Integrity management Setting the Scene
Integrity management The HSSE tablestake LoPC Process safety Equipment Integrity - 20 essentielle elementer CUI - Et eksempel Risk Based Approach - RAM Risk assesment matrix - Et Prioriteringsværktøj
The Tablestake The balanced scorecard: Customers pletfri performance HSE Performance Stakeholders People
Aspekter omkring HSE arbejdet Personlige sikkerhed Process sikkerheden Anekdote: Management has to secure the workplace so the colleagues do not get hurt and can go home at the end of the day to their families in the same conditions as they started. At the same time management has to secure that the workplace remains so the colleagues have a workplace where the can start tomorrow
Integrity management The main issue : LoPC Loss of Primory Containment
Høj-risiko scenarier Process Safety Eksempel fra Kulbrinte industrien Eksempler af Høj-risiko scenarier» H 2 S udslip i procesområdet.» Gassky eksplosion i procesområdet» Gassky eksplosion ved lastning af tankvogn» Gassky eksplosion i LPG kugletank» Gassky eksplosion ved lastning af LPG skib» Stikflammebrand i procesområdet» Overfladebrand i procesområdet» Brand i flydetagstank» Eksplosion i fasttagstank.» Råolie udslip ved lastning af råolie» Massiv jordforurening
The 5 HSSE critical activities for process safety 1. Management of change 2. Equipment integrity 3. Instrument protective functions - cut out systemet 4. Alarm management - operating windows 5. Reliability centered maintenance.
Integrity management The HSSE tablestake LoPC Process safety Equipment Integrity - 20 essentielle elementer CUI - Et eksempel Risk Based Approach - RAM Risk assesment matrix - Et Prioriteringsværktøj
Selection of essentials in equipment integrity Midlertidige reparationer Management of change Risk based inspection Injectionspoints Inspection of dead legs Small bore piping Pipeline integrity inspections Flare inspection Brittle fracture prevention Dew point corrosion Equipment integrity 20 essential elements Kritiske none return valves CUI korrosion under isolering Soil to air interface of buried piping Flange bolting procedures Handling of pressure relief devices Inspection tank roof/ bottoms Idle and retired equipment Inspection staffing / competances On-stream inspection OSI None intrusive inspection NII
Integrity management The HSSE tablestake LoPC Process safety Equipment Integrity - 20 essentielle elementer CUI - Et eksempel Risk Based Approach - RAM Risk assesment matrix - Et Prioriteringsværktøj
Inspection strategy General pipe inspection code er API 570 Code for definition af CUI susceptible areas er API 574 Degradation modes / korrosion Men for CUI 1) age related 2) non age related 3) a strategy based inspection
Inspection strategy API 570/ API 574 Class Interval Coverage % Coverage (in case CUI found ) % 1 5 year 50% 75% 2 5 year 33% 50% 3 10 year 10% 25% 4 Optional Optional Optional
Alvorlighedsgrad Mennesker Økonomi Miljø Omdømme Risiko matrix Konsekvens Stigende hyppighed A B C D E Aldrig hørt om I industrien Hørt om I industrien Er sket I Firmaet Sker årligt i Firmaet Sker årligt i lokal afdeling S< 10-5 S< 10-4 S< 10-3 S< 10-2 S< 10-1 0 1 Ingen skade TRC Ingen skade < 50 kkr Ingen Skade Lille skade Ingen Opmærksomhed Nogen Opmærk somhed 2 LTI < 100 kkr Mindre skade Lokal bekymring 3 4 Major Stor Skade injury or health effect PTD Eet or up to Dødsfald 3 fatalities Moderate < 1 mill kr damage Major <10 mill kr damage Lokaliseret Moderate effect skade Omfattende Major effect Skade Moderate Lokal impact modstand Major National impact modstand 5 More Flere than 3 dødsfald fatalities Massive >10 mill kr damage Massive effect Skade Massive Interimpact National modstand
CUI Susceptibility score table Shell Raffinaderiet Fredericia
CUI Criticality Matrix Shell Raffinaderiet Fredericia
Loss of Equipment integrity
CUI Korrosion under isolering Tabt integritet af Flare ------------------ Kollapset selvbærende rørkonstruktion