale medie vi ligger fokus på, da det er det største

Læs mere

Shoulder Terminology. Common Shoulder Problems. Sternoclavicular Joint. Acromioclavicular Joint 12/1/2007

Shoulder Terminology. Common Shoulder Problems. Sternoclavicular Joint. Acromioclavicular Joint 12/1/2007 Shoulder Terminology Common Shoulder Problems C. Benjamin Ma, M.D. Assistant Professor in Residence UCSF Department of Orthopaedic Surgery Sports Medicine and Shoulder Complex structural unit 4 articulations

Læs mere

MS-H280-Pro Magnetic Stirrer

MS-H280-Pro Magnetic Stirrer MS-H280-Pro Magnetic Stirrer www..com Copyright: No part of this manual may be reproduced or transmitted without prior written permission of. VERSION201407 CONTENTS Chapter 1: Working Principle... 3 1

Læs mere

DIVAR VIGTIGT! / IMPORTANT! MÅL / DIMENSIONS. The DIVAR wall lamp comes standard. with 2.4 m braided cord and a plug in power supply (EU or UK).

DIVAR VIGTIGT! / IMPORTANT! MÅL / DIMENSIONS. The DIVAR wall lamp comes standard. with 2.4 m braided cord and a plug in power supply (EU or UK). DIVAR VIGTIGT! / IMPORTANT! VIGTIGT læs vores anvisninger før du bruger produktet. Har du problemer med den elektriske installation, skal du kontakte en elektriker. Sørg for at altid slukke for strømmen

Læs mere

Skidding System. Challenge Us

Skidding System. Challenge Us Skidding System n Malm Orstads cutting edge Engineering department designs and fabricates tailor made skidding systems for all kinds of enviroments. Our skidding systems are amongst the most efficient

Læs mere

DANSK / ENGLISH DS PRO PROJEKTORBESLAG 180 CM MANUAL DS PRO PROJECTOR BRACKET 180 CM OWNERS MANUAL

DANSK / ENGLISH DS PRO PROJEKTORBESLAG 180 CM MANUAL DS PRO PROJECTOR BRACKET 180 CM OWNERS MANUAL DANSK / ENGLISH DANSK SIDE 1 DS Pro PRO projektorbeslag PROJEKTORBESLAG 180 cm 180 CM Tillykke med dit nye DS Pro projektorbeslag 180 cm. For at opnå det bedste resultat bedes du læse denne manual og udelukkende

Læs mere

CART MULTITEK CART MULTITEK CART. The MultiTek Cart

CART MULTITEK CART MULTITEK CART. The MultiTek Cart CART INDEX PAGE(S) The MultiTek Cart 180-181 180 ROUSSEAUMETAL.COM INFO@ROUSSEAUMETAL.COM CART THE ROUSSEAU DIFFERENCE LOCKABLE COVER Opens 90 for unrestricted access to the shelf COMFORTABLE AND ERGONOMIC

Læs mere

Manual Transmission Remove and Install (2,0 DOHC 8V Engine) ( ) Remove

Manual Transmission Remove and Install (2,0 DOHC 8V Engine) ( ) Remove Manual Transmission Remove and Install (,0 DOHC 8V Engine) (6 4 0) Workshop Equipment Transmission jack Materials Brake fluid (Super Dot 4) ESD-M6C57-A Remove. Standard preparatory measures: Make a note

Læs mere

Aktivering af Survey funktionalitet

Aktivering af Survey funktionalitet Surveys i REDCap REDCap gør det muligt at eksponere ét eller flere instrumenter som et survey (spørgeskema) som derefter kan udfyldes direkte af patienten eller forsøgspersonen over internettet. Dette

Læs mere

Monteringsvejledning / Mounting instructions. Chameleon betræk / Chameleon cover system

Monteringsvejledning / Mounting instructions. Chameleon betræk / Chameleon cover system Monteringsvejledning / Mounting instructions Chameleon betræk / Chameleon cover system Monteringsvejledning / Mounting instructions Bred presenningsbunden ud på gulvet. 1. Place the bottom of the tarpaulin

Læs mere

On the complexity of drawing trees nicely: corrigendum

On the complexity of drawing trees nicely: corrigendum Acta Informatica 40, 603 607 (2004) Digital Object Identifier (DOI) 10.1007/s00236-004-0138-y On the complexity of drawing trees nicely: corrigendum Thorsten Akkerman, Christoph Buchheim, Michael Jünger,

Læs mere

Engelsk. Niveau D. De Merkantile Erhvervsuddannelser September Casebaseret eksamen. og

Engelsk. Niveau D. De Merkantile Erhvervsuddannelser September Casebaseret eksamen.  og 052431_EngelskD 08/09/05 13:29 Side 1 De Merkantile Erhvervsuddannelser September 2005 Side 1 af 4 sider Casebaseret eksamen Engelsk Niveau D www.jysk.dk og www.jysk.com Indhold: Opgave 1 Presentation

Læs mere

DANSK INSTALLATIONSVEJLEDNING VLMC101-H ADVARSEL!

DANSK INSTALLATIONSVEJLEDNING VLMC101-H ADVARSEL! DANSK INSTALLATIONSVEJLEDNING VLMC101-H Udpakningsinstruktioner Åben indpakningen forsigtigt og læg indholdet på et stykke pap eller en anden beskyttende overflade for at undgå beskadigelse. Kontroller

Læs mere

Userguide. NN Markedsdata. for. Microsoft Dynamics CRM 2011. v. 1.0

Userguide. NN Markedsdata. for. Microsoft Dynamics CRM 2011. v. 1.0 Userguide NN Markedsdata for Microsoft Dynamics CRM 2011 v. 1.0 NN Markedsdata www. Introduction Navne & Numre Web Services for Microsoft Dynamics CRM hereafter termed NN-DynCRM enable integration to Microsoft

Læs mere

Financial Literacy among 5-7 years old children

Financial Literacy among 5-7 years old children Financial Literacy among 5-7 years old children -based on a market research survey among the parents in Denmark, Sweden, Norway, Finland, Northern Ireland and Republic of Ireland Page 1 Purpose of the

Læs mere

Shooting tethered med Canon EOS-D i Capture One Pro. Shooting tethered i Capture One Pro 6.4 & 7.0 på MAC OS-X 10.7.5 & 10.8

Shooting tethered med Canon EOS-D i Capture One Pro. Shooting tethered i Capture One Pro 6.4 & 7.0 på MAC OS-X 10.7.5 & 10.8 Shooting tethered med Canon EOS-D i Capture One Pro Shooting tethered i Capture One Pro 6.4 & 7.0 på MAC OS-X 10.7.5 & 10.8 For Canon EOS-D ejere der fotograferer Shooting tethered med EOS-Utility eller

Læs mere

QUICK START Updated:

QUICK START Updated: QUICK START Updated: 24.08.2018 For at komme hurtigt og godt igang med dine nye Webstech produkter, anbefales at du downloader den senest opdaterede QuickStart fra vores hjemmeside: In order to get started

Læs mere

DANSK INSTALLATIONSVEJLEDNING VLMW2355A ADVARSEL! VESA Standarder: 100x100, 200x100, 200x200, Op til 35 kg. 300x300, 400x200 og 400x400

DANSK INSTALLATIONSVEJLEDNING VLMW2355A ADVARSEL! VESA Standarder: 100x100, 200x100, 200x200, Op til 35 kg. 300x300, 400x200 og 400x400 DANSK INSTALLATIONSEJLEDNING LMW2355A ESA Standarder: ægt: 100x100, 200x100, 200x200, Op til 35 kg. 300x300, 400x200 og 400x400 Udpakningsinstruktioner Åben indpakningen forsigtigt og læg indholdet på

Læs mere

ATEX direktivet. Vedligeholdelse af ATEX certifikater mv. Steen Christensen stec@teknologisk.dk www.atexdirektivet.

ATEX direktivet. Vedligeholdelse af ATEX certifikater mv. Steen Christensen stec@teknologisk.dk www.atexdirektivet. ATEX direktivet Vedligeholdelse af ATEX certifikater mv. Steen Christensen stec@teknologisk.dk www.atexdirektivet.dk tlf: 7220 2693 Vedligeholdelse af Certifikater / tekniske dossier / overensstemmelseserklæringen.

Læs mere

Hahn KT-EV / KT-EN. For front and side entry doors. n For all common upstand dimensions from 15 to 23 mm

Hahn KT-EV / KT-EN. For front and side entry doors. n For all common upstand dimensions from 15 to 23 mm Hahn KT-EV / KT-EN For front and side entry doors n For all common upstand dimensions from 15 to 3 mm Hahn KT-EN Universal hinge with upstand fastening option for front and side entry doors Features n

Læs mere

Engelsk. Niveau C. De Merkantile Erhvervsuddannelser September 2005. Casebaseret eksamen. www.jysk.dk og www.jysk.com.

Engelsk. Niveau C. De Merkantile Erhvervsuddannelser September 2005. Casebaseret eksamen. www.jysk.dk og www.jysk.com. 052430_EngelskC 08/09/05 13:29 Side 1 De Merkantile Erhvervsuddannelser September 2005 Side 1 af 4 sider Casebaseret eksamen Engelsk Niveau C www.jysk.dk og www.jysk.com Indhold: Opgave 1 Presentation

Læs mere

Unitel EDI MT940 June 2010. Based on: SWIFT Standards - Category 9 MT940 Customer Statement Message (January 2004)

Unitel EDI MT940 June 2010. Based on: SWIFT Standards - Category 9 MT940 Customer Statement Message (January 2004) Unitel EDI MT940 June 2010 Based on: SWIFT Standards - Category 9 MT940 Customer Statement Message (January 2004) Contents 1. Introduction...3 2. General...3 3. Description of the MT940 message...3 3.1.

Læs mere

QUICK START Updated: 18. Febr. 2014

QUICK START Updated: 18. Febr. 2014 QUICK START Updated: 18. Febr. 2014 For at komme hurtigt og godt igang med dine nye Webstech produkter, anbefales at du downloader den senest opdaterede QuickStart fra vores hjemmeside: In order to get

Læs mere

Bookingmuligheder for professionelle brugere i Dansehallerne 2015-16

Bookingmuligheder for professionelle brugere i Dansehallerne 2015-16 Bookingmuligheder for professionelle brugere i Dansehallerne 2015-16 Modtager man økonomisk støtte til et danseprojekt, har en premieredato og er professionel bruger af Dansehallerne har man mulighed for

Læs mere

Status på det trådløse netværk

Status på det trådløse netværk Status på det trådløse netværk Der er stadig problemer med det trådløse netværk, se status her: http://driftstatus.sdu.dk/?f=&antal=200&driftid=1671#1671 IT-service arbejder stadig med at løse problemerne

Læs mere

Generalized Probit Model in Design of Dose Finding Experiments. Yuehui Wu Valerii V. Fedorov RSU, GlaxoSmithKline, US

Generalized Probit Model in Design of Dose Finding Experiments. Yuehui Wu Valerii V. Fedorov RSU, GlaxoSmithKline, US Generalized Probit Model in Design of Dose Finding Experiments Yuehui Wu Valerii V. Fedorov RSU, GlaxoSmithKline, US Outline Motivation Generalized probit model Utility function Locally optimal designs

Læs mere

Vina Nguyen HSSP July 13, 2008

Vina Nguyen HSSP July 13, 2008 Vina Nguyen HSSP July 13, 2008 1 What does it mean if sets A, B, C are a partition of set D? 2 How do you calculate P(A B) using the formula for conditional probability? 3 What is the difference between

Læs mere

Linear Programming ١ C H A P T E R 2

Linear Programming ١ C H A P T E R 2 Linear Programming ١ C H A P T E R 2 Problem Formulation Problem formulation or modeling is the process of translating a verbal statement of a problem into a mathematical statement. The Guidelines of formulation

Læs mere

Gusset Plate Connections in Tension

Gusset Plate Connections in Tension Gusset Plate Connections in Tension Jakob Schmidt Olsen BSc Thesis Department of Civil Engineering 2014 DTU Civil Engineering June 2014 i Preface This project is a BSc project credited 20 ECTS points written

Læs mere

Mandara. PebbleCreek. Tradition Series. 1,884 sq. ft robson.com. Exterior Design A. Exterior Design B.

Mandara. PebbleCreek. Tradition Series. 1,884 sq. ft robson.com. Exterior Design A. Exterior Design B. Mandara 1,884 sq. ft. Tradition Series Exterior Design A Exterior Design B Exterior Design C Exterior Design D 623.935.6700 robson.com Tradition OPTIONS Series Exterior Design A w/opt. Golf Cart Garage

Læs mere

E-PAD Bluetooth hængelås E-PAD Bluetooth padlock E-PAD Bluetooth Vorhängeschloss

E-PAD Bluetooth hængelås E-PAD Bluetooth padlock E-PAD Bluetooth Vorhängeschloss E-PAD Bluetooth hængelås E-PAD Bluetooth padlock E-PAD Bluetooth Vorhängeschloss Brugervejledning (side 2-6) Userguide (page 7-11) Bedienungsanleitung 1 - Hvordan forbinder du din E-PAD hængelås med din

Læs mere

Remember the Ship, Additional Work

Remember the Ship, Additional Work 51 (104) Remember the Ship, Additional Work Remember the Ship Crosswords Across 3 A prejudiced person who is intolerant of any opinions differing from his own (5) 4 Another word for language (6) 6 The

Læs mere

DEUTSCH. Electric

DEUTSCH. Electric DEUTSCH D Electric 8-00-0 S SVENSKA 5 8 6 9 5 5.. SVENSKA S = 0 mm = 0 mm = 0 mm = 50 mm 0 mm 60 mm A C B.. 5.. 6. S SVENSKA 8. 9. INFORMATION OM STRØMFORBRUG Flere og flere maskiner, som f.eks. plæneklippere,

Læs mere

Richter 2013 Presentation Mentor: Professor Evans Philosophy Department Taylor Henderson May 31, 2013

Richter 2013 Presentation Mentor: Professor Evans Philosophy Department Taylor Henderson May 31, 2013 Richter 2013 Presentation Mentor: Professor Evans Philosophy Department Taylor Henderson May 31, 2013 OVERVIEW I m working with Professor Evans in the Philosophy Department on his own edition of W.E.B.

Læs mere

DIVAR VIGTIGT! / IMPORTANT! MÅL / DIMENSIONS

DIVAR VIGTIGT! / IMPORTANT! MÅL / DIMENSIONS DIVAR VIGTIGT! / IMPORTANT! VIGTIGT læs vores anvisninger før du bruger produktet. Har du problemer med den elektriske installation, skal du kontakte en elektriker. Sørg for at altid slukke for strømmen

Læs mere

Skriftlig Eksamen Kombinatorik, Sandsynlighed og Randomiserede Algoritmer (DM528)

Skriftlig Eksamen Kombinatorik, Sandsynlighed og Randomiserede Algoritmer (DM528) Skriftlig Eksamen Kombinatorik, Sandsynlighed og Randomiserede Algoritmer (DM58) Institut for Matematik og Datalogi Syddansk Universitet, Odense Torsdag den 1. januar 01 kl. 9 13 Alle sædvanlige hjælpemidler

Læs mere

Trolling Master Bornholm 2015

Trolling Master Bornholm 2015 Trolling Master Bornholm 2015 (English version further down) Sæsonen er ved at komme i omdrejninger. Her er det John Eriksen fra Nexø med 95 cm og en kontrolleret vægt på 11,8 kg fanget på østkysten af

Læs mere

Trolling Master Bornholm 2014

Trolling Master Bornholm 2014 Trolling Master Bornholm 2014 (English version further down) Populært med tidlig færgebooking Booking af færgebilletter til TMB 2014 er populært. Vi har fået en stribe mails fra teams, som har booket,

Læs mere

X M Y. What is mediation? Mediation analysis an introduction. Definition

X M Y. What is mediation? Mediation analysis an introduction. Definition What is mediation? an introduction Ulla Hvidtfeldt Section of Social Medicine - Investigate underlying mechanisms of an association Opening the black box - Strengthen/support the main effect hypothesis

Læs mere

Special VFR. - ved flyvning til mindre flyveplads uden tårnkontrol som ligger indenfor en kontrolzone

Special VFR. - ved flyvning til mindre flyveplads uden tårnkontrol som ligger indenfor en kontrolzone Special VFR - ved flyvning til mindre flyveplads uden tårnkontrol som ligger indenfor en kontrolzone SERA.5005 Visual flight rules (a) Except when operating as a special VFR flight, VFR flights shall be

Læs mere

PARALLELIZATION OF ATTILA SIMULATOR WITH OPENMP MIGUEL ÁNGEL MARTÍNEZ DEL AMOR MINIPROJECT OF TDT24 NTNU

PARALLELIZATION OF ATTILA SIMULATOR WITH OPENMP MIGUEL ÁNGEL MARTÍNEZ DEL AMOR MINIPROJECT OF TDT24 NTNU PARALLELIZATION OF ATTILA SIMULATOR WITH OPENMP MIGUEL ÁNGEL MARTÍNEZ DEL AMOR MINIPROJECT OF TDT24 NTNU OUTLINE INEFFICIENCY OF ATTILA WAYS TO PARALLELIZE LOW COMPATIBILITY IN THE COMPILATION A SOLUTION

Læs mere

Fejemaskine med integreret opsamler Sweeper with integrated collector box MS 920

Fejemaskine med integreret opsamler Sweeper with integrated collector box MS 920 DK GB Betjeningsvejledning User manual Fejemaskine med integreret opsamler Sweeper with integrated collector box MS 920 Texas A/S - Knullen 22 - DK-5260 Odense S - Denmark Version 14.1 Tel. +45 6395 5555

Læs mere

The complete construction for copying a segment, AB, is shown above. Describe each stage of the process.

The complete construction for copying a segment, AB, is shown above. Describe each stage of the process. A a compass, a straightedge, a ruler, patty paper B C A Stage 1 Stage 2 B C D Stage 3 The complete construction for copying a segment, AB, is shown above. Describe each stage of the process. Use a ruler

Læs mere

SYSTEM CADO Design by Poul Cadovius, 1960

SYSTEM CADO Design by Poul Cadovius, 1960 SYSTEM CADO Design by Poul Cadovius, 1960 Montagevejledning (DK) ASSEMBLY INSTRUCTION (ENG) Montagevejledning SYSTEM CADO (DK) SYSTEM CADO kan monteres på mange forskellige vægoverflader. Hvis reolen skal

Læs mere

Bilag 8. TDC technical requirements for approval of splitterfilters and inline filters intended for shared access (ADSL or VDSL over POTS).

Bilag 8. TDC technical requirements for approval of splitterfilters and inline filters intended for shared access (ADSL or VDSL over POTS). Bilag 8. TDC technical requirements for approval of splitters and inline s intended for shared access (ADSL or VDSL over POTS). Dette bilag udgør bilag 8 til det mellem parterne tiltrådte Produkttillæg

Læs mere

Small Autonomous Devices in civil Engineering. Uses and requirements. By Peter H. Møller Rambøll

Small Autonomous Devices in civil Engineering. Uses and requirements. By Peter H. Møller Rambøll Small Autonomous Devices in civil Engineering Uses and requirements By Peter H. Møller Rambøll BACKGROUND My Background 20+ years within evaluation of condition and renovation of concrete structures Last

Læs mere

Montagevejledning / assembly instruction 8884

Montagevejledning / assembly instruction 8884 Montagevejledning / assembly instruction 8884 Klemmeprofil 8884-2010/-2500/-5000 clamping profile 8884-2010/-2500/-5000 Produktet har, i nedhængt tilstand, en bæreevne på 30 kg ved en profillængde på en

Læs mere

3D NASAL VISTA 2.0

3D NASAL VISTA 2.0 USER MANUAL www.nasalsystems.es index index 2 I. System requirements 3 II. Main menu 4 III. Main popup menu 5 IV. Bottom buttons 6-7 V. Other functions/hotkeys 8 2 I. Systems requirements ``Recommended

Læs mere

Topdresser 1800 for Workman 3000/4000 Series

Topdresser 1800 for Workman 3000/4000 Series Form No. Topdresser 1800 for Workman 3000/4000 Series Model No. 44225 90001 and Up Parts Catalog Ordering Replacement Parts To order replacement parts, please supply: the part number, the quantity, and

Læs mere

3D NASAL VISTA TEMPORAL

3D NASAL VISTA TEMPORAL USER MANUAL www.nasalsystems.es index index 2 I. System requirements 3 II. Main menu 4 III. Main popup menu 5 IV. Bottom buttons 6-7 V. Other functions/hotkeys 8 2 I. Systems requirements ``Recommended

Læs mere

Basic statistics for experimental medical researchers

Basic statistics for experimental medical researchers Basic statistics for experimental medical researchers Sample size calculations September 15th 2016 Christian Pipper Department of public health (IFSV) Faculty of Health and Medicinal Science (SUND) E-mail:

Læs mere

Nyhedsmail, december 2013 (scroll down for English version)

Nyhedsmail, december 2013 (scroll down for English version) Nyhedsmail, december 2013 (scroll down for English version) Kære Omdeler Julen venter rundt om hjørnet. Og netop julen er årsagen til, at NORDJYSKE Distributions mange omdelere har ekstra travlt med at

Læs mere

Slot diffusers. Slot diffusers LD-17, LD-18

Slot diffusers. Slot diffusers LD-17, LD-18 LD-17, LD-18 Application LD-17 and LD-18 are designed for supply of cold or warm air in rooms with a height between. m and 4 m. They allow easy setting of air deflectors for different modes of operation

Læs mere