IP01: Permeable befæstelser

Relaterede dokumenter
IP01: Permeable befæstelser

IP01: Permeable befæstelser

Klimatilpasning og Skybrudsplan. Kan det betale sig? Case: Copenhagen and Frederiksberg. Arne Bernt Hasling.

Test af permeable befæstelser på parkeringsplads ved Svanemøllehallen Støvring, Jan

Small Autonomous Devices in civil Engineering. Uses and requirements. By Peter H. Møller Rambøll

Statistical information form the Danish EPC database - use for the building stock model in Denmark

Værktøjer, der kan regne på LAR-elementer

Using SL-RAT to Reduce SSOs

Status for modellering af vand og varmestrømning

Datablad: Nature Impact Roof modul

Anvendelse af vejrradar -Plan A. Lektor Michael R. Rasmussen Institut for Byggeri og Anlæg

FIRE DTU BYG. Performance -Based Design Fully-Developed Fires DTU

Tilpasning af Cityringen til fremtidens klima

Research and Development Centre Research and Development Centre

28 April 2003 Retrospective: Semicore Visit

Beton optager CO 2. Har det betydning for miljøet? Jesper Sand Damtoft. Aalborg Portland Group. Research and Development Centre

Supermarkeder og Smart Grid muligheder for fleksibelt elforbrug

Fremtidens brugerinstallationer for fjernvarmen. Jan Eric Thorsen, Director DHS Application Centre and HEX research, Danfoss Heating

NYC Reservoir System Current Operations December 14, 2010

Trolling Master Bornholm 2014

Erfaringer med afkobling af regnvand på USA s vestkyst

Innovative LAR-metoder til håndtering af mere regnvand og grundvand ved fremtidige klimaændringer. Indlæg på Dansk Vand Konference 2013

Hvordan får vi bugt med det fedmefremmende samfund?

Dias 1. Stockholm. - on the rocks, not stirred, not shaken. Geoteknikerens hverdag 6. november 2014 René Mølgaard Jensen. Sidefod

The Green Power Plant Seahorn Energy

Gør jorden let at bearbejde. Lars J. Munkholm Institut for Agroøkologi Aarhus Universitet

Kort & Matrikelstyrelsen 19. september årgang SØKORTRETTELSER 37 CHART CORRECTIONS. Kort & Matrikelstyrelsen ISSN

Hydromorphological challenges for sediments

Handelsbanken. Lennart Francke, Head of Accounting and Control. UBS Annual Nordic Financial Service Conference August 25, 2005


Nye fjernvarmesystemer. Svend Svendsen DTU BYG

Ideen bag kobling af regnvandshåndtering og vandforsyning, og betydningen for byens landskab

Slot diffusers. Slot diffusers LD-17, LD-18

Managing Muckpile Fragmentation Workshop. Scott G. Giltner

The effects of occupant behaviour on energy consumption in buildings

Kort & Matrikelstyrelsen 12. september årgang SØKORTRETTELSER 36 CHART CORRECTIONS. Kort & Matrikelstyrelsen ISSN

Application of High- resolution LiDAR-derived DEM in Landslide Volume Estimation

ITER International Partnerships - France & Japan -

applies equally to HRT and tibolone this should be made clear by replacing HRT with HRT or tibolone in the tibolone SmPC.

Hvad er Asset Management

Sand ell survey December/November 2009

Linear Programming ١ C H A P T E R 2

Trolling Master Bornholm 2014

To the reader: Information regarding this document

LUL s Flower Power Vest dansk version

Kort & Matrikelstyrelsen 20. juni årgang SØKORTRETTELSER 24 CHART CORRECTIONS. Kort & Matrikelstyrelsen ISSN

Brug og misbrug af CDS-regn til analyse og dimensionering. Karsten Arnbjerg-Nielsen Professor, Urban Water Systems

Basic statistics for experimental medical researchers

Kort & Matrikelstyrelsen 12. juli årgang SØKORTRETTELSER 27 CHART CORRECTIONS. Kort & Matrikelstyrelsen ISSN

Financial Literacy among 5-7 years old children

Kort & Matrikelstyrelsen 30. august årgang CHART CORRECTIONS. Kort & Matrikelstyrelsen ISSN

SKEMA TIL AFRAPPORTERING EVALUERINGSRAPPORT

Tender Package 10 pre-description

Fuldskalaforsøg med permeable belægninger til afledning af regnvand

Alfa-1-antitrysin mangel hos børn. Elisabeth Stenbøg, Afd.læge, PhD Børneafd. A, AUH

Decommissioning Development Project in Esbjerg. Foredrag hos Skibsteknisk Selskab By Peter Blach, Offshore Center Danmark

Kort & Matrikelstyrelsen 11. juli årgang CHART CORRECTIONS. Kort & Matrikelstyrelsen ISSN

Byudvikling, klimaændringer og oversvømmelsesrisiko

MEDLEY CHALLENGE 2016/2017

Past 60 weeks. Prior period. 10 resp 90% probability, Past 60 weeks. Prior period. Max/min. Average,

A multimodel data assimilation framework for hydrology

New Hospital & New Psychiatry Bispebjerg

Næste generation solvarme / 4. Generation Fjernvarme

to register

Kort & Matrikelstyrelsen 2. maj årgang SØKORTRETTELSER 17 CHART CORRECTIONS. Kort & Matrikelstyrelsen ISSN

Impala Platinum 10 Shaft Decline Analyst Visit - 25 October 2002

Trolling Master Bornholm 2012

Infiltrationsforsøg. af permeable belægninger, MiPerStone. for. Midtgaard A/S

IBM Network Station Manager. esuite 1.5 / NSM Integration. IBM Network Computer Division. tdc - 02/08/99 lotusnsm.prz Page 1

INDHOLD / CONTENT BORDE / OFFICE TABLES / STORAGES SHELVES / MIRRORS SIKKERHED / GODKENDELSER / SAFETY / AUTHORISATION

Global carbon cycle studies with LPJ-GUESS

Vina Nguyen HSSP July 13, 2008

AREA TOTALS OECD Composite Leading Indicators. OECD Total. OECD + Major 6 Non Member Countries. Major Five Asia. Major Seven.

Kort & Matrikelstyrelsen 15. august årgang SØKORTRETTELSER 32 CHART CORRECTIONS. Kort & Matrikelstyrelsen ISSN

SØKORTRETTELSER 51-52

Permeable befæstelser hvor går grænsen?

Possibilities for Reuse of Calcium Carbonate Pellets from Drinking Water Softening

DIVAR VIGTIGT! / IMPORTANT! MÅL / DIMENSIONS. The DIVAR wall lamp comes standard. with 2.4 m braided cord and a plug in power supply (EU or UK).

KONTORLEJEMÅL I KREATIVT MILJØ Hillerødgade 30A, 1., 2200 København N Sag (AW)

LAR Løsninger. - permeable afløb og belægninger samt regnbede, bassiner og vandrender. En stærk dansk betonløsning

Statistik for MPH: 7

TALISERING DBDH STRATEGI DIGITALISERING I FJERNVARMESEKTOREN INNOVATIONSTORVET. INVITATION Medlemsmøde SKANDERBORG PARK, 6.

Internationalt uddannelsestilbud

Dias 1. Stockholm. - on the rocks, not stirred, not shaken. Geoteknikerens hverdag 30. oktober 2014 René Mølgaard Jensen. Sidefod

Timetable will be aviable after sep. 5. when the sing up ends. Provicius timetable on the next sites.

Kort & Matrikelstyrelsen 18. oktober årgang SØKORTRETTELSER 41 CHART CORRECTIONS. Kort & Matrikelstyrelsen ISSN

Integreret modellering i Odense. En ny tilgang til udvikling af langsigtede og integrerede spildevands- og regnvandsløsninger

Skalerbare elektrolyse anlæg til produktion af brint i forbindelse med lagring af vedvarende energi

University Medical Center of Princeton David Bodnar Construction Management Senior Thesis

Local Heating Concepts for Power Balancing

Fjerde Generation Fjernvarme

Kort & Matrikelstyrelsen 19. oktober årgang CHART CORRECTIONS. Kort & Matrikelstyrelsen ISSN

Miljøeffektiv teknologi

148 M² LAGER/ARKIV Rahbeks Alle 21, kld., 1801 Frederiksberg C Sag (AW)

Bookingmuligheder for professionelle brugere i Dansehallerne

Trolling Master Bornholm 2014

xrm både en applikation og en ramme for hurtig udvikling af løsninger til strukturet relationshåndtering og understøttelse af forretningsprocesser

Kort & Matrikelstyrelsen 22. marts årgang SØKORTRETTELSER 11 CHART CORRECTIONS. Kort & Matrikelstyrelsen ISSN

Help / Hjælp

Skriftlig Eksamen Kombinatorik, Sandsynlighed og Randomiserede Algoritmer (DM528)

Transkript:

IP01: Permeable befæstelser Senior consultant /PhD-fellow Jan Støvring jls@ign.ku.dk Landscape architecture and Planning Project partners: IBF, NCC, BYGGROS, Stenrand Grusgrav, MJK Elektronik, Rambøll, Midtgaard Granit og Betonvarer, NORRECCO, Nyrup Plast, HOFOR, Københavns Kommune, Others; Teknologisk Institut Test Centre at Svanemøllehallen supported by Hofor and project partners Dias 1

Tests at Svanemøllehallen Stall 3 Stall 2 Dias 2 Stall 1 4.05.2013

04.03.2013

15.03.2013

Tests at Svanemøllehallen Monitoring well Each stall 5 x 5 meter all runoff is directed in to the monitoring well

Experimental stalls 6 5 4 3 2 1 2-8 crushed aggregates 2-5 crushed aggregates crushed aggregates 32-45 + 5-8 Crushed recycled concrete 4-32 Drænstabil Dias 6

Accumulated storm water infiltrated in each stall November 2013 Dias 7

Accumulated storm water infiltrated in each stall Testfelt 1 2 3 4 5 6 September 2013 Nedbør (L) 1515 1515 1515 1515 1515 1515 Nedbør gennem testfelt (L) 1643 1378 1358 1460 1617 - Difference (L) 128-136 -157-55 102 - Afvigelse (%) 8 % -10 % -12 % -4 % 6 % - November 2013 Nedbør (L) 1157 1157 1157 1157 1157 1157 Nedbør gennem testfelt (L) 1056 952 916 975 982 - Difference (L) 101 205 241 182 175 - Afvigelse (%) -9 % -18 % -21 % -16 % - 15 % - December 2013 Nedbør (L) 1464 1464 1464 1464 1464 1464 Nedbør gennem testfelt (L) 1628 1444 1461 1556 1532 - Difference (L) 164 20 3 91 67 - Afvigelse (%) 10 % 1 % 0 % 6 % 4 % - Januar 2014 Nedbør (L) 1545 1545 1545 1545 1545 1545 Nedbør gennem testfelt (L) 1713 1574 1567 1682 1688 - Difference (L) 168 29 22 137 143 - Afvigelse (%) 10 % 2 % 1 % 8 % 8 % - Dias 8

Flow by storm event Stall 1-5 November 27th-28 th 2013 Delayed response when rain after dry period Dias 9

Flow by storm event Stall 1-5 September 15 th 2013 Large vol. by pervious pavers, will probably be smaller today(?) Small vol. by RCA Dias 10

Peak reduction testfelt start (time) slut (time) peak(tid) peak (flow L/10min) peak forskydning (timer:minutter) peak reduktion (Vol) Rain event 15-09-2013 05:50 15-09-2013 03:50 30,626 1 15-09-2013 07:00 15-09-2013 08:30 15-09-2013 07:30 14,036 03:40:00 54% 2 15-09-2013 06:00 15-09-2013 08:20 15-09-2013 07:10 18,652 03:20:00 39% 3 15-09-2013 06:50 15-09-2013 08:20 15-09-2013 07:20 9,326 03:30:00 70% 4 15-09-2013 07:00 15-09-2013 08:40 15-09-2013 07:40 4,522 03:50:00 85% 5 15-09-2013 06:00 15-09-2013 08:20 15-09-2013 07:10 19,028 03:20:00 38% Dias 11

Surface infiltration tests 1400 1200 1000 after 4 Month after 12 Month after 18 Month % reduction Stall 1 302 136 117 61 Stall 2 64 21 11 83 Stall 3 276 76 8 97 Stall 4 529 501 480 9 Stall 5 1144 823 710 38 Stall 6 343 70 39 89 Same toplayer but different base course intensity(µm/s) 800 600 400 after 4 mdr. after 12 mdr. after 18 mdr. 200 0 testfelt 1 testfelt 2 testfelt 3 testfelt 4 testfelt 5 testfelt 6 Cloudburst >15mm/30 min Same toplayer but different base course

Other observations October 14: 90% of joints in stall 6 have weed only 10% in stall 1 has (Same surface). More refilling/maintenance in stall 6 than 1 January 14: When thaw less water on surface by PP Dias 13

Infiltration tests on permeable paving's elsewhere SF-Rima, Lendemosevej 2013 Pavers, Bellinge, 2014 SF Rima, Helenevej, 2014 Permeable Asphalt, Billund, 2012 PICP, VandCenter Syd, 2012 PICP, DANVA, 2011 Granite slaps, Stiholmvej, Birkerød, 2012 Dias 14

2000 1800 1600 1400 1200 1000 800 intensitet (µm/s) Infiltration rate after simulated cleaning Time (tt:mm:ss) Infiltration rate (mm/t) Infiltration rate (µm/s) Lendemosevej, Lions Park Søllerød 00:02:11 1788 497 Helenevej, Frederiksberg 00:21:47 685 190 VandCentre Syd, Odense 00:12:10 662 184 Stilholmsvej, Birkerød 00:02:36 1332 370 DANVA, Skanderborg 00:55:10 122 34 Bellinge, Odense 00:01:13 2683 745 Cargovej, Billund 01:02:00 12 3 10-årshændelse 100-årshændelse før oprens efter oprens 600 400 200 0 Lendemosevej, Lions Park Søllerød Dias 15 Helenevej, Frederiksberg VandCentre Syd, Odense Stilholmsvej, Birkerød DANVA, Skanderborg lokalitet

Resultat fra infiltrationstest sammenlignet med dimensioneringsgivende regnhændelser Lendemosevej, Lions Park Søllerød Helenevej, Frederiksberg Infiltrationsevne (µm/s) 1.000 100 10 Stilholmsvej, Birkerød VandCentre Syd, Odense DANVA, Skanderborg Cargovej, Billund Bellinge, Odense 100-årshændelse 10-årshændelse 5-årshændelse 1 1 10 100 time (min) Dias 16

Dias 17 IGN

Helenevej, cloudburst 31.august-1. sep. 2014 between kl. 21:34 og 03:38 falder der 70 mm nedbør (SVK Landbohøjskolen) dome of visions 2. sep 2014 Dias 18

Helenevej, cloudburst 31.august-1. sep. 2014 start finish duration Massemidtpunkt(tid) Highest waterlevel (mm) regnhændelse 30-08-2014 22:34 7 05:02 64 01:40 Intensity (30min) 01:36 32 02:06 52 00:30 section A 01:42 27 04:24 488 02:42 03:00 77 section B 02:48 8 04:32 427 01:44 03:04 213 section C 02:00 54 03:56 386 01:56 03:14 41 section D 01:40 23 04:34 280 02:54 03:08 27 Dias 19

25. Marts 2014

sewer Crosscutting ditch for 27. Marts 2014

Aprox. 30cm of clay with humus Moraine clay 27. Marts 2014

Råjordsplanum etape E 8% 0% 2% sand(sa) forklaring (SA) 24% grus(gr) 29% 4% moræneler(ml) moræneler med muld(mm) betonstøbning omking kantsten tværgående membran 33% brønde til fjernvarme Dias 23

Volume and water storage capacity of sandy (constructed) layers (SA og GR) diameter [m] radius [m] length porosity Volume [m3] Volume [l] Vol (district heating pipe) 0,125 0,0625 36 0,4415625 441,5625 2 pipes in total 883,125 area [m2] depth [m] porosity Volume [m3] Volume of area around district heating pipe 38,4 0,375 0,3 4,32 4320 3436,875 diameter [m] radius [m] length porosity Volume [m3] Volume [l] Volume of sewer pipe 0,1 0,05 36 0,2826 282,6 area [m2] depth [m] porosity Volume [m3] Volume of area around sewer pipe 11,9 0,8 0,3 2,856 2856 2573,4 Volume of sand pocket (estimate) area [m2] depth [m] porosity Volume [m3] Volume [l] 0,8 0,5 0,3 0,12 120 grus alle area [m2] depth [m] porosity Volume [m3] Volume [l] 8,4 0,2 0,3 0,504 504 Total volume [l] 6634,275 Dias 24

First scenario: Homogenous clay till V(water)=Ksat*Area [m3/d] Total area [m 2 ] Ksat (m/s] Ksat [m/d] 198,2 0,000001 0,0864 17,12448 liter/day 17124,48 Second scenario: Hetergeonous Area sediment type [m 2 ] Ksat [m/s] Ksat [m/d] sand 54,7 5,72429E-05 4,945790217 clay till 65,7 7,74949E-06 0,669555942 mull clay 58,1 7,90212E-06 0,682742859 betonstøbning omking kantsten 16,4 0 0 brønde til fjernvarme 3,3 0 0 198,2 0 V(water)=Ksat*Area [m3/d] liter/day 354,1919104 354191,9104 Difference between two scenarios [m3/d] 337,0674304 in liter/day 337067,4 Largest accumulated water volume (Q) for a 5 year rain event mm l/m2 for etape 1 23,8 23,8 4717,16 Dias 25

M11 27. Marts 2014

M17 M15 M18 M16 3. April 2014

M15 M15 Falling head 0,005 = 5,0 x 10-5 m/s M16 Constant head 0,0016 = 1,6 x 10-5 m/s M17 Constant head 0,0005 = 5,0 x 10-6 m/s 3. April 2014

No troxler 1,2,3,4,5,6 No Density kg/m3 Moisture % 1 1248 27,7 Average Kg/m3 2 1210 31,2 3 1195 29,9 1218 4 1115 44,6 No 7,8,9 5 1149 34,9 6 1209 29,4 1158 7 1425 23,4 8 1489 23,7 9 1647 20 1520 10 1445 26,6 11 1498 23,4 12 1815 1586 No 10,11,12 1370 3. April 2014