Network Code Development Møde hos Energinet.dk 7. februar 2012
ENTSO-E Network Code - høringsmøde Tidsplan 10.00 10:20 Velkomst og introduktion v/peter Jørgensen 10:20 10.40 Baggrund, proces og jura v/johannes Bruun 10:40 11:00 Sammenhæng, procedurer og tidsplaner for ENTSO-E Network Codes v/lene Egeberg-Gjelstrup 11:00 11:20 Pause 11:20 12:00 Præsentation af ENTSO-E Network Code Requirements Applicable for all Generators v/knud Johansen 12:00 12:20 Sammenhæng med de nuværende DK Tekniske Forskrifter v/søren Friismose Jensen 12:20 13:00 Frokost 13:00 13.20 Præsentation af ENTSO-E portal til afgivelse af høringssvar v/knud Johansen 13:20 14.20 Debat og kommentarer v/kim Behnke 14.20 14:30 Afrunding af dagen v/kim Behnke Ret til ændringer forbeholdes Dok. 8265/12 ENTSO-E Network Code - høringsmøde 2
ENTSO-E European Network of Transmissions System Operators for Electricity Forening stiftet af 41 TSO er fra 34 lande Placeret i Bruxelles Arbejder grundlæggende inden for områder: - Systemdrift - Systemudvikling - Marked - Forskning og udvikling Energinet.dk deltager aktivt i arbejdet i ENTSO-E
ENTSO-E has significant role in delivering European energy and climate change objectives Key activities set out in Regulation 714/2009 (on cross-border electricity trade, part of the 3 rd Internal Energy Market Package) Deliver network codes Deliver network plans European / regional view of system needs ( TYNDP ) Deliver crucial aspects of market integration ( market coupling ) R&D Plan (fully included in EEGI European Electricity Grid Initiative, part of the SET Plan) Through its members deliver the infrastructure to: enable markets to function, secure energy supply, meet climate change objectives through connecting RES 4
Pilot process versus formal process Pilot FWGL Pilot Code Final FWGL Network Code ERGEG ACER ERGEG/ ACER drafting of Framework Guideline consultation consultation ENTSO-E drafting of Pilot Code, informal consultation drafting of Network Code consultation 10/2009 2010 2011 2012 as if Phase (Pilot Phase) Formal Phase 6
Formal Network Code process Working draft publication Start Public consultation Submission Network Code to ACER Pilot Code Final ACER Framework Guidelines & EU invitation letter Stakeholder meetings Workshops Review
Stakeholder interaction Public ENTSO-E workshops May 2010 November 2010 December 2011 (regional workshops) February 2012 National level (TSO initiative) User groups Seminars, Industrial customers IFIEC DSO associations CEDEC Eurelectric DSO Geode Bilateral meetings Manufacturers & Generators EWEA EPIA EUTurbines Eurelectric WG Thermal / VGB
Conclusions The European power system is changing fast and significantly to achieve energy and climate objectives Grid connection codes are urgently needed to enable these policies in order to maintain security of supply at least cost for European citizens ENTSO-E s neutrality and expertise garanties the process Strong involvement of stakeholders, and in particular DSOs, are absolute prerequisites Consultation is ongoing; ENTSO-E is listening in pursuit of the best solutions acceptable by all
ENTSO-E Network Code - høringsmøde Tidsplan 10.00 10:20 Velkomst og introduktion v/peter Jørgensen 10:20 10.40 Baggrund, proces og jura v/johannes Bruun 10:40 11:00 Sammenhæng, procedurer og tidsplaner for ENTSO-E Network Codes v/lene Egeberg-Gjelstrup 11:00 11:20 Pause 11:20 12:00 Præsentation af ENTSO-E Network Code Requirements Applicable for all Generators v/knud Johansen 12:00 12:20 Sammenhæng med de nuværende DK Tekniske Forskrifter v/søren Friismose Jensen 12:20 13:00 Frokost 13:00 13.20 Præsentation af ENTSO-E portal til afgivelse af høringssvar v/knud Johansen 13:20 14.20 Debat og kommentarer v/kim Behnke 14.20 14:30 Afrunding af dagen v/kim Behnke Ret til ændringer forbeholdes Dok. 8265/12